Second Deposit LDP

Ended on the 14 April 2023
For instructions on how to use the system and make comments, please see our help guide.

11. Policies

11.1 The following sections set out the Strategic Policies which form the framework for implementing and delivering the LDP. The format and structure reflect the core elements of sustainability and sustainable development, and the four well-being objectives or themes as identified within the Carmarthenshire Well-being Plan. This allows the Strategic Policies to cross reference to the strategic objectives set out in this document as well as the relevant Well-being goals. The strategic policies will therefore be set within the following themes:

Early Intervention – To make sure that people have the right help at the right time; as and when they need it.

Prosperous People and Places – To maximise opportunities for people and places in both urban and rural parts of our county.

Healthy Habits – People have a good quality of life, and make healthy choices about their lives and environment.

Strong Connections – Strongly connected people, places and organisations that are able to adapt to change.

11.2 It is recognised that there will be some overlap between the respective themes and their policies and as such they should be read in conjunction with one another. Each strategic policy is accompanied by an explanatory text.

Early Intervention – To make sure that people have the right help at the right time; as and when they need it.

11.3 The implications for the well-being of individuals, their families and communities are recognised within the Plan through a focus on creating sustainable and inclusive places. This connected approach across all the themes allows long term solutions to ensure opportunities are available to maintain and enhance well-being.

11.4 It recognises that sustainable places are created from a balance of environmentally friendly, economically vibrant, and socially inclusive characteristics, that aim to benefit not only current inhabitants but also future generations.

11.5 Whilst it is recognised that there is an overlap between the themes and the assignment of policies the following having been identified under the Early Intervention theme:

  • Strategic Policy – SP 1: Strategic Growth
  • Strategic Policy – SP 2: Retail and Town Centres

11.6 The following policies seek to support the delivery of the Plan's strategic objectives, but also provide high level links and broad conformity with the Well-Being Goals.

Strategic Policy - SP1: Strategic Growth

The LDP will provide for the future growth of a sustainable economy and housing requirement through the provision of:

  1. 9,704 new homes to meet the identified housing requirement of 8,822.
  2. A minimum of 71.21ha of allocated employment land.

The focus on regeneration and growth reflects the Council's core strategic ambitions with development distributed in a sustainable manner consistent with the spatial strategy and settlement framework.

11.7 This Revised LDP puts at its heart the creation of a balanced and cohesive County. It recognises that to deliver this the County's role as a strong and economic driver for growth locally, regionally and nationally places Carmarthenshire at the centre of a prosperous and sustainable Wales. The Plan's strategy for growth is formulated on the basis of sustainable development principles and in accordance with the goals and aspirations of the Well-being of Future Generations Act. The Plan's strategy also reflects Llanelli's significance as part of the Swansea Bay and Llanelli National Growth Area identified in Policy 28 of the National Development Framework and Carmarthen as an area for regional growth as identified in Policy 29 – Regional Growth Areas – Carmarthen and the Haven Towns.

11.8 The strategic approach builds on the corporate emphasis on regeneration and the opportunities presented through the City Deal and other regeneration and investment opportunities, whilst also recognising the opportunities presented through the rural economy and diverse needs of communities across the County. The strategy recognises the role employment plays in creating a prosperous County – with appropriate growth of housing with jobs and employment opportunities.

11.9 The Council, as part of its corporate policy, places regeneration as its number one objective. This is reflected through:

  • Cabinet Vision Statement 2022–2027;
  • Carmarthenshire Economic Recovery & Delivery Plan (2021);
  • Moving Forward in Carmarthenshire: The Council's New Corporate Strategy 2018–2033;
  • Moving Rural Carmarthenshire Forward (2019);
  • South West Wales Regional Economic Delivery Plan (2021);
  • South West Wales Regional Plan for Regeneration;
  • The Swansea Bay City Deal (2017);
  • Swansea Bay City Region Economic Regeneration Strategy 2013–2030; and
  • Transformations: A Strategic Regeneration Plan for Carmarthenshire 2015–2030.

11.10 This focus on job creation and investment is based on Carmarthenshire's strategic location and its regional economic role. This strategy seeks to recognise and reflect this, and the corporate objectives, by supporting and creating an attractive place for workers and investors.

11.11 By ensuring that our housing growth requirements are reflective of, and are in support of our economic ambitions, it allows for a co-ordinated and integrated approach to ensure that the shared role for economic growth is not in isolation of housing and vice a versa.

11.12 This approach requires the development of a balanced set of population and household projections that develop on the principles of Welsh Government's 2018-based projections. This is to ensure there is a sufficient supply of homes to support the delivery of our economic ambitions and the needs of our communities.

11.13 The population and household trends set through the Welsh Government's 2018-based projections follow similar lower growth demographic patterns of previous WG projections. They do not however reflect the positive ambitions of the County and the Region over the plan period. Consideration must also be given to the rates of housing completions over the preceding years, which are far above the WG 2018 projection requirements. This strategy, and its growth levels are intended to be ambitious but deliverable and reflect wider objectives than this Revised LDP alone.

11.14 This Strategy will seek to distribute growth through a sustainable settlement hierarchy derived from the preferred spatial option. It recognises the diversity across the County and its rich environmental, biodiversity, natural, and built landscape credentials. In delivering this strategy, it also recognises the role Carmarthenshire's rural areas and its urban areas contribute to delivering its vision for 'One Carmarthenshire'.

11.15 We will work closely with partners, infrastructure providers, developers, investors, and communities in delivering the Revised LDP and its strategy, policies, and proposals.

SG1: Regeneration and Mixed-Use Sites

Provision is made for mixed use allocations for the following sites:

Site Ref.

Location and Proposed Uses

PrC1/MU1

West Carmarthen, Carmarthen

Mix of uses consisting of residential (an allowance for 700 new homes within this plan period), employment, community facilities and amenity. A key deliverability indicator is the Carmarthen West Link Road which is now completed and open.

PrC1/MU2

Pibwrlwyd, Carmarthen

Includes a mix of uses reflecting its strategic location and contribution to Carmarthen. Uses include employment, commercial leisure, education associated with Coleg Sir Gâr and residential (an allowance is made for 247 new homes).

PrC2/MU1

Former Old Castle Works, Llanelli

Mix of uses focused on the visitor economy, heritage and leisure. No residential allowance made.

PrC2/MU2

Trostre Gateway, Llanelli

Mix of uses reflecting its prominent location and planning history.

PrC2/MU3

Former YMCA Building, Stepney Street, Llanelli Town Centre

A mix of uses at a town centre location, with an allowance for 8 residential units

PrC3/MU1

Emlyn Brickworks, Penygroes

Provides for the regeneration of a previously developed site. A key deliverability indicator is the Cross Hands Economic Link Road which is under construction. Provision is made for the delivery of community focused development along with 177 new homes.

SeC4/MU1

Burry Port Waterfront

Mix of uses focused on appropriate retail provision along with commercial / tourism related uses. No residential allowance made.

SeC16/MU1

Beechwood, Llandeilo

Includes a mix of uses reflecting its strategic location and contribution to Llandeilo. Uses include a mix of appropriate employment, commercial and retail. Site forms part of a larger area which has been identified as a C2 flood risk zone. Applications will need to satisfy all requirements in this respect.

SeC20/MU1

Laugharne Holiday Park

Mix of uses focused on tourism and leisure proposals and associated with the re-development of Laugharne Holiday Park.

PrC1/MU3

Nant y Caws Regeneration and Mixed-Use Site

A strategically positioned site already utilised for the sustainable management of waste. It offers the future opportunity to potentially harness energy from waste, and related employment-based activities. Future opportunities could be set out through the development of a masterplan for the site.

Table 3: Regeneration and Mixed Use

11.16 The above and their identified uses will, where appropriate, be further considered through SPG in the form of development briefs. These briefs will address the development of the sites in greater detail in a comprehensive and coordinated way ensuring that proposals are integrated in terms of the phasing of different elements and the provision of key deliverability drivers such as infrastructure provision.

SG2: Reserve Sites

Reserve Sites will be released for development if the allocated sites (identified under policies HOM1, EME1 and SG1) fail to contribute as expected to the delivery of the Plan's strategy, or where there is a requirement to react to a material and significant contextual change, including but not exclusively related to changes in National Planning Policy.

The decision to release a site or remove an existing allocated site arising from non–delivery will be made by the Local Planning Authority in accordance with the monitoring framework and a future LDP Review Report.

Site Ref:

Description

SG2/1

Former Morlais Colliery, Llangennech

The site's potential strategic contribution incorporating employment and residential based proposals is within the context of Swansea Bay and Llanelli's position within the emerging National Development Framework.

SG2/2

Land adjacent to Silver Terrace, Burry Port

The site offers potential for the provision of employment floor space with a live / work element.

SG2/3

Cross Hands Employment Zone

A strategically positioned site adjacent to an established employment hub that can accommodate any future demand for large units more than 10,000 sqm. The site is close to the facilities within the Cross Hands and the strategic highway network.

SG2/4

Former Ennis Caravans, Cross Hands

Located in the Principal Centre in Cross Hands, this previously developed site presents opportunities for future residential development. Its non-inclusion as an allocation reflects doubts over immediate delivery, however it will be monitored and reviewed with its future contribution considered in line with this policy.

Table 4: Reserve Sites

Proposals for development on Reserve Sites, including as part of mixed-use development must:

  1. Be brought forward in line with an agreed masterplan, in accordance with the provisions of this Plan, and cover the whole of the Reserve Site, and
  2. Not lead to over provision which would jeopardise the delivery of allocated and deliverable sites.

11.17 The purpose of this Policy is to establish the principle of mixed-use development (including housing) on these sites and stimulate the market to resolve issues and bring forward the sites when necessary.

11.18 Specific evidence should be provided that clearly shows, to the satisfaction of the Local Planning Authority, that development proposals accord with the following LDP policies:

  • PSD1: Effective Design Solutions: Sustainability and Placemaking
  • PSD2: Masterplanning Principles – Creating Sustainable Neighbourhoods
  • PSD3: Green and Blue Infrastructure Network
  • PSD4: Green and Blue Infrastructure – Trees, Woodlands and Hedgerows
  • TRA1: Transport and Highways Infrastructural Improvements
  • TRA2: Active Travel
  • SP9: Infrastructure
  • INF1: Planning Obligations
  • CCH6: Renewable and Low Carbon Energy in New Developments

11.19 The need for reserve sites will be closely monitored through take-up of allocated sites as part of the monitoring framework of this Plan and reported through the Annual Monitoring Report. In the event that the allocated sites (identified under policies HOM1, EME1 and SG1) fail to contribute as expected to the delivery of the Plan's strategy, then the decision to utilise a Reserve Site will be made as part of a formal plan review.

11.20 The need to identify an alternative range of reserve sites is necessary to ensure that the LDP strategy provides sufficient flexibility if development on allocated and existing commitments stalls. Regard will be had to the requirements of Future Wales and the upcoming preparation of a Strategic Development Plan (SDP) for the region.

SG3: Pembrey Peninsula

Proposals that contribute towards unlocking the potential of the Peninsula as a destination to stay, play, and work will be supported where they respect the area's role, function and sense of place.

Proposals should build upon established uses and features within this expansive coastal location in recognition of the area's natural and built historic qualities.

11.21 The Peninsula consists of some 1,780 hectares along the A484 road and London to Fishguard Rail Line transportation corridor. It extends from the outskirts of the historic town of Kidwelly on the mouth of the Gwendraeth Fach to its north. The east is bordered by the A484, London to Fishguard Rail line and the Pinged flats. The south / south-east is bordered by the Millennium Coastal Park.

11.22 Whilst the Peninsula is well placed to attract an integrated and strategic package of regeneration and investment, it is also an ecologically sensitive area that is subject to a range of developmental considerations.

11.23 The sense of place is framed by a contrasting range of uses and features. These include Pembrey Country Park to the south, with the motor racing circuit and airport to the north.

11.24 The area continues to function as a key resource for residents, visitors, and biodiversity alike. In this regard, development proposals that would unduly compromise the ongoing resource for our future generations would not be supported.

11.25 The Council will prepare Supplementary Planning Guidance to provide further elaboration upon the provisions of this policy and the future opportunities within the Peninsula.

Strategic Policy – SP 2: Retail and Town Centres

Proposals for retail and other town centre use development will be considered in accordance with the following retail hierarchy and the provisions below:

Sub Regional - High Order Town Centre

Carmarthen

Mid Order Town Centres

Llanelli

Ammanford

Lower Order Town Centres

Burry Port

Llandeilo

Llandovery

Newcastle Emlyn

St. Clears

Whitland

  1. Proposals for retail and other appropriate town centre uses within the Carmarthen town centre boundary (including leisure, civic, cultural, education, business, health and residential (on upper floors)) which support the growth of Carmarthen as a sub-regional retail town centre will be permitted where they maintain and enhance the vitality, viability and attractiveness of Carmarthen Town Centre. Proposals should not:
    1. undermine the retail function of the centre, or have a detrimental effect upon the vitality or viability of the area; and
    2. create a concentration of non-retail ground floor frontage detrimental to the retail character and function of the area.
  2. The vitality, viability and attractiveness of our retail centres will be maintained and enhanced along with the range of their existing uses, including local markets. Proposals within the town centre boundaries, which widen the range of uses and encourage convenient and accessible shopping, services, public services and facilities, and employment/business opportunities will be supported.
  3. Proposals for convenience stores outside of the defined town centre boundary will be subject to:
    1. The submission of an impact assessment to demonstrate that the proposal would not have an adverse effect on the vitality and viability of the existing retail centre;
    2. Evidence of a sequential test having been applied to the site selection;
    3. Evidence of quantitative and qualitative need for the development; and,
    4. Evidence of the site's accessibility to sustainable modes of transport.
  4. d) Proposals for retail and other town centre uses within the town centre boundary will be supported which, where applicable:
    1. Provide opportunities for independent retail and commercial sectors;
    2. Support and do not undermine the continued retail function of the high and mid order town centres;
    3. Promote and diversify the education, leisure, cultural facilities, and the night-time economy;
    4. Provide for the creation of quality public spaces and environmental improvements including the preservation and enhancement of the distinctive local character of the historic built and natural environment, and a commitment to high quality design;
    5. Improve places for pedestrians, cyclists and people with health conditions or impairments including enhancing public transport, accessibility, access to public facilities and conveniences, car parking, signage, and the street scene; and,
    6. Protect, enhance, and integrate with the Green and Blue Infrastructure network.

Outside of the above town centre boundaries the following forms of retail provision and other town centre uses may be permitted:

  1. New non-food retail warehouse units (including garden centres, car showrooms and ancillary supporting facilities), appropriate leisure facilities on designated retail parks and trade centre uses on employment sites, where they are supported by the relevant evidence noted below:
    1. an impact assessment demonstrating that the proposal would not cause harm to established town centres;
    2. evidence that a sequential approach has been undertaken indicating that there are no suitable available and sustainable sites in locations within or immediately adjoining defined town centres;
    3. evidence of quantitative, qualitative and/or other relevant need for the development;
    4. evidence of the site's accessibility to sustainable modes of transport.
  2. Proposals for small local convenience shopping facilities in rural and urban areas within the development limits where they are of a scale appropriate to that settlement. Rural retail proposals will be considered in accordance with policy RTC2.

11.26 The policy seeks to recognise the general pattern of provision in a traditional hierarchy of centres ranging from the small, localised provision through to the larger centres providing a greater choice over a wider product range. The larger centres also act as locations for related activities in the leisure and entertainment sphere including cinemas and restaurants etc. and for commercial office uses including solicitors, accountants, and estate agents etc.

11.27 In general, local provision represents goods and services required on a day-to-day basis (convenience items) and for which residents may make short journeys frequently, whilst the larger centres not only provide such facilities, but also more specialised items (comparison goods) sought less frequently and for which shoppers are prepared to travel further. Traditionally, shopping provision has evolved in a hierarchy of centres with overlapping catchments reflecting their size and importance.

11.28 It is this pattern of retail provision which characterises Carmarthenshire with the traditionally larger centres of Carmarthen, Llanelli and Ammanford historically serving larger catchment areas with a broad and specialised range of goods and items.

11.29 In defining a retail hierarchy, regard has been given to the respective roles and functions of the larger towns and small villages. In this respect it is acknowledged that whilst the range of shopping provision throughout the hierarchy plays an essential role, the Principal Centres of Carmarthen, Llanelli and Ammanford, provide the focus of town centre-based retail activity. These centres are the primary non-food comparison shopping destinations and cater for main and bulk food and grocery shopping. Other smaller town centres have a limited range and choice of comparison goods shopping and cater primarily for top-up food and grocery shopping. However, it is also recognised that each of these centres perform different roles within the context of their communities and wider geographical functions. In this respect, Carmarthen town centre fulfils a sub-regional function whilst Ammanford and Llanelli town centres are more focused on serving its surrounding communities. The policy, however, also seeks to recognise the impact of Covid-19 and change shopping patterns has had on our high streets and town centres. In this respect, the policy seeks to reflect their intrinsic retail function whilst recognising a new multifunctional role for such centres.

11.30 It is acknowledged however, that despite their inherent differences each centre has, and is experiencing different challenges as the future role of the high street changes in response to different retail pressures. In this respect TAN4 makes provision for the application of appropriate policies to those centres based on their characteristics and sustainability. In responding to this locally driven approach, variations in respect of what constitutes a higher and lower order centre allows for a more focused but flexible response based on their different scales and characteristics. It also enables the Plan to respond to changing economic circumstances and to seek to address variations in retail activity.

11.31 In characterising higher order retail and commercial centres, TAN4 identifies them as being accessible to a large number of people, and the scale and diverse range of uses present will reflect the needs of a population – this is normally greater than the local community. With such centres typically characterised by combinations of shops, offices, financial & professional services, food and drink establishments, hotels, education facilities, entertainment and leisure, non-residential institutions as well as residential (TAN4 para. 4.2).

11.32 Alternatively, lower order centres are characterised by smaller scale provision and fewer uses, with the intention of primarily serving the needs of a local community. These would typically include shops, financial and professional services, food and drink, and non-residential institutions of an appropriate scale, but depending on the centre may include other uses (TAN4 para 4.3).

11.33 In relation to the previous status of both Llanelli and Ammanford, their high streets have experienced challenging times with both retaining important, albeit slightly diminished retail roles. In further considering where their future along with that of Carmarthen may lie in terms of the retail hierarchy, it is important to consider how they will develop and their future role as well as how the Plan seeks to respond to a potential decline in that centre.

11.34 Carmarthen has a longstanding sub-regional role and has traditionally had a strong national presence on its high street as well as a variety of local stores. The nature of its retail offer has however been notably impacted by Covid-19 with a number of national operators having withdrawn in light of the financial challenges and realignment within the retail sector. Consequently, whilst the centre does and will continue to serve a range of needs for the population beyond its local community the nature of its offer and the range of uses within the traditional retail core must be adaptive whilst retaining that traditional retail base. The centre continues to be readily characterised as a higher order retail centre by the provisions above.

11.35 In relation to both Llanelli and Ammanford, the occupation of the town centre by national operators remains at a reduced level and with the town centre offer increasingly reflective of one that serves a more localised community. This coupled with the challenges around turnover of retail units, and issues around vacancy rates, requires a re-evaluation of their previous high order centre status. Both Ammanford and the Llanelli town centres have attracted significant interventions in regeneration terms, with Task Forces established to face some of the challenges prevalent in both centres, with the latter having also been subject to a now expired focused Local Development Order (LDO). Further time limited LDO's have been adopted for Carmarthen and Ammanford Town Centres as part of regeneration initiatives to aid in the Covid-19 recovery and town centre regeneration. The future role of these and the potential for a further Llanelli Town Centre LDO will be further reviewed as tools to assist in the implementation of this Revised LDP.

11.36 The changing dynamics within the retail offer for both these centres brings added focus on the need for the hierarchy and the retail policies to provide a locally driven response to their issues. Consequently, the hierarchy has been established with appropriate policies to allow for different types of retail and commercial context between the Plan's three Principal Centres. These will allow a more flexible approach in relation to how these centres develop in the future.

11.37 The smaller towns or market towns of, for example, Newcastle Emlyn, Llandeilo, and St Clears with their smaller local catchments typically meet local needs with some specialised provision. This is supplemented by often larger villages which may provide essential items required to meet day to day needs. Regard will be had to the implications of proposals for new convenience stores outside of the identified High, Mid and Lower Order centres (defined within the Policy) on defined retail centres within neighbouring authorities. Proposals which may have an adverse impact should be accompanied by a robust retail impact assessment.

11.38 The retail strategy of the LDP reflects the social, economic, and environmental principles of sustainable development which underpins the Plan. It also seeks to reflect the changing nature of retailing and the need for traditional town centres to adapt to such changes. The Strategy seeks to:

  1. Protect and enhance the roles of the retail centres to ensure their continued attractiveness as town centres, shopping, commercial and leisure destinations and to protect local retail provision established in the county as well as the local businesses behind them. The challenge will be to maintain their competitiveness and market share whilst understanding the needs of each centre and their respective role and contribution in retail terms;
  2. Locate and guide retail provision to sustainable locations which are accessible by public transport or active travel routes in order to minimise the need for travel;
  3. In smaller lower order centres, ensure that local communities have reasonable access to a satisfactory range of high street facilities and services, particularly convenience goods (food and other essential day-to-day requirements); and,
  4. In the larger villages, maintain the viability of the village shop and other local facilities.

11.39 The Updated Retail Study (2022) for Carmarthenshire examines retail, leisure and town centre issues across the County and assessed the capacity for growth across the retail, food/beverage and commercial leisure sectors. It is prepared to provide evidence in respect of policy formulation and to inform the identification of a retail hierarchy for the Plan area to guide decision making, as required by PPW. Consequently, the "town centres first" principle in tandem with a sequential approach to the selection of sites will be used to promote town centres as the principal locations for new retail, office, leisure and health facilities. In doing so, the aim will be to create more reasons why people should visit such centres with a resultant increase in social and economic activity thereby retaining its viability.

11.40 Allowing for the variations in the hierarchy, retail will be expected to continue as the principal activity in all three sub-regional and mid order centres. However, this is only one of the factors which contribute to their wellbeing. Retail policies cannot be divorced from the broader functions of the larger towns as centres for other services and facilities, including food and drink establishments (cafes, restaurants, public houses, etc.) and commercial leisure developments. The retail, food/beverage and leisure needs assessment in the Updated Retail Study suggests there may be limited scope for future retail development and any projected growth should seek to reoccupy vacant floorspace within town centres where possible. However, there is potential scope to improve the food /beverage and commercial leisure sectors. This diversity of uses in town centres assists in promoting their continued viability and - particularly with regard to leisure and residential uses - contributes to the vitality of a successful evening economy and their role as living town centres.

11.41 The Revised LDP seeks to strike a balance between protecting the overall retail character of the town centres and providing for an appropriate diversity of uses which reflects their position within the hierarchy. In so doing, it is recognised that its character and identity is augmented by the presence of independent traders traditionally operating from the more peripheral streets and in locations and that can be susceptible to competition. It is however recognised that diversification enables other beneficial, economic uses to complement the retailing presence and to maintain the physical fabric and appearance of streets and buildings which may otherwise be susceptible to decline.

11.42 The potential for appropriate diversification within the town centres enabled through this policy, recognises their contribution to increasing its overall attractiveness. The introduction of complementary retail, leisure and business offers etc can contribute to a broader appeal, nevertheless, the policy recognises the importance of a strong retail element and seeks to maintain the vitality and viability of the towns' retail offer.

11.43 Provision outside the sub-regional and mid order centres, including local village shops, make an important contribution to the retail function of Carmarthenshire. In this respect, those centres fulfilling a convenience retail need and smaller scale day to day shopping need provide diversity consistent with the objectives of sustaining communities and minimising the need to travel. These settlements and their retail offer can complement the established retail function of those higher up the hierarchy as well as contributing to the implementation of the Plan's Strategy. Proposals for convenience retail outside of the town centre boundary in such centres may be required to appropriately evidence the retail need to ensure the retailing activities within the town centres are not undermined.

11.44 The LDP policies also seek to ensure that retail, non-retail, and leisure developments are located in the most appropriate locations. Generally, the most appropriate locations are within existing centres, which are accessible by a range of means of transport and can promote linked trips to other uses in the centre. Developers will be required to search thoroughly for sites within centres before considering less centrally located ones.

11.45 Further guidance in respect of national planning policy is contained within PPW: Edition 11 - Chapter 4 Active and Social Places and within TAN4 Retailing and Town Centres.

11.46 Town Centres are not always capable of accommodating particular types of retailing or other town centre uses such as bulky goods owing to the requirements for large sites and buildings and the implications for traffic generation and parking. Consequently, such outlets have been permitted in out-of-centre locations in accordance with national guidance, either in the form of individual units or collectively on retail parks. If pressure for such outlets continues, then the Revised LDP seeks to address the issue of retail parks and defines the criteria to be applied to prospective developments. In this respect, the policies relating to retail parks promote the co-location of appropriate retail facilities and reducing the proliferation of separate retail destinations within the County, provided the need, impact and sequential tests are satisfied. Such a strategy is more sustainable in transport terms and will allow retail businesses to benefit from the collective attraction of co-location.

11.47 The Plan recognises that certain types of retail and leisure facilities may not be suitably accommodated within town centre locations and that Regional Centres (Retail Parks) can play a role in accommodating this need. However, the scale, type and location of retail development should not undermine the attractiveness, vitality, and viability of existing town centres.

11.48 A sequential approach should be adopted which means that first preference should be for existing town centre locations as listed in the retail hierarchy, and then for sites immediately adjoining town centres. If there are no suitable available sites in these locations, only then may development in edge of centre locations be considered followed by, but not limited to, the following existing regional centres (retail parks) will be considered:

11.49 Regional Centres: (Retail Parks)

11.50 Carmarthen and Llanelli have significant retail provision on retail parks located outside of the respective town centres. The principal retail parks in Carmarthen are at Stephens Way and Parc Pensarn which provide for a range of bulky and non-bulky goods.

11.51 Llanelli is served by Parc Trostre and Parc Pemberton with the former exhibiting a large number of units predominantly occupied by 'high street multiples'. Parc Pemberton is by contrast mainly focused around DIY, electrical and furniture reflecting a bulky goods restriction which does not apply to Parc Trostre.

11.52 The retail park at Cross Hands, whilst smaller in scale to those in Carmarthen and Llanelli, provides an important complementary role to the town centre provisions in Ammanford through its predominantly DIY, electrical and furniture offer.

11.53 Where retail development is proposed outside of the town centre boundaries, the applicant will be required to submit an impact assessment to demonstrate that the proposal would not cause harm to established town centres. The assessment should also take into consideration the cumulative effects of recently completed development and outstanding planning permissions. The assessment should outline the type of retail offer proposed by the applicant and how this could impact upon competing retail provision which exists in the nearby town centres and whether it could result in the diversion of trade from the town centre.

11.54 PPW Ed. 11 gives specific recognition for the role local and village shops and public houses play within communities and the potential impact of their loss. Consequently, reference should therefore be made to policy RTC2 below.

11.55 Proposals for retail activity within rural Carmarthenshire should be considered in accordance with policy RTC2.

RTC1: Protection of Local Shops and Facilities

Proposals which would result in the loss of a local shop, service or community facility (including Public Houses) outside of the Town Centres identified within Strategic Policy SP2 will only be permitted where:

  1. Its loss would not be detrimental to the social and economic fabric of the community;
  2. There is another shop or service of a similar compatible use available for customers within the settlement or within a convenient walking distance.

In the absence of an alternative provision, proposals resulting in the loss of the local shop, or service will only be permitted where all reasonable attempts have been made to market the business for sale or let over a 12 month period and have failed.

11.56 In seeking to define and create sustainable communities the Plan identifies and recognises the contribution of local services. These include such facilities as shops, post offices, public houses, petrol filling stations, which will contribute to the future viability of settlements and communities, both in terms of providing a service but also in offering 'meeting places' where community interaction can occur and community spirit can be enhanced. Moreover, the LDP supports local retail provision and the economic benefits which they present within the communities.

11.57 The Council also recognises the importance of community facilities and services where there is a strong local dependence on them. Such services are vital to the economic wellbeing of the communities and also promote social inclusion, particularly amongst the less mobile members of a community.

11.58 It is acknowledged that the rural settlements are the most vulnerable to the loss of such facilities. Factors such as demand and the high value of residential land in the rural areas, often results in pressure from property owners to change the use or redevelop such facilities for residential purposes, even where the business is thriving. The income from a shop or other activity may be less than can be gained from an alternative development. This policy seeks to moderate pressures for change by ensuring that unless there are reasonable alternative facilities, and if the shop or facility is viable at appropriate rent levels, then its loss will not be allowed.

11.59 Whilst the policy seeks to protect against the loss of facilities, provision is made for those circumstances where it can be demonstrated that such facilities are no longer needed or are not viable.

11.60 A walkable distance for the purposes of this policy is as contained within the Manual for Streets: Department for Transport/Communities and Local Government/WAG – 2007[48]. This identifies that 'Walkable neighbourhoods are typically characterised by having a range of facilities within 10 minutes (up to about 800m) walking distance of residential areas which residents may access comfortably on foot'.

11.61 Marketing of premises for the purposes of this policy can be defined as advertised within an appropriate industry publication or where appropriate, through local estate agents over a reasonable period and for a reasonable price.

RTC2: Retail in Rural Areas

Proposals for ancillary small-scale shops or extensions to existing shops outside development boundaries will be permitted where they conform to the following:

  1. It represents a subordinate element of an existing business activity on the site;
  2. It will not result in significant harm to the viability of nearby village shops;
  3. It would not have an adverse impact on the character, setting and appearance of the area and the surrounding landscape and where appropriate, townscape;
  4. It is accessible via sustainable means of transport; and,
  5. Access and parking arrangements are satisfactory, and the development will not significantly harm highway safety.

11.62 Proposals for new shops in rural areas which are ancillary to other uses can often provide an important contribution to the rural economy. Such provision, be they in the form of farm shops (that will help to meet the demand for fresh produce), craft shops and shops linked to petrol stations, not only service a local requirement but are also a source of employment.

11.63 Whilst such provision has the potential to provide a service to rural communities it must be reflective of its rural context. In this regard, the shop should be related to and subordinate to an existing business and should not exceed 200 square metres gross of floorspace.

11.64 It is recognised that shops in rural areas can create additional employment opportunities and aid rural economic diversification as well as providing a service to local communities.

11.65 The Council may seek to use planning conditions to limit the range of goods sold or restrict the amount of floor space where appropriate, to prevent any significant harm to nearby retail activity. Regard will also be had to the potential for the proposal to operate on a seasonal basis where it is not desirable for it to operate throughout the year.

11.66 Shops ancillary to other uses, such as farm shops that will help to meet the demand for fresh produce, craft shops and shops linked to petrol stations, can as identified play an important role in rural areas by providing new sources of jobs and services. However, in assessing such proposals the regard will be had to the potential impact on nearby retail and commercial centres and notably village shops[49]. Consideration will be given to the use of planning conditions to limit the range of goods sold or restrict the amount of floor space if this allows the development to proceed.

Prosperous People and Places - To maximise opportunities for people and places in both urban and rural parts of our county.

11.67 Socio-economic issues including poverty and deprivation facing both rural and urban parts of our County is recognised within this Plan's "One Carmarthenshire" vision. To this end, this Plan seeks to tackle these issues by maximising opportunities for everyone to maintain or increase their prosperity and sense of wellbeing.

11.68 These opportunities include the provision for new homes including affordable homes and jobs, as well as steering new investment and infrastructural priorities, whilst also respecting the County's social fabric, including the Welsh language, culture and its sense of place.

11.69 Whilst it is recognised that there is an overlap between the themes and the assignment of policies the following having been identified under this theme:

  • Strategic Policy – SP3: Sustainable Distribution – Settlement Framework
  • Strategic Policy – SP 4: Providing New Homes
  • Strategic Policy – SP 5: Affordable Homes
  • Strategic Policy – SP 6: Strategic Sites
  • Strategic Policy – SP 7: Employment and the Economy
  • Strategic Policy – SP 8: Welsh Language and Culture
  • Strategic Policy – SP 9: Infrastructure
  • Strategic Policy – SP 10: Gypsy and Traveller Provision
  • Strategic Policy – SP 11: The Visitor Economy
  • Strategic Policy – SP 12: Placemaking, Sustainability and High-Quality Design

11.70 The following policies seek to support the delivery of the Plan's strategic objectives, but also provide high level links and broad conformity with the Well-Being Goals.

Strategic Policy – SP3: Sustainable Distribution – Settlement Framework

The provision of growth and development will be directed to sustainable locations in accordance with the following spatial framework.

Cluster 1

Cluster 2

Cluster 3

Cluster 4

Cluster 5

Cluster 6

Tier 1 – Principal Centre

Carmarthen

  • Llanelli
  • Ammanford/

Crosshands

Tier 2 – Service Centre

  • Pontyates /

Meinciau /

Ponthenri

  • Ferryside
  • Kidwelly
  • Burry Port
  • Pembrey
  • Hendy / Fforest
  • Llangennech
  • Trimsaran/
  • Carway
  • Brynamman
  • Glanamman /

Garnant

  • Pontyberem /

Bancffosfelen

  • Newcastle Emlyn
  • Llanybydder
  • Pencader
  • Llandovery
  • Llandeilo / Rhosmaen / Ffairfach
  • Llangadog
  • St Clears/ Pwll Trap
  • Whitland
  • Laugharne

Tier 3 – Sustainable Villages

  • Cynwyl Elfed
  • Llanybri
  • Llansteffan
  • Bronwydd
  • Cwmdwyfran
  • Cwmffrwd
  • Llangyndeyrn
  • Brechfa
  • Llangain
  • Idole / Pentrepoeth
  • Peniel
  • Alltwalis
  • Llanpumsaint
  • Llandyfaelog
  • Rhydargaeau
  • Llanarthne
  • Capel Dewi
  • Nantgaredig
  • Pontargothi
  • Llanddarog
  • Porthyrhyd
  • Cwmduad
  • Mynyddygarreg
  • Five Roads / Horeb
  • Llansaint / Broadway
  • Carmel
  • Cwmgwili
  • Foelgastell
  • Ystradowen
  • Llannon
  • Llanedi
  • Drefach / Felindre
  • Waungilwen
  • Llangeler
  • Pentrecwrt
  • Saron/Rhos
  • Llanllwni
  • Cwmann
  • Capel Iwan
  • Llanfihangel ar arth
  • Trelech
  • Pontyweli
  • Cenarth
  • New Inn
  • Caio
  • Ffarmers
  • Llansawel
  • Talley
  • Cwrt Henri
  • Llanfynydd
  • Llanwrda
  • Cwmifor
  • Salem
  • Abergorlech
  • Llanboidy
  • Glandy Cross
  • Efailwen
  • Llangynin
  • Meidrim
  • Bancyfelin
  • Llangynog
  • Pendine
  • Llanddowror
  • Llanmiloe

Cluster 1

Cluster 2

Cluster 3

Cluster 4

Cluster 5

Cluster 6

Tier 4 – Rural Villages

(No development limits)

  • Hermon
  • Abernant
  • Blaenycoed
  • Bancycapel
  • Nantycaws
  • Croesyceiliog
  • Crwbin
  • Felingwm Uchaf
  • Felingwm Isaf
  • Llanegwad
  • Pontantwn
  • Nebo
  • Talog
  • Penybont
  • Whitemill
  • Pont-newydd
  • Pontarsais
  • Cynheidre
  • Four Roads
  • Penymynydd
  • Capel Seion
  • Derwydd
  • Heol Ddu
  • Maesybont
  • Milo
  • Pantllyn
  • Pentregwenlais
  • Temple Bar
  • Cefnbrynbrain
  • Rhosamman
  • Drefach (Llandyfan)
  • Stag and Pheasant
  • Mynyddcerrig
  • Penboyr
  • Drefelin
  • Cwmpengraig
  • Cwmhiraeth
  • Pentrecagal
  • Gwyddgrug
  • Dolgran
  • Bancyffordd
  • Bryn Iwan
  • Pencarreg
  • Ffaldybrenin
  • Crugybar
  • Cwm-du
  • Ashfield Row
  • Felindre (Llangadog)
  • Cynghordy
  • Golden Grove
  • Broad Oak
  • Trapp
  • Manordeilo
  • Penybanc
  • Felindre, (Dryslwyn)
  • Dryslwyn
  • Rhydcymerau
  • Waunystrad Meurig
  • Bethlehem
  • Capel Isaac
  • Llangathen
  • Llansadwrn
  • Rhandirmwyn
  • Porthyrhyd
  • Pumsaint
  • Cilycwm
  • Cwmfelin Mynach
  • Cwmbach
  • Blaenwaun
  • Llanglydwen
  • Cwmfelin Boeth
  • Cross Inn
  • Llansadurnen
  • Broadway
  • Red Roses
  • Llanfallteg

Table 11: Settlement hierarchy

11.71 The Plan seeks to distribute growth and development spatially across the County, with settlements allocated to one of 6 clusters within the hierarchy. The cluster-based approach is flexible in apportioning new growth and avoids any assumption that every settlement in every tier must contribute towards growth. Regard has also been given to cross boundary settlements, and how they impact on the role and function of Carmarthenshire's border settlements. These include: Pontarddulais, Lampeter, Adpar, Narberth and Llandysul. Reference is made to the evidence base in relation to housing distribution.

11.72 Whilst the majority of development will be directed to the top tiers of the settlement hierarchy, the diversity of the County is recognised and regard will be given to housing in rural areas, and the value such areas play within the County. Within rural villages (Tier 4) and non-defined settlements, new housing development will be limited to small scale opportunities. Reference is made to Policy HOM3 and HOM4 of this Plan.

11.73 Whilst the above refers specifically to residential growth, the settlement framework will, in conjunction with specific policies, also guide the consideration of appropriate sustainable locations - with access to services and facilities - and scale of other developments (including employment).

11.74 The following sets out an indicative outline on the nature of development likely by tier including their scale and type.

Principal Centres

Strategic Sites

Large and small scale Employment Areas

Housing Allocations

Small housing sites (under 5 homes);

Affordable Housing Provision on sites of 5 or more units

Windfall housing opportunities

Service Centres:

Small Scale Employment Areas

Housing Allocations

Affordable Housing Provision on sites of 5 or more units

Small housing sites (under 5 homes);

Windfall housing opportunities

Sustainable Villages:

Housing Allocations

Affordable housing on sites of 5 or more units

Small housing sites (under 5 homes);

Windfall housing opportunities

Small Scale Rural Exceptions Schemes for Affordable Housing adjoining settlement boundaries

Rural Villages (No Development Limits):

Small sites – housing through infill or logical extensions/rounding off.

Small Scale Rural Exceptions Schemes for Affordable Housing

Non Defined Rural Settlements:

Local Needs Affordable Housing and Small-Scale Rural Exceptions Schemes for Affordable Housing.

SD1: Development Limits

Development Limits are defined for those settlements identified as Principal Centres, Service Centres and Sustainable Villages within Strategic Policy SP3.

Proposals within defined Development Limits will be permitted, subject to policies and proposals of this Plan, national policies, and other material planning considerations.

11.75 In preparing this Plan, development limits have been defined across all settlements within Tiers 1, 2, and 3, in order to:

  • Prevent inappropriate development in the countryside and provide certainty and clarity as to where exceptions proposals (adjacent to limits) may be considered appropriate;
  • Prevent coalescence of settlements (or separate parts of the same settlement), unacceptable ribbon development or a fragmented development.
  • Identify those areas within which development proposals would be permitted (see above); and,
  • Promote effective and appropriate use of land concentrating growth within defined settlements.

11.76 Not all land on a Proposals Map and Inset Maps is identified for a particular development, or the subject of a specific policy. Significant areas of land can appear as un-annotated land in the Plan. Proposals for development will be considered on their individual merits against the provisions of this LDP, and other material considerations.

Strategic Policy – SP4: A Sustainable Approach to Providing New Homes

In order to ensure the overall housing requirement of 8,822 homes for the plan period is met, provision is made for 9,704 new homes in accordance with the settlement framework in order to promote the creation and enhancement of sustainable communities.

The sustainable approach to the provision of new homes reflects the following principles:

  1. Creating places through the identified settlement framework reflecting the character and context of that cluster or settlement;
  2. Allocating sites for new homes in established settlements;
  3. Supporting windfall residential development on appropriate sites within settlements, with a focus on the re-use of previously developed land;
  4. Provision of appropriate affordable housing opportunities to meet identified local need.

Proposals within the defined development limits will be permitted subject to the policies and proposals of this Plan. There will be a presumption against inappropriate housing development outside of the defined limits except where they are subject to other policies of this Plan.

11.77 It is an aim of the Plan to facilitate the delivery of the required number and choice of new homes. These will meet the identified housing needs and promote cohesive communities that are attractive, accessible, safe, well connected, and provide accessibility to cultural and leisure facilities, community services and employment opportunities.

11.78 The Plan's Strategy and its sustainable approach to the provision of new homes has been formulated on the basis of sustainable development principles. This accords with the goals and aspirations of the Well-Being and Future Generations Act and national planning policy[50]. It is focussed on meeting housing needs across the County's diverse communities in a way which is sustainable, respects the environmental qualities of the County, and its cultural and Welsh language characteristics.

11.79 This Plan factors in a number of housing supply components to meet this housing need, together with flexibility (uplift) to ensure that the overall aim of the strategic policy to provide new homes is met. The housing supply is made up of the following components:

  •  Housing Allocations (5+ homes)
    • Land bank Commitments
    • Completed Dwellings
  •  Windfall Allowance
    • Small Site Component (less than 5 homes)
    • Windfall Component (5+ Homes)
  • Flexibility (+10%)

Housing Allocations

11.80 The largest component of housing supply is sites allocated for residential development. Housing allocations will be identified within the specific housing policies or included as part of mixed-use allocations.

11.81 The specific policies will consider the developments which have been commenced or committed since the base date of the revised LDP, and they will be continually monitored through the Housing Trajectory (Appendix 7).

Windfall

11.82 The windfall allowance is made up of the following factors:

  1. Potential contributions of sites of less than five dwellings (small sites)
  2. Windfall allowance through sites of five or more dwellings which have traditionally made an important contribution to housing delivery within Carmarthenshire.

11.83 Windfall developments will be considered on their individual merits and against the policies and proposals of this Plan. It is recognised that it is not always practicable or appropriate to allocate every site for development. There will often be sites suitable for development which are not identified as allocations with their contribution to housing land supply identified through the windfall allowance.

HOM1: Housing Allocations

Land is allocated for residential development on the following sites (* denotes 100% affordable sites)

Site Ref

Site Name

Total units in Plan Period

Total Affordable Units in Plan period

Delivery Timescale
Year 1-5
Year 6-10
Year 11-15

Units beyond the Plan Period

Cluster 1

Carmarthen

PrC1/h2

Springfield Road

29

8.7

Year 6 - 10

PrC1/h3

*113 Priory Street

37

37

Year 1 - 5

PrC1/h4

Land off Parc y Delyn

17

1.7

Year 11 15

PrC1/h5

East of Devereaux Drive

10

5

Year 6 - 10

PrC1/h7

Penybont Farm, Llysonnen Road

9

0

Year 1 - 5

PrC1/h8

*Llansteffan Road

50

50

Year 6 - 10

PrC1/h9

Mounthill

5

0

Year 1 - 5

PrC1/h10

Brynhyfryd

20

2.4

Year 6 - 10

PrC1/h11

Rhiw Babell extension

12

0

Year 1 - 5

PrC1/h12

Castell Pigyn Road, Abergwili

35

4.2

Year 6 - 10
Year 11 - 15

PrC1/h14

Bronwydd Road (south)

44

2

Year 1 - 5
Year 6 - 10

PrC1/h15

Adj Tyle Teg, Llysonnen Road

7

2

Year 1 - 5
Year 6 - 10

PrC1/h16

Rhiw Babell

9

1.5

Year 6 - 10

PrC1/h17

4-5 Quay Street

5

0

Year 6 - 10

PrC1/h18

Castell Howell

7

2.1

Year 6 - 10

PrC1/h19

Land adjacent Ty Gwynfa

10

10

Year 1 - 5

PrC1/h20

5-8 Spilman Street

12

12

Year 6 - 10

PrC1/h21

Clos Tawelan

18

18

Year 1-5

PrC1/MU1

West Carmarthen

700

84

Year 1 - 5
Year 6 – 10
Year 11-15

291

PrC1/MU2

Pibwrlwyd

247

61.75

Year 11 - 15

Pontyates / Meinciau / Ponthenri

SeC1/h1

Lime Grove

19

3.8

Year 6 - 10

SeC1/h3

Land adjoining Tabernacle Chapel

11

1

Year 1 - 5
Year 6 - 10

SeC1/h4

Cae Canfas, Heol Llanelli

8

Commuted Sum Contribution

Year 6 - 10

SeC1/h5

Land at 8 Heol Llanelli

6

Commuted Sum Contribution

Year 6 - 10

SeC1/h6

Land off Heol Llanelli

10

2

Year 6 - 10
Year 11 - 15

SeC1/h7

Land off Heol Glyndwr

9

2

Year 6 - 10

Ferryside

Sec2/h1

Caradog Court

12

Commuted Sum Contribution

Year 1 - 5
Year 6 - 10

Sec2/h2

Land to the rear of Parc y Ffynnon

12

1.2

Year 6 - 10
Year 11 - 15

Cynwyl Elfed

SuV1/h1

Adjacent Fron Heulog

8

Commuted Sum Contribution

Year 1 - 5
Year 6 - 10
Year 11 - 15

SuV1/h2

Land adj. Lleine

13

1.3

Year 6 - 10
Year 11 - 15

Llansteffan

SuV3/h1

Land to the rear of Maesgriffith

16

5

Year 6 - 10

Bronwydd

SuV4/h1

Land at Troed Rhiw Farm

6

Commuted Sum Contribution

Year 6 - 10

Cwmffrwd

SuV5/h1

Land at Maesglasnant

20

4

Year 1 - 5
Year 6 - 10

Llangain

SuV8/h1

South of Dol y Dderwen

36

10.8

Year 6 - 10

Peniel

SuV10/h1

South of Pentre

9

1

Year 1 - 5
Year 6 - 10

SuV10/h2

Aberdeuddwr / Pantyfedwen

38

4.56

Year 6 - 10
Year 11 - 15

Alltwalis

SuV11/h1

*Land at Alltwalis School

12

12

Year 6 - 10

Llanpumsaint

SuV12/h1

Adj. Gwyn Villa

20

2.4

Year 6 - 10
Year 11 - 15

SuV12/h2

Llandre

8

Commuted Sum Contribution

Year 1 - 5
Year 6 - 10
Year 11 - 15

Rhydargaeau

SuV14/h1

Cefn Farm

36

3.7

Year 1 - 5
Year 6 - 10
Year 11 - 15

Llanarthne

SuV15/h1

Llanarthne School

8

Commuted Sum Contribution

Year 1 - 5

Capel Dewi

SuV16/h1

Llwynddewi Road

8

Commuted Sum Contributions

Year 1 - 5
Year 6 - 10

Nantgaredig

SuV17/h1

Rear of former joinery, Station Road

35

4.2

Year 6 - 10
Year 11 - 15

Pontargothi

SuV18/h1

Land off A40, Pontargothi

15

1

Year 6 - 10

Llanddarog

SuV19/h1

Land Opp. Village Hall

16

3.2

Year 6 - 10

SuV19/h2

Land adj. and the r/o Haulfan

10

1

Year 6 - 10
Year 11 - 15

Porthyrhyd

SuV20/h1

Land adjacent to Llwynhenry Farm

6

Commuted Sum Contribution

Year 6 – 10
Year 11 - 15

Cluster 1 Total

1690

Cluster 2

Llanelli

PrC2/h1

Beech Grove, Pwll

10

1

Year 6 - 10

PrC2/h2

Former Laboratory Pen y Fai Lane

13

2

Year 1 - 5
Year 6 - 10

PrC2/h3

Parc y Strade

94

0

Year 1 - 5

PrC2/h4

North Dock

210

42

Year 6 - 10
Year 11 - 15

PrC2/h6

107 Station Road

7

0

Year 1 - 5

PrC2/h7

13-15 Station Road

9

0

Year 1 - 5

PrC2/h9

*3-5 Goring Road

8

8

Year 1 - 5

PrC2/h10

Land adjacent The Dell, Furnace

13

1.3

Year 6 - 10

PrC2/h12

*Llys yr Hen Felin, Town Centre

26

26

Year 1 - 5

PrC2/h13

*Land off Frondeg Terrace

29

29

Year 1 - 5

PrC2/h14

Rear of 22c,22d and 22e Llwynhendy Road

6

0

Year 1 - 5

PrC2/h15

Maesarddafen Road / Erw Las, Llwynhendy

94

18.8

Year 6 - 10

PrC2/h16

Ynys Las, Llwynhendy

33

6.6

Year 6 - 10
Year 11 - 15

PrC2/h18

*Dylan, Trallwm

32

32

Year 1 - 5

PrC2/h19

Genwen, Bryn

240

48

Year 1 - 5

PrC2/h20

*Harddfan

6

6

Year 6 - 10

PrC2/h21

*Maes Y Bryn, Bryn

34

34

Year 1 - 5

PrC2/h22

Cwm y Nant, Dafen

202

40.4

Year 6 - 10
Year 11 - 15

PrC2/h23

Dafen East Gateway

150

45

Year 6 - 10

PrC2/h24

Clos Ffordd Fach

13

0

Year 1 - 5
Year 6 - 10

PrC2/h25

*Land off Clos-y-Berllan

20

20

Year 6 - 10

PrC2/h26

Adjacent to No 19 Llwynhendy Road

6

1

Year 6 - 10

PrC2/h27

42 Stepney Street

8

0

Year 1 - 5

PrC2/h28

Heol Y Graig, Llwynhendy

5

Commuted Sum Contributions

Year 1 - 5
Year 6 - 10

PrC2/MU3

Former YMCA Building, Stepney Street, Llanelli Town Centre

8

8

Year 1-5

PrC2/SS1

Pentre Awel

240

60

Year 6 - 10
Year 11 - 15

Kidwelly

SeC3/h2

Land off Priory Street

20

2.4

Year 11 - 15

SeC3/h3

Llys Felin

24

1.5 + Commuted Sum Contribution

Year 1 -5
Year 6 - 10

SeC3/h4

Land at Former Dinas Yard

71

5

Year 6 - 10

Burry Port

SeC4/h1

Gwdig Farm

105

21

Year 1 - 5

SeC4/h2

Burry Port Harbourside

364

72.8

Year 6 - 10
Year 11 - 15

SeC4/h3

*Glanmor Terrace

32

32

Year 1 - 5

Pembrey

SeC5/h1

*Garreglwyd

14

14

Year 1 - 5

SeC5/h2

Awel y Mynydd

100

20

Year 1 - 5
Year 6 - 10

Hendy / Fforest

SeC6/h1

Llwyngwern

20

5

Year 1 - 5

SeC6/h2

Land between Clayton Road and East of Bronallt Road

20

2.2

Year 1 - 5
Year 6 - 10

SeC6/h3

Coed y Bronallt

6

Commuted Sum Contribution

Year 1 - 5
Year 6 - 10

SeC6/h4

Adjacent to Clos Benallt Fawr, Fforest

35

4

Year 1 - 5

Llangennech

SeC7/h1

Box Farm

7

1.4

Year 6 - 10

SeC7/h3

Golwg Yr Afon

50

25

Year 6 - 10

SeC7/h4

Opposite Parc Morlais

32

3.84

Year 6 - 10

SeC7/h5

*Maesydderwen

5

5

Year 6 - 10

Trimsaran / Carway

SeC8/h1

Ffos Las

159

10

Year 1 - 5

SeC8/h2

Cae Linda

45

5.4

Year 1 - 5
Year 6 - 10
Year 11 - 15

SeC8/h3

Golwg Gwendraeth

141

14

Year 6 - 10

Mynyddygarreg

SuV22/h1

Gwenllian Gardens

25

5

Year 1 - 5
Year 6 - 10

SuV22/h2

Land adjacent to Ty Newydd, Meinciau Road

8

Commuted Sum Contribution

Year 6 - 10
Year 11 - 15

Five Roads / Horeb

SuV23/h1

Clos y Parc

16

Commuted Sum Contribution

Year 1 - 5

SuV23/h2

Adjacent Little Croft

25

3

year 11 - 15

Cluster 2 Total

2840

Cluster 3

Ammanford (inc Betws and Penybanc)

PrC3/h1

Land at r/o No 16-20 & 24-30 Betws Road

9

Commuted Sum Contribution

Year 11 - 15

PrC3/h2

Former Petrol Station, Wind Street

6

6

Year 1 - 5

PrC3/h3

*Land at Gwynfryn Fawr

28

28

Year 1 - 5

PrC3/h4

Tirychen Farm

150

37.5

Year 6 - 10
Year 11 - 15

PrC3/h5

Yr Hen Felin, Pontamman Road

6

Commuted Sum Contribution

Year 1 - 5

PrC3/h6

Land Adjoining Maes Ifan, Maesquarre Road

18

1.8

Year 6 - 10
Year 11 - 15

PrC3/h33

Llys Dolgader

9

0

Year 1 - 5

PrC3/h36

Betws Colliery

66

0

Year 11 - 15

Castell y Rhingyll

PrC3/h34

Clos y Gât

5

0

Year 1 - 5

Cefneithin

PrC3/h8

Land off Heol y Parc

18

1.8

Year 6 - 10
Year 11 - 15

Cross Hands

PrC3/h9

Land adjacent to Maesyrhaf

5

Commuted Sum Contribution

Year 6 - 10

PrC3/h11

*Ffordd y Neuadd and Clos yr Eithin

60

60

Year 1 - 5

PrC3/h12

Land adjoining A48 and Heol y Parc

9

0

Year 6 - 10

PrC3/h13

Land at Heol Cae Pownd

135

4

Year 1 - 5
Year 6 - 10

Drefach (Tumble)

PrC3/h14

*Nantydderwen

33

33

Year 6 - 10
Year 11 - 15

PrC3/h15

Land off Heol Caegwyn

7

Commuted Sum Contribution

Year 1 - 5
Year 6 - 10

PrC3/h16

Uwch Gwendraeth

6

1

Year 1 - 5

Gorslas

PrC3/h18

Land adjoining Brynlluan

29

3.48

Year 11 - 15

Llandybie

PrC3/h19

Land off Llys y Nant

9

Commuted Sum Contribution

Year 1 - 5

PrC3/h20

Land north of Maespiode

45

5.4

Year 6 - 10

PrC3/h21

*Maespiode

8

8

Year 1 - 5

PrC3/h37

*Clos Felingoed

24

24

Year 6 - 10

Penygroes

PrC3/h22

Adj to Pany y Blodau

79

8

Year 6 - 10
Year 11 - 15

PrC3/h23

Land at Waterloo Road

13

0

Year 1 - 5
Year 6 - 10

PrC3/h24

Land between 123 and 137 Waterloo Road

7

0

Year 1 - 5

PrC3/h25

*Land off Gate Road

8

8

Year 1 - 5

PrC3/h35

Clos Penpont

9

0

Year 1 - 5
Year 6 - 10

PrC3/MU1

Emlyn Brickworks

177

44.25

Year 11 - 15

Saron

PrC3/h26

Land off Parc-y-Mynydd

15

1.5

Year 6 - 10
Year 11 - 15

PrC3/h27

Land off Nant-y-Ci Road

18

1.8

Year 11 - 15

Tumble

PrC3/h28

Land at Factory site between No. 22 & 28 Bethesda Road

30

3.6

Year 6 - 10

PrC3/h29

Central Garage

24

5

Year 1 - 5

Tycroes

PrC3/h31

Land at Fforestfach

17

1

Year 1 - 5

PrC3/h32

*Land south of Tycroes Road

37

37

Year 1 - 5

Brynamman

SeC9/h2

Heol Gelynen

8

8

Year 11 - 15

Glanamman / Garnant

SeC10/h1

Garnant CP School, New School Road

12

Commuted Sum Contribution

Year 1 - 5

SeC10/h2

Land adj. No 13 Bishop Road

8

Commuted Sum Contribution

Year 1 - 5
Year 6 - 10

Pontyberem / Bancffosfelen

SeC11/h1

Land off Heol Llannon

15

1.5

Year 11- 15

SeC11/h2

Land at Ffynnon Fach

19

2

Year 1 - 5

Llannon

SuV25/h1

Land north of Clos Rebecca

47

3

Year 1 - 5
Year 6 - 10

Llanedi

SuV26/h1

Rear of 16 Y Garreg Llwyd

11

1.1

Year 6 - 10

Carmel

SuV27/h1

Land adjacent to Tŷ Newydd

5

Commuted Sum Contribution

Year 6 - 10

Cwmgwili

SuV28/h1

Adjacent to Coed y Cadno

18

2

Year 1 - 5

Ystradowen

SuV30/h1

Land off Pant y Brwyn

5

5

Year 6 - 10

Cluster 3 Total

1267

Cluster 4

Newcastle Emlyn

SeC12/h1

Trem y Ddol

17

1.7

Year 6 - 10
Year 11 - 15

SeC12/h2

Heol Dewi

14

0

Year 1 - 5

SeC12/h3

Land to r/o Dolcoed

20

3.4

Year 6 - 10
Year 11 - 15

Llanybydder

SeC13/h1

Adj. Y Neuadd

10

1

Year 6 - 10
Year 11 - 15

SeC13/h4

Bro Einon

9

2

Year 6 - 10

Pencader

SeC14/h1

Blossom Garage

20

3.4

Year 6 - 10

SeC14/h2

Land adj Maescader

24

2.88

Year 6 - 10
Year 11 - 15

Waungilwen

SuV32/h1

Opposite Springfield

6

Commuted Sum Contribution

Year 1 - 5
Year 6 - 10

Llangeler

SuV33/h1

Land opp Brogeler

5

Commuted Sum Contribution

Year 6 - 10
Year 11 - 15

Saron/Rhos

SuV35/h1

Land adj. Arwynfa

6

Commuted Sum Contribution

Year 6 - 10

Llanllwni

SuV36/h1

Cae Pensarn Helen

6

Commuted Sum Contribution

Year 6 - 10
Year 11 - 15

SuV36/h2

*Land at Bryndulais

16

16

Year 6 - 10

Cwmann

SuV37/h2

Land south of Cae Coedmor

20

2.4

Year 6 - 10
Year 11 - 15

SuV37/h3

Land adjacent to Lleinau

10

1

Year 6 - 10

Capel Iwan

SuV38/h1

Maes y Bryn

6

Commuted Sum Contribution

Year 6 - 10

Llanfihangel ar arth

SuV39/h1

Adj Yr Hendre

7

Commuted Sum Contribution

Year 6 - 10
Year 11 - 15

Pontyweli

SuV41/h2

Cilgwyn Bach

14

2

Year 1 - 5
Year 6 - 10

New Inn

SuV43/h1

Blossom Inn

8

Commuted Sum Contribution

Year 1 - 5
Year 6 - 10

Cluster 4 Total

218

Cluster 5

Llandovery

SeC15/h1

Land to north of Dan y Crug

61

12

Year 6 - 10
Year 11 - 15

SeC15/h2

Land adjacent to Bryndeilog, Tywi Avenue

8

Commuted Sum Contribution

Year 11 - 15

Llandeilo

SeC16/h1

Llandeilo Northern Quarter

27

3.24

Year 6 - 10
Year 11 - 15

Llangadog

SeC17/h1

Land opp. Llangadog C.P School

16

1.6

Year 6 - 10
Year 11 - 15

SeC17/h2

Land off Heol Pendref

8

Commuted Sum Contribution

Year 6 - 10
Year 11 - 15

SeC17/h3

*Ger yr Ysgol

21

21

Year 1 - 5

Llanfynydd

SuV49/h1

Awel y Mynydd

13

2

Year 1 - 5
Year 6 - 10

Cwmifor

SuV51/h1

Opp. Village Hall

8

Commuted Sum Contribution

Year 11 - 15

Cluster 5 Total

162

Cluster 6

St Clears / Pwll Trap

SeC18/h1

Adjacent to Brittania Terrace

60

12

Year 11- 15

SeC18/h2

*Former Butter Factory

45

45

Year 1 - 5
Year 6 - 10

SeC18/h3

Land adjacent to Cefn Maes

100

20

Year 6 - 10
Year 11 - 15

SeC18/h4

Land at Heol Llaindelyn

6

Commuted Sum Contribution

Year 6 - 10
Year 11 - 15

SeC18/h5

Land adjacent to Gwynfa, Station Road

8

Commuted Sum Contribution

Year 6 - 10
Year 11 - 15

SeC18/h6

Land to the rear of Station Road

25

3

Year 11- 15

SeC18/h7

Land adjacent to Gardde Fields

8

Commuted Sum Contribution

Year 6 - 10
Year 11 - 15

SeC18/h8

Land at Cae Glas

5

Commuted Sum Contribution

Year 11- 15

SeC18/h9

Land to the west of High Street

64

5

Year 6 - 10

Whitland

SeC19/h1

Land at Park View, Trevaughan

8

Commuted Sum Contribution

Year 6 - 10
Year 11 - 15

SeC19/h2

Land at Whitland Creamery

48

5.76

Year 6 - 10
Year 11 - 15

SeC19/h3

Gerddi Lingfield

57

Commuted Sum Contribution

Year 1 - 5
Year 6 - 10

SeC19/h4

*Parc y Dressig

15

15

Year 1 - 5

Laugharne

SeC20/h1

Pludds Meadow

24

2

Year 1 - 5

SeC20/h2

Adj. Laugharne School

42

12.6

Year 11- 15

SeC20/h3

Land off Clifton Street

6

Commuted Sum Contribution

Year 11- 15

Glandy Cross

SuV55/h1

Land to the r/o Maesglas

9

Commuted Sum Contribution

Year 6 - 10

SuV55/h2

Land to the north of Cross Inn P.H

6

Commuted Sum Contribution

Year 6 - 10
Year 11 - 15

Efailwen

SuV56/h1

Land to the r/o Talar Wen

6

Commuted Sum Contribution

Year 6 - 10
Year 11 - 15

Meidrim

SuV58/h1

*Land adj. to Lon Dewi

10

10

Year 6 - 10

SuV58/h2

Land off Drefach Road

15

1.5

Year 6 - 10
Year 11 - 15

Bancyfelin

SuV59/h1

Maes y Llewod

17

4

Year 1 - 5

SuV59/h2

North of Maes y Llewod

19

1.9

Year 6 - 10

Llangynog

SuV60/h1

Land at College Bach

6

Commuted Sum Contribution

Year 6 - 10
Year 11 - 15

Pendine

SuV61/h1

Land at Nieuport Farm

10

1

Year 6 - 10

Llanmiloe

SuV63/h1

Land at Woodend

28

4

Year 1 - 5
Year 6 - 10

Cluster 6 Total

647

Table 5: Housing Allocation Table

11.84 The housing land allocations identified through this policy and other provisions of this Plan seek to satisfy the housing land requirements for the County, with their distribution directing them to those settlements in a manner consistent with the overall strategy of the Plan. The Plan however seeks to achieve this through a structured hierarchy and distribution of growth, in a manner which sees the majority of the housing land requirement focused on the sustainable centres of Carmarthen, Llanelli and Ammanford/Cross Hands. Further allocations are distributed across the remainder of the hierarchy.

11.85 Site numbers highlighted within the Policy HOM1 are intended to be indicative and been considered on a site by site basis. They will be subject to further consideration at application stage. Regard will also be had to the policies and provisions of this plan and other relevant design principles.

11.86 Proposals for the development of allocated housing sites submitted in applications for Full Planning or Reserved Matters permissions should be accompanied by a layout of the allocated site in its entirety to ensure the site is developed to its full potential, provides a mix of housing types, sizes and tenure, and meets the needs of the local population. Reference should also be made to policy PSD2 in relation to masterplanning requirements.

11.87 The Plan will be supported by an Infrastructure Delivery Plan which provides further detail of the phasing, funding and delivery of infrastructure required for each key site. In this respect, proposals will also be required to mitigate against any potential policy impacts associated with its development.

HOM2: Housing within Development Limits

Proposals for housing developments on unallocated sites within the development limits of a defined settlement in Tiers 1, 2 and 3 will be permitted, provided they are in accordance with the principles of the Plan's strategy, policies and proposals.

11.88 Sites capable of accommodating five or more dwellings feature as allocated housing sites in the Plan (refer to Policy HOM1). However, within the development limits of defined settlements there may be opportunities for development on unallocated sites. Within the settlement hierarchy, land that has not been allocated is referred to as a windfall site in relation to housing development. Proposals should reflect the character of the area and be compatible with the provisions of the Plan.

HOM3: Homes in Rural Villages

In those settlements identified as rural villages under Policy SP3, proposals for 1 to 4 dwellings will be permitted for the following:

  • minor infill of a small gap between the existing built form; or,
  • logical extensions and/or rounding off of the development pattern that fits in with the character of the village form and landscape; or
  • conversion or the sub-division of large dwellings.

Such proposals will be subject to other detailed planning considerations set out within LDP policies.

Reference made to the guidance on acceptable plots in the County's rural villages (see below).

Proposals which exceed the 10% cap above the number of existing homes in the settlement, as at the LDP base date, will not be permitted except where they conform to Policy AHOM1 in relation to the provision of affordable homes.

11.89 The settlement framework for the Plan area identified in Strategic Policy SP3 recognises and reflects the area's diversity and that of its communities. In identifying the Rural Villages, the Plan seeks to make provision for those settlements which make an important contribution within their community and offer opportunities for small scale and appropriate new homes within rural settings.

11.90 This part of the Plan's rural policy framework seeks to establish a flexible but controlled approach to the delivery of new homes within those settlements. The Plan utilises a criteria-based assessment to define small scale housing opportunities in rural villages and to meet the need for new homes in rural parts of Carmarthenshire at a scale and at locations which maintain the essential character of the countryside.

11.91 In order to reflect the rural character and to prevent unacceptable and potentially detrimental levels of growth, a cap of 10% over and above the number of existing homes, as of the base date of the Plan in the settlement will be allowed.

11.92 Further guidance in the form of SPG will be published to support the interpretation and application of the above and the policy. The guidance will form part of a suite of SPG to support with the design and siting considerations in general and will enable proposals to effectively integrate with and contribute to the development of cohesive and sustainable communities.

Guidance on Acceptable Plots

  1. Infill sites within these rural villages will take priority over other locations;
  2. Where appropriate, sites adjoining a rural village are also acceptable. Such sites will be required to adjoin the boundary of one property which forms part of the rural village group. All proposals which adjoin a group (as opposed to infill sites) will be required to demonstrate the following:
    • there is an existing physical or visual feature which provides a boundary for the group - reducing pressure for unacceptable ribbon development or rural sprawl;
    • where such a feature does not exist, there should be potential for such a feature to be provided so long as it is in character with the scale and appearance of the group;
  3. Proposals located in open fields adjoining a group, which have no physical features to provide containment will not be considered acceptable;
  4. Proposals which are located beyond clear physical features which form strong boundaries for a group (e.g. main roads, substantial tree belts, rivers etc.) will not be considered acceptable.

HOM4 - Homes in Non-Defined Rural Settlements

Proposals for new single homes in settlements, hamlets and groups of dwellings (as defined within the glossary) which are not identified under Strategic Policy SP3 will be permitted where they meet a local need for affordable housing and conform to the following:

  1. It represents sensitive infill development of a small gap within an otherwise continuous built-up frontage; or, is an appropriate rounding off of the development pattern;
  2. The development is of a scale that is consistent with the character of the area ;
  3. The proposal will not result in an intrusive development in the landscape, and will not introduce a fragmented development pattern,
  4. The size of the property reflects the specific need for an affordable dwelling in terms of the size of the house and the number of bedrooms;
  5. That the occupancy of the dwelling is restricted both on first occupation and in perpetuity to those who have a need for an affordable dwelling.

11.93 There are a notable number of small settlements or groups of dwellings throughout the County which have not been defined within the settlement framework, and as such do not have development limits.

11.94 It is also noted that such provision needs to be delivered within the backdrop of a national agenda centred on sustainability with placemaking at its heart. In this respect reference is made to the provisions of PPW Ed.11 which requires that all residential development away from existing settlements or centres be strictly controlled. The policy therefore in reflecting the provisions of national policy restricts local affordable need dwellings in rural areas to established groups of dwellings.

11.95 Whilst the Revised LDP is supported by a robust evidence base it is acknowledged that details of housing need changes over time. Affordable housing proposals will be required to submit evidence demonstrating the specific local need and ensure that the proposal provides for the size, type and tenure of houses required. Proposals to meet speculative local need application will not be considered, rather they should relate to an identified need from individuals/families within the specific area.

11.96 Where available, local housing needs surveys should be utilised in providing this evidence. Alternatively, other forms of evidence may be considered appropriate including Strategic Housing Market Area Assessments and local needs/Lettings registers.

11.97 Occupancy controls will be imposed to ensure that the benefits of affordability are preserved in perpetuity for subsequent occupiers. The definition for non-defined rural settlements and Local Needs Housing is set out in the Glossary of Terms.

HOM5: Conversion or Subdivision of Existing Dwellings

Proposals for the conversion or sub-division of appropriate dwellings into flats or dwellings of multiple occupation, will be permitted where:

  1. It would not result in an over-intensification of use;
  2. Suitable parking provision is available, or made available;
  3. The architectural quality, character and appearance of the building is, where applicable, safeguarded and its setting not unacceptably harmed.

11.98 This policy seeks to reflect the potential of conversion opportunities in appropriate existing dwellings as alternatives to new build. Such opportunities can often provide additional range and choice to the housing stock and offer alternatives for property owners, where single occupancy of larger dwellings is no longer appropriate.

11.99 Extensions should be subordinate to, and compatible with the size, type and character of the existing dwelling and not result in over development (reference should be made to policy PSD10: Extensions). Proposals will where appropriate be encouraged to incorporate the re-use of materials as part of any development.

11.100 As part of any development proposal, reference should be drawn to Policy PSD1 of this Plan relating to Effective Design Solutions: Sustainability and Placemaking.

HOM6: Specialist Housing

Proposals for new care home developments and extensions to established specialist housing facilities will be permitted within or adjoining the development limits of defined existing settlements (Policy SP3) where:

  1. It reflects the needs of the proposed occupants in respect of their safe and convenient access to shops, services, community facilities and public transport or active travel routes; and,
  2. It provides a suitable and appropriate quality, design, and type of accommodation as well as the level of support and care for the intended occupiers

Proposals for specialist housing outside and not adjoining the defined development limits will only be permitted if it can be demonstrated that they are viable and sustainable and where:

  1. It is ancillary to an existing care home and not disproportionate to it in scale; or,
  2. It represents the appropriate conversion of an existing property, which is suitable to the needs of the proposed occupants and accords with both criterion a) and b) above.

11.101 The changing age profile of the county with its continued projected move towards an ageing population over the plan period has the potential to result in an increased requirement in respect of Specialist Housing. Whilst certain requirements for assisted living or support needs will be addressed through adaptation of existing homes or through existing facilities, the need for the Plan to provide for the consideration for new care homes is recognised. Consequently, this policy seeks to provide a framework for considering proposals to make appropriate allowances for the needs of those requiring care.

11.102 For the purposes of this policy, the definition of Specialist Housing relates to nursing homes, sheltered housing, extra or close care housing (wardened), retirement facilities reflecting continuing care needs, and other facilities where care is provided. Where a care home is proposed on a site allocated for residential use in the Plan, consideration will be given to the nature of the proposal and its suitability for the proposed location. The level of independence of residents will be an important consideration with 'closed door' homes not generally being considered appropriate.

11.103 The inclusion of care homes within or adjoining the development limits ensures that residents have opportunities to integrate into the community with the developments forming part of the urban or built form. The accessibility of such infrastructure and facilities represents an important element of residents' needs.

HOM7: Renovation of Derelict or Abandoned Dwellings

Proposals for the renovation of derelict or abandoned dwellings outside the Development Limits of a defined settlement (Policy SP3) will be permitted where:

  1. It can be demonstrated that a significant part of the original structure is physically sound and substantially intact requiring only a limited amount of structural remedial works;
  2. The building demonstrates and retains sufficient quality of architectural features and traditional materials with no significant loss of the character and integrity of the original structure;
  3. There are no adverse effects on the setting or integrity of the historic environment.

In exceptional instances where it can be demonstrated that the original dwelling played a recognised and significant role in the history, culture, and development of Carmarthenshire, the use of photographic or documentary evidence may be accepted as a means to illustrate the original details of the dwelling.

11.104 The renovation of abandoned dwellings can make a small but important contribution to the needs of an area. The architectural value of a number of derelict or abandoned dwellings often reflects the traditional vernacular and should be recognised in the submission of such proposals. Extensions, access requirements or other aspects associated with the proposal should be sympathetic to the character of the original building and the landscape. Proposals which seek to make a positive contribution to the landscape qualities of the area will be encouraged.

11.105 Proposals which fail to satisfy the above (including re-build) will be considered as development in the open countryside and determined accordingly.

HOM8: Residential Caravans

Proposals for temporary residential caravans will be permitted where:

  1. The caravan is required to house an essential worker, in agriculture, forestry or other appropriate employment undertaking who must live on site rather than in a nearby settlement; or,
  2. The caravan is required in conjunction with the construction of a single dwelling on a self-build plot, or during the construction of a replacement dwelling; and,
  3. The caravan or mobile home will be located close to other buildings where possible and will not cause significant access, parking, infrastructural or amenity problems; and,
  4. They will not have an unacceptable adverse impact on wider landscape or nature conservation objectives.

11.106 The siting of a caravan/mobile home required in conjunction with the above will be conditioned to ensure its removal once its operational requirements have ceased. The period of any temporary consent will be assessed against the particulars of each application. In the case of deciding the timescale required for the siting of caravans/mobile homes in connection with the construction of a self-build dwelling, the duration of expected construction work will be the determining factor.

HOM9: Ancillary Residential Development

Proposals for ancillary residential accommodation in the form of an annexe will be supported where:

  1. It is to be used solely either by an independent relative or an individual with a reliance on the household, where an element of independence is to be provided; reliant in part on the main dwelling for facilities;
  2. Complementary to the main dwelling and strictly limited in terms of size, scale and floor area to reflect the needs of the user;
  3. Located within the existing curtilage of the main dwelling with no separate garden area, vehicle access, or segregated car parking;
  4. Designed to be subordinate to, and respects and enhances the character of the main dwelling and would not represent an overdevelopment of the garden and/or curtilage.

The accommodation will only be permitted where it is in the same ownership as the main dwelling. Future occupancy will be tied to the beneficial ownership of the main dwelling by means of a Section 106 agreement.

11.107 Ancillary residential accommodation can provide a valuable function enabling a relative to live with their family whilst maintaining a degree of independence. Such accommodation however requires a level of control to ensure that it serves an ancillary function and does not result in the creation if a separate self-contained dwelling.

11.108 Any proposal should reflect its ancillary function and not include the full range of facilities associated with an independent dwelling nor should it be designed in a way that would make it capable of being converted or occupied as an independent dwelling. Proposals should be designed to reflect the occupant's identified essential needs, with basic provisions reflective of its ancillary purpose. In respect of a single occupant this would normally consist of one en-suite bedroom and a living area with small kitchenette.

11.109 The annexe will be required to be in the same ownership as the main dwelling with any application accompanied by details of its occupants, including their relationship and/or dependency with the main dwelling occupants, and ownership details of the annexe.

11.110 Regard will be had to the need of the occupant in respect of the size of any outbuilding proposed for conversion. In this regard it may only be acceptable to convert part of the building to ensure the conversion provides only limited facilities commensurate with its ancillary purpose.

11.111 The annexe should not displace an existing use which would require the construction of a further alternative building to enable that use to continue. New build detached annexes will only be considered where it is satisfactorily demonstrated that an extension or conversion is not appropriate or possible and will not be permitted at locations outside of the defined settlement limits.

Strategic Policy – SP 5: Affordable Homes Strategy

The Plan will maximise the delivery of affordable homes up to 2033 through the provision of a minimum of 1,900 affordable homes. This will support the development and enhancement of sustainable, balanced communities.

11.112 Affordable housing represents a key issue to be considered in the preparation of the Revised LDP particularly in contributing to the development of sustainable, balanced and cohesive communities.

11.113 This policy seeks to reflect the requirements set out in TAN 2 – Planning and Affordable Housing (2006) which seeks to put 'secure mechanisms in place to ensure that affordable housing is accessible to those who cannot afford market housing, both on first occupation and for subsequent occupants.'             

11.114 There are two main types of affordable housing as defined in TAN2:

  • Social Rented Housing: provided by local authorities and registered social landlords; and
  • Intermediate Housing: where prices or rents are above those of social rented housing but below market housing prices or rents[51].

11.115 In assessing the need for affordable dwellings, regard is given to the most up to date Carmarthenshire Local Housing Market Assessment (LHMA) The 2019 LHMA identifies a 76% / 24% split in the requirement of households requiring market housing and those households requiring affordable housing. For the benefit of the LHMA, the County has been split into 4 Affordable Housing Action Areas, and a significant proportion of the number of the households requiring affordable housing fall within the Llanelli Action Area (47%). The LHMA also identifies the type and size of the housing required throughout the County, with Llanelli having a consistent spread of need across 1,2 and 3 bedroom homes. In general across the other Action Areas, the county requires the development of 2-bed and 3-bed housing to meet the affordable need. In analysing this data, there is a strong correlation between the location of affordable housing need and the distribution of proposed housing growth set out within the LDP strategy and settlement framework (see policy SP16).

11.116 Whilst the LDP and planning system seeks to support the delivery of affordable homes, it is only one of few mechanisms used to meet this need. This is reflected in the Council's Affordable Housing Delivery Plan which sets out a five-year vision for delivering affordable housing. The LDP's contribution to the target is set out in SP5 through:

  • On-site provision of affordable housing as a percentage of the overall development, or on sites acquired by social housing providers;
  • Off-site affordable housing in lieu of on-site provision;
  • Provision from large windfall sites
  • Commuted sum contributions to support the delivery of affordable housing; and
  • Local Need housing.

11.117 Reference is also made to the Carmarthenshire Rural Needs Study 2019 which identifies a higher proportion of larger dwellings within the rural areas that contribute to higher house prices.[52] The LDP looks to support the growth of more affordable units within the rural communities to promote development for first time buyers or those in low-income households.

AHOM1: Provision of Affordable Homes

On-site Contributions

An on-site contribution towards affordable housing will be required on all market housing allocations and windfall sites of 10 or more homes to meet the affordable housing target set out in Policy SP5. The percentage target level for affordable housing is based on the scale of development:

  • sites comprising 10 – 19 homes will be required to provide an affordable housing contribution of 10%;
  • sites comprising 20 - 50 homes will be required to provide an affordable housing contribution of 12%;
  • sites comprising 51 – 100 homes will be required to provide an affordable housing contribution of 20%;
  • sites of 101 homes or more will be required to provide an affordable housing contribution of 25%.

The affordable housing target percentage noted is a target to be used as a starting point for affordable housing negotiations.

Where adjacent and related residential proposals result in combined numbers meeting or exceeding the above thresholds, the Council will seek an element of affordable housing based on applying the above target percentages to the aggregate number of dwellings.

Proposals will be required to ensure that the dwelling remains affordable for all subsequent occupants in perpetuity.

Commuted Sums

A commuted sum towards affordable housing will be required from proposals comprising 1 – 9 dwellings. Commuted sum charges will be based on floor space (cost per sq.m).

Proposals for single dwellings categorised as 3-bed, 4-person dwellings or smaller, and less than 88 square metres will be exempt.

Where the above requirements cannot be achieved due to their impacts upon a proposal's financial viability, a variation may be agreed on a case-by-case basis.

11.118 Policies AHOM1 and AHOM2 aim to assist the Council to meet its housing need and in particular to deliver the affordable housing need identified in Policy SP5.

11.119 The policy sets out the affordable housing contributions to be provided. The requirements of the policy reflect the findings of the Revised LDP's ongoing Viability Study and takes into consideration other factors such as the LHMA, past delivery rates and the need for flexibility to allow for variances between sites.

11.120 The Policy's requirements for on-site contributions apply to all proposed housing developments located within settlement boundaries with a capacity to deliver a net increase of 10 dwellings or more new homes. Those sites which fall outside of the settlement boundaries will be subject to the requirements of Policy AHOM2.

11.121 The policy's requirements for commuted sums apply to all proposed open market proposals resulting in a net increase of 1 – 9 new dwellings, with the exception of single dwellings which are categorised as 3-bed, 4-person homes and not exceeding 88 square metres in internal, habitable floor space.

11.122 The mix of dwelling sizes, types and tenure required to be provided on each site will vary according to the specific needs of the locality at the time of application. This will need to take into consideration the latest information on housing need from the LHMA, alongside any relevant local information such as the Council's waiting list and any recently delivered affordable housing units within the area.

AHOM2: Affordable Housing- Exceptions Sites

Proposals for 100% affordable housing development on sites adjoining the Development Limits of defined settlements (Tiers 1-3 in Policy SP3), will, in exceptional circumstances be permitted where it is to meet a genuine identified local need (as defined within the Glossary of Terms) and where:

  1. The site represents a logical extension to the development limits and is of a scale appropriate, and in keeping with the character of the settlement;
  2. The benefits of the initial affordability will be retained for all subsequent occupants;
  3. It is of a size, scale and design compatible with an affordable dwelling and available to low or moderate income groups;
  4. There are no market housing schemes within the settlement, or projected to be available which include a requirement for affordable housing.

11.123 The granting of planning permission will be subject to conditions and planning obligations which ensure the affordable housing remains available to meet future local affordable housing needs.

11.124 An affordable dwelling must be compatible with WG's Design Quality Requirement standards to limit its size, scale and design to ensure that the dwelling falls within a reasonable and acceptable affordable dwelling cost for future occupants. In exceptional circumstances, a departure from these standards may be considered appropriate where they are to meet the occupant's needs and are clearly evidenced and justified.

11.125 The Council may remove or restrict permitted development rights to place limitations upon amendments to the dwelling's size, scale and design to ensure its continued affordability for subsequent occupants.

11.126 Exceptions sites will only be permitted where satisfactory evidence is available which supports the provision. Proposals to meet speculative local need application will not be considered, rather they should relate to an identified need from individuals/families within the specific area.

11.127 Exceptions sites should not generally be considered in a settlement where existing allocations are being brought forward and an element of affordability is being provided as part of that development. Evidence will be required to demonstrate that no schemes on allocated sites are projected to commence within a reasonable time period.

11.128 Further information is provided through national policy in the form of PPW, TAN2: Planning and Affordable Housing and TAN6: Planning for Sustainable Rural Communities. Further elaboration and guidance on the implementation and interpretation of affordable housing will be set out in forthcoming SPG.

Strategic Policy – SP 6: Strategic Sites

In reflecting their contribution to the future growth requirements for Carmarthenshire and as key components of the Swansea Bay City Deal, two Strategic Sites have been identified as making an important contribution to the overall provision for growth during the Plan period:

Pentre Awel, Llanelli (PrC2/SS1); and Yr Egin – Creative Digital Cluster, Carmarthen (PrC1/SS1)

Pentre Awel, Llanelli

11.129 Pentre Awel will provide facilities and services which promote and improve well-being, integrate business development, education, healthcare, leisure, tourism, wellness support and research in life-sciences in one location, and deliver transformational social and economic benefits.

11.130 Pentre Awel will include an institute of life science providing space for research and development into new medical devices and healthcare technologies. The institute will also offer large office, laboratory and clinical spaces for growing new regional companies as well as opportunities for business start-ups.

11.131 There will be a wellness hub which will include a leisure centre, outdoor sports facilities, recreation opportunities and well-being promotion activities. There will be assisted living, a care home and dedicated housing (under C3 use class) for people with cognitive impairment or in medical rehabilitation.

11.132 There will be a life science and well-being centre where a range of wellness services from health, public, private and third sectors will be available in one location. The centre will also include training opportunities which will be developed to meet skills shortages.[53]

11.133 This world leading development will be situated along the Llanelli coastline. It will be the largest ever regeneration project in South West Wales, and aims to improve the health and wellbeing of people across the region, creating up to 2,000 high quality, well paid jobs and boosting the economy by £467 million over 15 years. It will be interlinked and integrated within the natural landscape, set around a freshwater lake and located within walking distance of the Millennium Coastal Park.[54]

11.134 In noting the strategic context, this project remains firmly rooted in the promotion of wellness at a local level.

An illustration showing an indicative masterplan for Pentre Awel, Llanelli.

Figure 9: Carmarthenshire County Council – extract from indicative masterplan for Pentre Awel, Llanelli

Yr Egin – Creative Digital Cluster, Carmarthen

11.135 Canolfan S4C Yr Egin is a digital and creative cluster at the University of Wales Trinity Saint David campus in Carmarthen.

11.136 Welsh language broadcaster S4C is the anchor tenant and many start-up and small businesses within the digital and creative sector co-locate in the flexible office spaces that is available in the building.

11.137 11.140 Yr Egin aims to be a catalyst for creating a vibrant creative cluster in the region by inspiring collaboration and developing talent, as well as enhancing the Welsh language.

11.138 The opportunities offered by this project are varied as the iconic building boasts an auditorium, superfast connectivity, state-of-the-art office space and post-production facilities for professional and community activities. It is envisaged that it will uphold the role of Carmarthen as a key hub for the creative sector in South West Wales.[55]

11.139 A further project (Egin Phase 2) is currently in the development stage. The project will supplement and support the success of Egin Phase 1 and will be based on the outcomes of the Phase 1 Lessons Learned exercise as well as a creative sector demand analysis.

A illustration showing an indicative masterplan for Yr Egin.

Figure 10: Carmarthenshire County Council – Yr Egin Site Masterplan

Strategic Policy – SP 7: Employment and the Economy

Sufficient land has been allocated for the provision of 71.21 hectares of employment provision for the Plan period in accordance with the Plan's Settlement Framework (Policy SP3) and sustainability principles.

The sustainable approach to the provision of employment land reflects the following:

  1. The allocation and delivery of:
    • Pentre Awel, Llanelli and
    • Yr Egin – Creative Digital Cluster, Carmarthen;
  2. Allocating employment land in sustainable location which accords with the sustainability principles of the Plan;
  3. Safeguard existing employment sites – recognising their contribution as part of the employment portfolio in meeting ongoing need;
  4. Supporting small scale sustainable employment developments and enterprises in lower tiered settlements.
  5. Ensuring support is provided to entrepreneurship as part of the creation of a diverse and growing economy;
  6. Allow appropriate small scale employment opportunities and rural enterprises in the countryside to support rural communities and to deliver a diverse and sustainable rural economy.

Swansea Bay City Region Deal

11.140 The future development of employment sites, and indeed the future economic development of the County should be viewed in the wider context. The Swansea Bay City Deal was signed in 2017, securing £1.24 billion for Swansea, Carmarthenshire, Neath Port Talbot and Pembrokeshire councils. It is anticipated that the Deal will transform the economic landscape of the area, boost the regional economy by £1.8billion, and generate almost 9,000 new jobs over 15 years.

11.141 The Deal will see three specific projects for Carmarthenshire – two of which are related to physical developments. These are Pentre Awel, Llanelli and a creative industry project at Yr Egin in Carmarthen. The third project relates to a skills and talent initiative which is centred within Carmarthenshire, and supports skills development within the region. With reference to these 3 projects specific to Carmarthenshire, it should be noted that 'The Homes as Power Stations project' aims to deliver smart, low carbon, energy-efficient homes through a co-ordinated approach across the City Region, whilst the 'Digital Infrastructure' project aims include supporting a thriving digital economy across the City Region.[i]

Evidence for future employment need

11.142 The Council has undertaken evidence gathering to provide an understanding of the future employment need notably around the Welsh Government's nine priority sectors.[56] Further evidence has been prepared in conjunction with Pembrokeshire County Council to establish quantitative analysis of forecast demand for employment sites at the larger than local level. This Two County Study was supplemented by market and employer evidence in relation to market demand. In addition, work has been undertaken in relation to the links between equating the levels of employment land and jobs with the requirement for new homes growth for the County.

11.143 The Two County Study seeks to achieve a balance between fulfilling the requirements of Technical Advice Note 23 on Economic Development (February 2014), whilst placing a strong emphasis on flexibility, realism of sector growth and ability to meet demand at a regional scale.

11.144 TAN 23 considers that 'land provision targets may be higher than anticipated demand, to allow for the chance to meet demand. The Practice Guidance to the TAN (August 2015) considers that, where justified, land provision targets maybe higher than anticipated demand, to allow for the chance that the assessments are too low and to ensure that no opportunities are missed. In acknowledging the importance of not solely relying on employment forecasts when identifying a portfolio of employment land, the Two County Study emphasises the demand and confidence of indigenous businesses to remain and grow, and a desire by stakeholders to preserve locational advantages and strategic assets for future growth.

11.145 In recognition of the above, the Two County Study has identified a portfolio of sites within the study area which are considered to offer strategic benefits and opportunity for growth and job creation.

Public Sector Intervention

11.146 A report published by the Welsh Government in 2020[57]to inform the new Property Delivery Plan highlighted that while the delivery of industrial and office accommodation is generally led by the private sector, there are strong grounds for public sector intervention. This includes responding to evidence of demand for new or additional capacity, attracting and retaining investment that would not otherwise come to an area, or through influencing commercial decisions for example by bringing new economic activity to a redundant site.

Communications Infrastructure

11.147 The Council recognises that there are clearly experiences arising from the Covid 19 pandemic which have big implications for future working practices and the future needs of workspace (confirming the importance of flexibility); In this context, a key area is the importance of high-quality communications infrastructure (broadband, mobile reception and ability to future proof/upgrade). This is important for residents and business especially in the context of greater remote working and its role in addressing the peripherality of the rural areas (reference should be made to Policy EME5: Home Working and Policy INF3: Broadband and Telecommunications).

Employment Hierarchy

11.148 Whilst the strategic focus is associated with the Swansea Bay City Deal and the potential generation of 'valued added' jobs, the Revised LDP will provide a range of sites and opportunities for potential inward investment and relocations. This includes potential sites for larger employers, as well as sites to accommodate new smaller scale and start-up business uses within the policy framework.

11.149 Further regard has also been had to a range of considerations to ensure that the level of land provision is reflective of not only a range of deliverable sites but also that they are based upon a robust understanding of their character and site areas.

11.150 The emphasis on the Principal Centres not only reflects their sustainability credentials but also their historic legacy. The distribution of employment land is also well-aligned with the sustainable locations within the County which are accessible by public transport or active travel routes which minimise the need for travel.

11.151 The following table sets out the employment land provision contained within the policy and identifies completion levels and sites which are committed by virtue of a valid planning permission.

A. LDP Alloc

B. Completed

C. Completed but not forming part of allocated figure.1

D. Committed

E. Residual Supply

(A-B-D=E)

PC1 - Carmarthen

18.687

0

0

2.18

16.507

PC2 - Llanelli

17.489

0

0

1.90

15.589

PC3 – Ammanford / Cross Hands

28.118

9.91

18.598

Service Centres

6.916

3.53

3.225

Sustainable Villages

0

0

0

0

0

Rural Villages

0

0

0

0

0

Total

71.21

17.29

53.92

Table 6: Employment Land Provision

11.152 It should be noted that the provision of allocated employment sites includes non-operational land with scope for landscaping, buffer zones and other such uses.

EME1: Employment- Safeguarding of Employment Sites

Sites identified for employment purposes through policy SP7 and existing employment sites will be safeguarded for such uses (B1, B2, B8 and those identified through relevant policy provisions).

Exceptionally, proposals which result in their loss will only be permitted where it can be demonstrated that:

  1. The site or premises is no longer required or suitable for employment use;
  2. The proposed use could not reasonably be located elsewhere in accordance with the policies of this Plan;
  3. There is sufficient quantity, quality and variety of employment land or premises that can be brought forward to meet the employment needs of the County and the local area;
  4. There are no economically viable industrial or business employment uses for the site and premises;
  5. An employment use is incompatible with adjoining/surrounding uses;
  6. Where applicable the proposed uses are complimentary to the primary employment use of the surrounding area and will not cause an unacceptable impact on the operations of existing businesses.

11.153 This policy seeks to ensure that existing employment sites are protected from alternative uses. In order to maintain an adequate supply of employment land which provides for a range and choice of potential uses, this policy seeks to protect defined employment areas from non-employment uses which should be in better and potentially more appropriate locations.

11.154 In recognition of the pressures on employment areas from alternative uses (non-Class B), the policy accepts that some flexibility may in some instances be required. Such uses are often partial B class uses combining a small-scale retail element with predominantly business, industrial or storage use, or are sui generis. It is also accepted that in meeting the needs of such uses, employment areas are often likely to be more acceptable than other locations such as residential areas, or even town centres. Any retail element will be expected to be ancillary to the primary use, and for trade purposes as opposed to the public.

11.155 Development proposals will, where necessary be required to incorporate appropriate measures to protect the amenity of neighbouring or nearby properties. Such measures may include the identification of buffer zones and suitable landscaping proposals.

11.156 Where appropriate, planning conditions will be imposed to prevent the loss of employment as the primary use.

EME2: Employment – Extensions and Intensification

Proposals for extensions and/or intensification of existing employment enterprises will be permitted provided that:

  1. The development proposals are not likely to cause environmental damage or prejudice other redevelopment proposals;
  2. The proposal does not extend and/or intensify a use or activity that might result in adverse amenity issues, or may not be compatible, with neighbouring uses;
  3. The development proposals are of an appropriate scale and form compatible with its location;

Proposals for the expansion of existing rural enterprises will be supported subject to the above provisions and the policies and proposals of this Plan.

11.157 Proposals which seek to extend and/or intensify a use or activity will not be favourably considered if they are not compatible with surrounding uses, or likely to result in adverse amenity issues which would prejudice other redevelopment proposals.

11.158 Appropriate expansions of existing businesses can contribute significantly to the local economy, and the re-development of existing sites where it will improve the quality of employment floor space particularly in meeting modern employment needs, will be supported.

11.159 This policy supports the rural economy and makes provision for the appropriate expansion of established rural enterprises.[58] Reference should also be made to PPW and TAN23 Economic Development.

EME3: Employment Proposals on Allocated Sites

Proposals for B1, B2 and B8 employment development will be permitted on the following allocated employment sites where they comply with the proposed use of the site:

Site Ref:

Site Name:

Location:

Use Class:

Ha:

PrC1/E1

Cillefwr Industrial Estate1

Carmarthen

B1, B2, B8

4.167

PrC1/E1 (i)

Land west of Cillefwr Road West

2

PrC1/E1 (ii)

Land north of Alltycnap Road

1.215

PrC1/E1 (iii)

Land south of Alltycnap Road

0.952

PrC1/MU1

West Carmarthen

Carmarthen

B1, B2, B8

4.53

PrC1/MU2

Pibwrlwyd

Carmarthen

B1,B2, B8

8.95

PrC1/SS1

Yr Egin

Carmarthen

B2

1.04

PrC2/E2

Dafen1

Llanelli

B1,B2,B8

17.489

PrC2/E2 (i)

Land east of Calsonic

4.723

PrC2/E2 (ii)

Land west of Gestamp Tallent

1.547

PrC2/E2 (iii)

Land at Heol Aur

1.657

PrC2/E2(iv)

Land west of Heol Gors

1.449

PrC2/E2 (v)

Land at Heol Croppin

0.355

PrC2/E2 (vi)

Land west of the Beacon

1.881

PrC2/E2 (vii)

Land east of Air ambulance Base

1.316

PrC2/E2 (viii)

Land at Llanelli Gate, off Heol Aur

3.755

PrC2/E2 (ix)

Land west of Llys Aur

0.806

PrC3/E1

Cross Hands East

Ammanford / Cross Hands

B1,B8

8.31

PrC3/E2

Cross Hands West Food Park

Ammanford / Cross Hands

B1,B2,B8

5.647

PrC3/E2(i)

Land west of Castell Howell

1

PrC3/E2(ii)

Land south of Heol Parc Mawr

2.712

PrC3/E2(iii)

Land north of Dunbia

1.935

PrC3/E3

Cross Hands Business Park

Ammanford / Cross Hands

B1,B2,B8

4.76

PrC3/E3 (i)

Heol Stanllyd (West)

2

PrC3/E3 (ii)

Heol Stanllyd (South)

2.156

PrC3/E3 (iii)

Heol Stanllyd (East)

0.604

PrC3/E6

Capel Hendre Industrial Estate

Ammanford / Cross Hands

B1,B2,B8

0.538

PrC3/E7

Parc Hendre, Capel Hendre1

Ammanford / Cross Hands

B1,B2,B8

8.112

PrC3/E7(i)

Parc Hendre (West)

2.165

PrC3/E7(ii)

Parc Hendre (North)

1.955

PrC3/E7(iii)

Parc Hendre (East)

1.05

PrC3/E7(iv)

Parc Hendre (South)

2.942

PrC3/E8

Cilyrychen Industrial Estate

Cilyrychen

B1,B2,B8

0.751

SeC4/E1

Dyfatty

Burry Port

B1,B2,B8

3.036

SeC16/E1

Beechwood Industrial Estate

Llandeilo / Rhosmaen

B1,B2,B8

0.289

SeC16/MU1

Beechwood

Llandeilo / Rhosmaen

0.755

SeC16/E2

Former Market Hall

Llandeilo

B1

0.2

SeC18/E1

St Clears Business Park

St Clears

B1,B8

0.421

SeC19/E1

Whitland Industrial Estate

Whitland

B1,B8

0.489

SeC19/E2

Land South of Former Creamery

Whitland

B1,B2,B8

1.321

SeC13/E1

Old Foundry

Llanybydder

B1,B8

0.405

Total

71.21

Table 7: Employment Proposals on Allocated Sites

11.160 The total figure in the above table includes notional figures for B use employment on Mixed Use sites (Policy SG1) and Strategic sites (Policy SP6).

11.161 Where appropriate, other employment and related ancillary non-B class uses will be permitted on allocated employment sites where the proposed development complements and enhances the site's role as identified in the Employment Site Allocation table. Consideration must be given to the amenity and the safe operation of adjacent employment uses to avoid conflict between different land uses.

11.162 This Policy also enables the provision of complementary ancillary employment uses that fall outside the B use classes where this improves site viability and enables new site development. Ancillary uses that might be complementary include day nurseries, training centres, waste recycling and vehicle repairs. Retail uses will be considered against the LDP's retail policies.

EME4: Employment Proposals on Non-Allocated Sites

Proposals for employment development on non-allocated sites, but within the development limits of a defined settlement will be permitted where:

  1. it is demonstrated that no other suitable existing or allocated employment sites or previously developed land can reasonably accommodate the proposal;
  2. the development proposals are of an appropriate scale and form, and are not detrimental to the respective character and appearance of the townscape/ landscape;
  3. The development is compatible with its location and with neighbouring uses.

Employment proposals outside the development limits of a defined settlement (Policy SP3) will be permitted where:

  1. The proposal is directly related to a settlement or hamlet; or
  2. The proposal is supported by a business case which demonstrates that its location is justified; and
  3. The proposal is of an appropriate scale, size and design.

11.163 It is evident that not all employment proposals will be appropriately accommodated on allocated employment sites. Policy EME4 therefore supports the economy by enabling, in both urban and rural areas, the provision of economic opportunities on non-allocated sites. This has an enhanced importance as a result of the Covid-19 pandemic and the likely implications for future work trends/workspace, as well as the need for reliable super-fast broadband (reference should be made to Policy INF3: Broadband and Telecommunications).

11.164 Within the development limits of a defined settlements, the policy requires proposals to demonstrate their locational requirement through a sequential approach to site selection. In the first instance, they must look to proposed and existing allocations to cater for employment need. Only then should non-allocated sites be considered.

11.165 For proposals outside the development limits of a defined settlement, they must show that they are directly related to a settlement or hamlet, or supported by a business case which justifies its location. The Plan recognises that small-scale enterprises have a vital role to play in the rural economy and contribute to both local and national competitiveness and prosperity. Many commercial and light manufacturing activities can be appropriately located in rural areas without causing unacceptable disturbance or other adverse effects. In this respect, the development of small businesses would address any local need for employment accommodation.

11.166 Reference is made to policies RD3 Farm Diversification, RD4 Conversion and Re-use of Rural Buildings for Non-Residential Use and EME5 Home Based Businesses for further opportunities for employment undertakings outside development limits.

EME5: Home Based Businesses

Proposals for home based businesses (where planning permission is required) will be permitted where it can be demonstrated that it would be compatible with adjacent land uses, and that it would not result in any adverse impacts on local amenity and/or the character of the area.

11.167 The policy relates to small businesses operating from home providing for considerations resulting from the increasing trend for home working (for now and the future).

11.168 This Plan recognises that such businesses can play an important role in developing and supporting a diverse economy across the Plan area. It is recognised that many small businesses are started by individuals working from their own homes, and that such instances are likely to increase as technological innovations increase. In considering home working within the context of planning, it is recognised that it does not necessarily require planning permission. For instance, planning permission will not normally be required where the use for business purposes proposed for part of the house does not result in a change to the overall character of the property and its use as a dwelling.

11.169 Generally the requirement for planning permission results where the business activity ceases to be ancillary to its use as a dwelling or where the residential character of the property is altered. Where such businesses are of a scale and intensity where planning permission will be required, the Council will have regard to the implications of the proposal on surrounding properties and on the likely access and parking arrangements emanating from the nature of the proposal.

11.170 PPW encourages the growth of self-employment and micro businesses in rural areas. The policy seeks to adopt a supportive approach to home working and proposals where a planning permission is required (including change of use).

11.171 In considering proposals for rural enterprises regard should be had to the provisions of national policy in the form of PPW and TAN6 and Policy EME4.

Strategic Policy – SP 8: Welsh Language and Culture

The Plan supports development proposals which safeguard, promote and enhance the interests of the Welsh language and culture in the County. Development proposals which have a detrimental impact on the vitality and viability of the Welsh language and culture will not be permitted unless the impact can be mitigated. All development proposals subject to WL1, will be expected to identify measures which enhance the interests of the Welsh language and culture.

11.172 The Welsh language and culture play an important role in the social, cultural and economic life of Carmarthenshire's residents and visitors. The proportion of Welsh speakers in Carmarthenshire is significantly higher than the Welsh national average and as such is a significant part of the social fabric of the County's communities, providing a strong sense of place and identity.

11.173 Carmarthenshire in its entirety is considered to be an area of linguistic sensitivity. The 2011 Census indicates that 19.0% of the Welsh population are able to speak Welsh, whilst the correlating figure for Carmarthenshire stands at 43.9%. In terms of the geographical breakdown of the proportion of speakers across the County, this is lowest in the Glanymor electoral ward where 19.2% speak Welsh, and highest in Quarter Bach where 68.7% speak Welsh. The proportion of Welsh speakers is higher than the national average across each ward in the County, and it is largely for this reason Carmarthenshire in its entirety is considered to be linguistically sensitive. Additionally, the most recent Census data has shown a substantial decrease in the number of Welsh speakers across the County illustrating the language's vulnerability in Carmarthenshire.

11.174 The Plan seeks to 'promote the Welsh language and culture'[59] and is committed to contributing to the Welsh Government's long-term aim of achieving 1 million Welsh speakers by 2050[60]. To deliver on this aim, the Council will support, promote, and enhance the Welsh language as a viable community language by ensuring that there are sufficient and proportionate employment and housing opportunities to sustain both the rural and urban communities in the County and by implementing an effective monitoring framework. In doing so, the Plan seeks to ensure that the local population have the opportunity to remain in Carmarthenshire rather than leave in search of work opportunities and housing, as well as the opportunity to return. Through aiming for sustainable growth, the Plan will also maximise opportunities for non-Welsh speakers who move to the County to be integrated into community life at a scale and pace that will not undermine the vitality and viability of the Welsh language and culture.

11.175 The need to safeguard, promote and enhance the Welsh language applies to developments proposed across the County and is not restricted to specific areas within the County. Development proposals will be required to acknowledge the official status of the Welsh language and commit to treating the Welsh language no less favourably than the English language.

11.176 Specific policies provide further guidance to ensure that development of an appropriate scale, type and character is delivered to meet the needs of the communities. Furthermore, the Revised LDP will seek to ensure that development occurs at a rate which can be absorbed and assimilated without damaging the character of the community.

11.177 The Plan also seeks to safeguard, promote, and enhance the Welsh language in Carmarthenshire through other relevant policy objectives, namely through the provision of housing and affordable housing, promoting a vibrant economy and employment opportunities and the provision and retention of community facilities, amongst others.

WL1: Welsh Language and New Developments

All development proposals throughout Carmarthenshire will be required to safeguard, promote and enhance the Welsh language.

The following development proposals will be required to submit a Language Action Plan, setting out the measures to be taken to safeguard, promote and enhance the Welsh language:

  1. Residential developments of 5 or more dwellings which will individually or cumulatively provide more than the indicative housing provision set out for the settlement in Policies HOM1 and HOM3; or
  2. Residential development of 5 or more dwellings on allocated or windfall sites that do not address evidence of need and demand for housing recorded in a Housing Market Assessment or other relevant local sources of evidence; or,
  3. Retail, commercial or industrial developments with a total floorspace of 1,000 sqm or more or a site area measuring more than 1 hectare.

Proposals on unanticipated windfall sites for large scale housing development or large scale employment development that would lead to a significant workforce flow are required to submit a Welsh Language Impact Assessment which will set out how the proposed development will protect, promote and enhance the Welsh language.

Proposals which do not accord with the Plan's housing trajectory (Appendix 7) will be required to provide a phasing plan outlining the timescales for delivering the homes proposed on the site and demonstrate that they would not have a negative impact upon the Welsh language which cannot be mitigated.

11.178 The Welsh Language Action Plan sets out the measures to be taken to safeguard, promote and enhance the Welsh language. The Welsh Language Action Plan should also outline how the development proposes to make a positive contribution towards the community's Welsh language groups. This could, amongst others, include providing support and funding towards organisations and bodies that provide activities, facilities and education for Welsh speakers and learners, and support and funding towards Welsh language classes. Welsh Language Impact Assessments (WLIA) will be required to outline the anticipated impacts of the proposed development upon the Welsh language in the County. The Welsh Language Supplementary Planning Guidance[61] provides further guidance on when a WLIA is required, clarifying what constitutes a large scale development, as well as how to produce a WLIA.              

11.179 Whilst support for projects can be provided through financial contributions, they may also be provided through other means. Planning permission will be subject to conditions or legal agreements to secure the implementation of the mitigation and enhancement measures proposed within the Action Plan. Further guidance on the content of Welsh Language Action Plans will be provided through Supplementary Planning Guidance.

11.180 The LDP's housing trajectory is outlined in Appendix 7 of the Plan. The impacts of the scale, location and rate of development have been assessed in accordance with the agreed trajectory. Proposals for developments which do not accord with the timescales of the trajectory are consequently not fully assessed. Such proposals will therefore be required to be supported by a phasing plan outlining the number of dwellings to be delivered within each financial year. In such cases, planning permission may be subject to a condition to secure the agreed phasing of delivery where considered necessary. Applicants may also propose to mitigate anticipated impacts though methods other than phasing the development, further information and guidance on mitigation measures will be outlined through Supplementary Planning Guidance.

11.181 The Plan's Strategy provides for organic growth on a small scale within the Rural Villages and policies HOM1 and HOM3 build upon this allowing development of appropriate scale and in appropriate locations. It is considered that incremental development on this scale can make a positive contribution towards the sustainable growth of the Welsh language in rural communities, and any negative impacts are likely to be absorbed by the community. Unforeseen development of significant scale which is not allowed for in the Plan's policies may not be compatible with the Plan's Strategy, and their impacts are therefore unassessed and unknown. In the event that such proposals are presented for consideration, they will need to be accompanied by a full assessment of their likely effects upon the Welsh language.

11.182 The ISA of the LDP is required to assess the likely effects of the LDP upon the Welsh language. This is done iteratively at key stages throughout the Plan's production. The likely anticipated effects are presented in the ISA report, and further information is available within the LDP's evidence base.

11.183 The LDP provides further guidance on the provision of bilingual advertisements in Policy PSD9 – Advertisements. In order to promote the cultural identity and to safeguard the local linguistic character of Carmarthenshire, the Council will encourage bilingual marketing of new housing and commercial developments as well as encourage Welsh street and development names. Additional guidance on providing Welsh street names is provided in Carmarthenshire's Street Naming and Numbering Policy.

Strategic Policy – SP 9: Infrastructure

Development will be directed to sustainable locations where the infrastructure, services and facilities considered necessary to deliver and support the development proposal are available or can be provided.

Development proposals will need to demonstrate that there is sufficient capacity in the existing infrastructure to deliver and support the proposed development. Where this cannot be achieved, proposals will need to demonstrate that suitable arrangements and funding are in place to provide the infrastructure capacity considered necessary to deliver and support the development.

Proposals for ancillary development to the utilities infrastructure will be permitted where

  1. They have regard to their setting;
  2. Incorporate landscaping;
  3. Do not conflict with the area's built, historic, cultural and nature conservation and landscape qualities.

The delivery of new or improved infrastructure, or other facilities or services to support the requirements of the site must be undertaken in a timely manner to meet the needs of communities prior to, or from the commencement of, the relevant phases.

11.184 The provision of appropriate infrastructure, services, and facilities are vital to ensure the delivery of the Plan's policies and proposals. Appropriate infrastructure is key to facilitate development but is also a necessity to support the ongoing needs and demands of a development and Carmarthenshire's communities.

11.185 A range of infrastructure may be required, and these will vary greatly according to the nature or type, scale, location, and existing infrastructure provision. In considering the needs of development proposals the following infrastructure, services and facilities may be required:

  • Roads and other transport facilities including sustainable transport, public transport, walking and cycling routes
  • Schools and other educational and training facilities
  • Affordable Housing
  • Health provision
  • Public Open Spaces and green and blue infrastructure
  • Flood Defences
  • Leisure, Sporting, and Recreation
  • Utility services,
  • Biodiversity and environmental protection and enhancement
  • Community facilities
  • Digital Infrastructure
  • Welsh language support
  • Water quality and efficiency
  • Upgrading and improvement of Waste Water Treatment Facilities and infrastructure.
  • Other facilities and services considered necessary

11.186 The Plan seeks to ensure that the infrastructure, services and facilities needed to support development is delivered in a timely manner prior to, or upon the commencement of the development, or where appropriately phased through the development process. The Plan encourages the delivery of infrastructure is undertaken in a coordinated manner with minimal disruption caused to existing communities.

11.187 Contributions to infrastructure will be secured through conditions or Planning Obligations in accordance with the legislative and policy framework provided.[62] Reference should be made to Policy INF1: Planning Obligations.

11.188 Developers should have regard to Appendix 7: Housing Trajectory and to the emerging implementation and delivery evidence which provides additional information in respect of the delivery and infrastructural requirements of the LDP's key sites. Regard should also be to the requirements of Policy PSD2: Masterplanning. Developers are encouraged to enter into early dialogue with the Council in order to identify the infrastructure required to deliver and support a proposed scheme.

11.189 Reference is made to the preparation of Drainage and Wastewater Management Plans (DWMPs) as prepared by Dŵwr Cymru Welsh Water. It is anticipated that the DWMPs will compliment the implementation of this LDP through the management of the drainage and sewerage network.

INF1: Planning Obligations

Where necessary, planning obligations will be sought to ensure that the effects of developments are fully addressed in order to make the development acceptable. Contributions will be required to deliver or fund improvements to infrastructure, community facilities and other services and facilities to address requirements or impacts arising from new developments.

Where applicable, contributions will also be sought towards the future and ongoing maintenance of such provision.

In instances where there is a dispute regarding matters relating to the financial viability of delivering the requirements, the applicant will be required to meet the Council's costs of securing an independent financial viability appraisal / assessment.

11.190 The planning obligations required will be considered on a case by case basis subject to the nature of the proposal and the requirements emerging from it. There may be instances where all required obligations cannot be secured due to their impact upon the scheme's financial viability. In such cases, the infrastructural priorities for that site will need to be identified. Whilst the priorities can vary according to the specific needs of each site and their communities it should be noted that the requirements of Policy NE4 Development within the Caeau Mynydd Mawr SPG Area will be prioritised above other contributions in respect of sites within the SPG Area. In all other instances, it is generally considered that the priority for the Authority will be the provision of affordable housing and in most cases its provision will be prioritised above other contributions.

11.191 The requirements of planning obligations will take into consideration the financial viability of a proposed development. In instances where there is dispute regarding the impact which the requirements have upon the financial viability of the scheme, the applicant will be required to submit a Development Viability Appraisal of the site to understand its financial viability. The appraisal will be analysed by a third party with all costs covered by the applicant. Further information is provided within the Planning Obligations SPG.

INF2: Healthy Communities

Proposals for development which provide for active travel, accessible useable green spaces, and infrastructure, and which seek to reduce health inequalities through encouraging healthy lifestyles, addressing the social determinants of health and providing accessible health care facilities will be supported.

Proposals for development specified within the supporting text below will be required to submit a Health Impact Assessment in accordance with the sequential approach.

11.192 The links between health and well-being and planning are reflected in legislation and national planning policy. In this respect PPW seeks to provide a framework for the delivery of a series of National Sustainable Placemaking Outcomes. This holistic approach to the planning and design of development and spaces reflects a focus on positive outcomes promoting people's prosperity, health, happiness, and wellbeing. The promotion of physical and mental health and well-being as a Facilitate Accessible and Healthy Environments Outcome reflects these links between health, well-being and planning and the need to reflect any potential effects that may arise from the planning process.

11.193 Health Impact Assessment (HIA) can make a valuable contribution when proposing or making decisions on new development. Evidence on health impacts can help the planning system develop stronger and more coherent approaches towards maximising health and well‑being[63]. The Public Health (Wales) Act 2017 sets out provisions for making improvements to health including for the Welsh Ministers to publish a national strategy on tackling obesity and to make regulations about the carrying out of health impact assessments by public bodies.

11.194 HIAs assess the impact of any change or amendment to a policy, service, plan, procedure or programme on the health of the population and on the distribution of those effects within the population, particularly within vulnerable groups. Undertaking a HIA produces information on how negative impacts on health can be reduced and positive health gains can be encouraged. Such evidence on health impacts can help the planning system develop stronger and more coherent approaches towards maximising health and well‑being.

11.195 It is important that proposals take into account a wide range of health and well-being related factors as part of the formulation and preparation of any scheme or development. It is important that these are considered from the outset. Consequently, developers are encouraged to engage with the local planning authority and other stakeholders, such as the Local Health Board (LHB) as early as possible in preparing development proposals. A HIA should be provided to accompany any application for opencast coal working.

Healthy Communities: HIA Sequential Checklist

11.196 To assist in the promotion of physical and mental health and well-being, the following sequential approach should be considered by developers followed to determine the requirement for, and potential scope and content of a HIA. This requirement applies to major developments are defined in planning legislation as:

  • Residential developments of 10 or more dwellings or 0.5 hectares or more;
  • The provision of a building or buildings where the floor space to be created by the development is 1,000 square metres or more; or
  • Development carried out on a site having an area of 1 hectare or more

11.197 The following sequential approach in considering the need to a HIA reflects the guidance set out within Health Impact Assessments a Practical Guide[64].

  • STEP 1: Screening – Deciding whether to undertake a HIA

    Screening takes an initial look at the potential impacts of the proposal on the local population and any specific vulnerable groups defined within it. It should highlight any potential health risks or benefits and any groups that may be particularly affected. The outcome of screening is a decision whether or not to undertake HIA and, if so, to determine what type of HIA will be required. It should also provide an explanation of how the decision was reached.

  • STEP 2: Scoping – Determining the focus, methods, and work plan. This stage involves asking a number of questions and making a number of decisions to establish the terms of reference, roles and responsibilities and agreed plan for the HIA.
  • STEP 3: Appraisal of Evidence – Identifying the health impacts. This is the key stage of health impact assessment. The purpose is to gather information about the potential nature, size, likelihood and distribution of the proposal's health impacts. It also provides an opportunity to suggest possible ways of maximising the health benefits and minimising the risks, particularly to those whose health may be most vulnerable or the most disadvantaged population groups. It also provides an opportunity to identify and suggest actions that might address 'gaps' in the proposal or plan.

    Although HIA is not in itself a research method, it draws upon a range of sources of information and methods for collecting and analysing data, to which appropriate methodological rules and procedures will apply.

  • STEP 4: Reporting and Recommendations - Once the evidence and data has been collected, a set of recommendations should be developed, informed by the previous stages of the HIA. These recommendations should aim to maximize any potential health and well-being benefits and mitigate potential negative impacts. They can be an opportunity to 'fill in' any identified gaps within the proposal and readdress any health (or other) inequalities that may be caused.

Recommendations need to be:

  • Clear and concise
  • Realistic
  • Achievable
  • Manageable in number
  • Impartial
  • Reflective of all evidence and representatives' views
  • Agreed by consensus

Reference should be made to guidance in the form of SPG.

Not all the health and well-being related issues will be relevant to all types of developments and the Council recognises the need for a balanced approach to the determination of development proposals where health related matters are one of many other material considerations. Developers will be expected to utilise the sequential approach specified above to identify what is relevant and ensure it is included in the supporting documentation accompanying any proposal as appropriate.

INF3: Broadband and Telecommunications

The Council will work with the telecommunications industry and the communications regulator Ofcom to maximise access to reliable super-fast broadband, wireless hotspots and improved mobile availability for all residents and businesses, assisting them (where appropriate) in delivering their investment plans to address any infrastructure deficiencies.

New developments should include the provision of Gigabit capable broadband infrastructure from the outset.

New major developments must be served by a high speed and reliable broadband connection to the premises.

Smaller developments should provide access to the most viable high-speed connection as well as additional ducting for future Fibre to the Premises (FTTP) or other provision.

Exceptions will be made where applicants have shown through consultation with broadband infrastructure providers, that this would not be possible, practical or economically viable. In such cases, an equivalent developer contribution towards off-site works may be sought which could enable greater future access.

11.198 The policy seeks to reflect the demands of a modern Wales for reliable fast and high capacity communication networks. In this respect it supports the Welsh Government's objective to offer fast and reliable broadband to every property in Wales and to support the deployment of mobile infrastructure across the country[65]. It seeks to reflect the context of broadband infrastructure as an essential service and one which can help support and develop the local economy as well as vibrant and inclusive communities. The policy reflects the provisions of Future Wales: The National Plan 2040 which supports the provision of Gigabit capable digital infrastructure into new developments where people are present, for example new housing, business and commercial premises, and public buildings.

11.199 In applying the policy, it should be noted that BT Openreach and other providers offer superfast broadband connection for all new developments, either free of charge, or as part of a co-funded partnership including community funded partnerships. FTTP shall be provided free of charge to housing developments by BT Openreach based upon their thresholds at that time. Developments smaller than this may have to provide contributions to ensure FTTP connection, or shall be provided copper connections for free.

11.200 In supporting the delivery of full fibre, BT Openreach have set UK wide targets, and provide guidance and support to developers in building full FTTP networks to new residential or mixed residential/commercial sites.

11.201 The policy also recognises that in a small proportion of cases, broadband will not be able to be provided to new developments due to their very rural location. The policy therefore includes the potential to provide a sum of money to contribute towards an alternative solution. However, wherever possible the solution should include the development making necessary provision for on-site infrastructure to facilitate the improvements.

11.202 The provision of high-speed and reliable broadband within rural areas will assist in supporting the delivery of the Plan's strategy through providing additional opportunities to boost the rural economy and economic diversification.

INF4: Llanelli Wastewater Treatment Works Catchment Surface Water Removal

Proposals that drain to Llanelli Waste Water Treatment Works and are defined as major under Article 2 of the Town and Country Planning (Development Management Procedure) (Wales) Order 2012 will be subject to a requirement to remove a quantifiable amount of surface water from the combined sewer system as set out within the Burry Inlet Supplementary Planning Guidance.

11.203 Within the Llanelli Waste Water Treatment Works (WWTW) catchment, there are concerns that the connection of foul flows generated by new development introduces the risk of deterioration in the water quality of the Carmarthen Bay and Estuaries European Marine Site (CBEEMS). This is due to the fact that the majority of the sewer system in the Llanelli WWTW catchment is combined (surface and foul flows).

11.204 Whilst Dŵr Cymru Welsh Water (DCWW) have confirmed that there is sufficient capacity within Llanelli WWTW to deliver this Plan's identified growth, they have also requested that relevant developments within the Llanelli WWTW catchment be subject to a requirement to undertake compensatory surface water removal from the system as part of the granting of planning permission. In noting the specific reference to Dŵr Cymru Welsh Water in this paragraph, it should be noted that the consideration of these matters is subject to a multi-agency approach which includes Dŵr Cymru Welsh Water, Natural Resources Wales and Carmarthenshire County Council. Also, the City and County of Swansea are included in discussions in regards the Burry Inlet. The Statement of Common Ground will accompany and support the implementation of Policy INF4 and its supporting SPG.

11.205 There is concern that introducing additional foul flow can lead to overloading to the WWTW, as well as an increasing the frequency of discharges from combined sewer overflows out to the CBEEMS during significant rainfall. There can also be potential localised flooding issues resulting from these issues.

11.206 The Burry Inlet SPG has been prepared to provide specific guidance in relation to the consideration of relevant development proposals located within the Llanelli WWTW catchment. Whilst Llanelli (Principal Centre) and Burry Port (Service Centre) are identified as a focus for growth in this Plan, they are also subject to high level environmental considerations, not least the water quality of the (CBEEMS). Reference can also be made to LDP policy CCH4: Water Quality and Protection of Water Resources.

11.207 The Burry Inlet SPG has been built on consensus and seeks to provide certainty for stakeholders and developers alike. Its primary function is to assist in the delivery of growth as set out within this Plan. It provides a mechanism for the requirement for compensatory surface water removal to be undertaken by relevant developments. This is designed to allow development to contribute towards an overall betterment in the position, whilst alleviating concerns that proposals will be subject to objections by key stakeholders – notably DCWW and Natural Resources Wales.

11.208 There is a long-established partnership approach with regards to this matter, including a Memorandum of Understanding. Policy INF4 reflects this partnership approach moving forward. Reference should be made to paragraph 11.203 in regards the reference to the Statement of Common Ground.

11.209 The SPG also provides clarification on instances where Carmarthenshire County Council is the applicant or landowner and seeks to utilise surplus betterment it has previously accrued on the surface water removal register.

INF5: Rural Allocations outside Public Sewerage System Catchments

Proposals for the delivery of sites of 5 or more dwellings in settlements where there is no connection to the public sewer will be supported where they are served by a single private system. Such proposals will be permitted where it does not have a detrimental effect on the natural environment, surrounding uses or local amenity.

11.210 There is concern that the proliferation of private sewers is having a detrimental impact on the environment. This policy aims to discourage a development from having individual private sewers and instead encourage utilisation of a shared private sewerage system.

Strategic Policy – SP 10: Gypsy and Traveller Provision

The following Local Authority sites are allocated to meet the identified need for Gypsy and Traveller Accommodation and to allow for the potential future expansion of Gypsy and Traveller Households:

Site Ref:

Location

Type of Need

PrC2/GT1

Land at Penyfan, Trostre, Llanelli

Residential

PrC/GT2

Penybryn (extension), Bynea, Llanelli

Residential

Table 8: Gypsy and Traveller Provision

11.211 To consider the future Gypsy and Traveller provision within Carmarthenshire, the County Council has undertaken two Gypsy Traveller Accommodation Needs Assessment (GTAA) which identify the current unmet need for Gypsy and Traveller pitches within the County. The initial report was undertaken in 2015 to cover the period up to 2031, whilst the 2019 update ensures that the Plan is informed in terms of Gypsy and Traveller need for the Plan period through to 2033.

11.212 The Assessments consider the methodology set out by Welsh Government Guidance and outlines two types of the assessment of need; the first considers the first 5 years of the GTAA period; and the second considers the full 15 year GTAA period.

11.213 Based on the 2019 Gypsy and Traveller assessment, the current unmet need is for 19 pitches, whilst Carmarthenshire's estimated provision for the first 5 years is for 23 additional pitches. A large proportion of this need has arisen from households living in bricks and mortar, and new household growth from within these households. The make-up of this need is located within Llanelli, where a large number of these households had previously lived on the public site at Penybryn.

11.214 An estimate has also been made for newly arising Gypsy and Traveller households in years 6-15 of the GTAA. This would include, for example, young adults living on existing sites who, in time, will form their own household and therefore would require their own pitch. The GTAA estimates a need for 8 further pitches in years 6-15, totalling a requirement of 31 pitches through to 2033.

11.215 The GTAA also looked at the accommodation needs for Travelling Showpeople within Carmarthenshire. This element of the assessment identified 9 authorised or tolerated pitches for Travelling Show people within the county. In considering the future projection, the 2019 assessment identifies a requirement of 4 additional pitches in the first five years of the assessment.

11.216 The requirement and take-up of pitches will also be closely monitored as part of the monitoring framework of this plan and reported through the Annual Monitoring Report arrangements.

GTP1: Gypsy and Traveller Accommodation

  1. Proposals for new Gypsy and Traveller sites, or extensions to existing authorised sites within the development limits of a defined settlement will be permitted where:
    1. The necessary range of facilities and services, including existing community, social, and educational provisions, and public transport is accessible or can be readily provided;
    2. The proposal will have no significant adverse impacts on the amenity of residents and adjoining land uses;
    3. The site is capable of being serviced with water, electricity, sewage and waste disposal;
    4. There is no adverse effect on its surroundings, landscape/townscape or the setting and integrity of the historic environment.
  2. New, or extensions to existing authorised sites outside the development limits of defined settlements will be permitted in accordance with the above, where it can be demonstrated that there are no suitable pitches available on existing authorised sites, within the development limits of a defined settlement, or that there is no opportunity to appropriately extend those sites.

Proposals for a transit or touring site will be considered where they have good connections to the Strategic Road Network.

11.217 The policy provides the framework and context for the consideration and assessment of proposals for new sites, and extensions to Gypsy and Traveller sites (and for Travelling Show People) reflecting the provisions defined within primary legislation[66].

11.218 The design of any sites will be required to have regard to the provisions of the appropriate Welsh Government Design Guidance[67].

11.219 This guidance will be a material consideration in the determination of any planning applications submitted. In relation to any site being developed by a public body, including the local authority, the provisions of Welsh Government Guidance: Designing Gypsy and Traveller Sites will apply.

11.220 Proposals must give consideration to vehicular access from the public highway; as well as provision for parking, turning and services on site; and road safety for occupants and visitors.

11.221 Landscaping and planting with appropriate trees and shrubs should be used to blend sites into their surroundings, give structure and privacy, and maintain visual amenity. Excessive hard landscaping, high walls, or fences should be avoided as these can lead to a site's isolation from the wider community. In the wake of ash dieback, no ash trees should be introduced.

11.222 Proposals will need to have regard to local infrastructure and demonstrate that the site is able to provide sufficient facilities and access to utilities. The scale of proposals should be proportionate to its surroundings and to the local community. Further guidance should be sought from Welsh Government's Designing Gypsy and Traveller Sites Guidance.

11.223 Applications will be expected to include evidence to demonstrate that the new site or the extension to an existing site is required at that location. Such information should include evidence demonstrating a lack of availability of suitable permanent or transit pitches on existing sites, or an opportunity to extend those sites to meet the required need.

11.224 The 2015 and 2019 Gypsy and Traveller Accommodation Assessments (GTAA) assessed the need for transit sites or emergency stopping places for the Travelling Community who either travel permanently or for part of the year. The assessments sought to analyse records of unauthorised sites and encampments with data from the Traveller Caravan Count was also considered. Analysis of the recorded number of authorised and unauthorised caravans in Carmarthenshire decreased.

11.225 The Welsh Government introduced a new monitoring mechanism to track and identify illegal transit encampments. The AMR for 2021/2022 identified a number of illegal encampments, but none were for transit purposes. Consequently, the data does not indicate any clear pattern as yet which requires intervention through the identification of a transit site. Reference should be had to the monitoring framework of the plan.

11.226 In relation to the needs arising for Travelling Showpeople as indicated through the GTAA, there is at present no spatial correlation with that need which would enable the identification of a suitably located site. The plan seeks to provide the appropriate flexibility to meet that need through the provisions of the above policy and liaison with the community to identify any specific locational need.

Strategic Policy – SP 11: The Visitor Economy

Proposals for tourism and visitor economy related developments will be supported where they:

  1. exhibit high quality design and placemaking principles;
  2. contribute to the protection and enhancement of the natural environment;
  3. add value to our visitor economy;
  4. are sustainably and appropriately located.

11.227 Tourism is a key component of Carmarthenshire's economy. It is a major source of employment and revenue. It generates around £400 million - £500 million of revenue to the County's economy annually.[68]

11.228 The County is home to a wide range of attractions, including Ffos Las Racecourse, the National Botanic Gardens and Pembrey Country Park. Carmarthenshire is the "cycling hub of Wales", with the Cycling Strategy capturing the Council's aspirations to be a national lead in the provision of cycling infrastructure events and development.[69]

11.229 Tourism is a dynamic industry with a wide demographic / customer base. Carmarthenshire is well poised to capitalise on the sector's potential given its location within a UK setting. The tourism offer within Carmarthenshire ranges from those natural features such as rights of way / walking to well-established renowned national attractions. The County's heritage and activity tourism potential is renowned, whilst its outstanding natural environment could appeal to the wellness tourism sector.

11.230 SP11 sets the framework for a policy approach within the Revised LDP that is sufficiently responsive and flexible to market demand up to 2033, whilst also seeking to protect the very communities, landscape and townscape that makes Carmarthenshire a fantastic place to visit and enjoy. Whilst the strategic policy provides the overarching context, specific policies provide detail. This includes clarifying any role that the settlement limits of defined settlements play in informing the determination of proposals.

11.231 In interpreting SP11, it should be noted that tourism related developments includes new, as well as extensions to existing facilities.

11.232 Extensions to existing facilities should be subordinate in scale and function to the existing facility and proposals that constitute substantive extensions should be construed as new development.

Adding Value

11.233 Proposals can add value to the County's visitor economy by contributing to the creation of a diverse, high quality, all year-round destination and accommodation offer. Economic benefits could range from an increase in visitor numbers and visitor days and job creation, which could all contribute to a wider mix of accommodation and attraction types. These support the tourism season beyond the summer months. There are opportunities for proponents to seek to align to and support those emerging corporate priorities, including the Council's cycling aspirations. It is accepted that added value will be commensurate with the scale and nature of the proposal. Proposals that contribute to the development of a wider network of attractions within the County increase the overall offer and stay/spend period, thus offering clear potential to yield added value.

Respecting the County's social, economic and environmental fabric

11.234 All parts of the County possess qualities that contribute to the overall sense of place. These include landscape, nature conservation, social fabric and built environment. These are assets which must be protected for our future generations and cannot be unduly compromised by tourism related development.

11.235 There should also be an emphasis on providing quality in all aspects of a proposal. In considering the acceptability of proposals, consideration will be given to location, siting, design and scale, access to the primary and core highway network and the impact of any resultant traffic generation. Furthermore, the extent to which the site is serviceable by public transport, walking and cycling are important considerations. Proposals should reflect the character and appearance of the area with appropriate landscaping and screening utilised as required.

Sustainably located

11.236 In recognising market demand, tourism related development should be directed to sustainable locations. Regard should be had to the LDP spatial strategy in determining the appropriateness of any location, in addition to the Sustainable Transport Hierarchy for Planning[70]. . The specific policies provide further guidance on the implementation of this spatially driven approach.

11.237 Tourism related proposals should reflect the character of the area and the impacts on the vicinity of the site as part of a place making approach. A recognition of the sense of place within the vicinity of the proposal should be implicit within the context of the cluster based approach which groups the settlement framework. In spatial terms, this would indicate that those larger scale high trip generating tourism proposals lend themselves to being situated in the south of the County where the infrastructure is in place to support them.

11.238 In noting the established primarily coastal offer that characterises the southwest of the County, due regard will need to be given to any landscape impact arising from any potential for an over intensification of uses.

11.239 The County's rural areas are well placed to accommodate proposals for high quality and sustainable proposals that are of an appropriate scale. Proposals should respect the County's assets whilst supporting vibrant rural communities.

11.240 Some tourism related developments, by their very nature, must be located in the countryside. It is important that these developments do not have any significant negative impact on the landscape, natural environment, or amenity. In terms of the detailed policies for the Revised LDP, the emphasis is on providing clarification on the two notable challenges and opportunities facing the visitor economy in Carmarthenshire which are attractions (somewhere to go) and accommodation (somewhere to stay).

VE1: Visitor Attractions and Facilities

  1. Proposals for high quality visitor attractions and facilities, including appropriate extensions to existing facilities will be permitted, where they are located within, or directly related to a defined settlement (Policy SP3).
  2. All other proposals for high quality visitor attractions and facilities not considered under Point 1 above will be permitted, where they are demonstrably reliant on the specific attributes of the site / open countryside location. Proposals should demonstrate that the following sequential approach has been undertaken where the adaptation and re-use of an existing building has been considered in the first instance; then previously developed land; then a greenfield location.

All proposals should reflect and respect the role and function of the area, as well as its sense of place, most notably in terms of scale, type, character, design, layout and appearance.

Where appropriate, proposals should be accessible by various modes of transport - especially sustainable modes of transport - such as walking, cycling and public transport.

11.241 This policy acknowledges the economic opportunities afforded by the tourism sector but also emphasises the importance of maintaining the social, economic and environmental integrity of the County. There should be no social, economic and environmental harm arising from the proposal and satisfactory levels of accessibility must be in place.

11.242 The provision of a range and choice of attractions and facilities can assist in unlocking the County's visitor economy potential, such as, 'Rainy day' attractions that offer particular potential to counter issues of seasonality. Dual use facilities – i.e. attractions that are open to day trippers and the local community, offer potential wider benefits. Proposals that seek to align with a wider network of attractions within the County do provide potential to broaden the overall offer as well as increase the length of stay and amount of monetary spend in Carmarthenshire's visitor economy.

11.243 Proposals that are not located within or directly related to a settlement defined in Policy SP3 should demonstrate that the specific location is essential both in terms of the viability and feasibility of the development. The applicant will need to demonstrate why the specific location is essential and why the proposal is highly dependent on the attributes of the site. This could be done by clarifying how the site / proposal is visually, functionally and spatially connected to a defined feature. This could include natural, historic, or man-made features (e.g. an established facility).

11.244 Proposals that are not located within or directly related to a settlement defined in Policy SP3 should first look at re-using or extending existing buildings. Should there be no existing building to accommodate the new proposal, previously developed land should be considered, followed lastly by greenfield sites.

11.245 Where relevant, the Council will seek the submission of a tourism supporting statement. Such a statement provides a mechanism for the applicant to demonstrate the policy alignment of the proposal. A statement can also provide an applicant with the opportunity to fully demonstrate the economic credentials of the proposal (as commensurate with size/scale etc).

VE2: Holiday Accommodation

  1. Proposals for high quality serviced accommodation, including appropriate extensions to existing accommodation, will be permitted where they are located within, or directly related to a defined settlement (Policy SP3).
  2. Proposals for serviced and self-catering accommodation that are located outside of the above locations will only be permitted where they consist of the re-use and adaptation (including conversion) of existing buildings in conjunction with policy RD4.

All proposals set out above should reflect and respect the role and function and sense of place of the area, most notably in terms of scale, type, character, design, layout and appearance - as well as those uses already located in the vicinity of the site.

11.246 This policy acknowledges the benefits of a diverse accommodation offer in terms of providing a range and choice of places to stay. This policy applies to a variety of different types from large high quality hotels to small bed and breakfast accommodation. Static caravan, chalets and other permanent glamping sites are considered under policy VE4. . This can offer a range of economic benefits, whilst also allowing the County to broaden its offer and appeal to wider demographic / customer bases, and contribute to increased spend

11.247 . Where planning permission is given for permanent holiday accommodation, the Council will consider the attachment of conditions restricting the use to holiday accommodation only. Seasonal occupancy conditions may also be used to prevent the permanent residential occupation of such accommodation. In addition, in areas where the prevalence of second homes and holiday homes are known to be a serious issue within communities, the Council will consider placing restrictions upon permitted development rights to change existing dwellings to holiday homes and second homes.

11.248 For the use of rural buildings for tourism purposes, buildings that are of a substandard quality and / or incongruous appearance will not generally be considered appropriate for conversion to holiday accommodation. In this regard, proposals for buildings of a modern construction such as portal framed units or temporary structures will not generally be considered appropriate for conversion to holiday accommodation. Reference should also be made to Policy RD4: Conversion and Re-use of Rural Buildings for Non-Residential use.

11.249 Where relevant, the Council will seek the submission of a tourism supporting statement. Such a statement provides a mechanism for the applicant to demonstrate the policy alignment of the proposal.

11.250 Reference is made to Policy RD3: Farm Diversification which provides the policy framework for farm diversification projects that seek to positively contribute to, and strengthen the rural economy.

VE3: Touring Caravan, Camping and Non - Permanent Alternative Camping Accommodation

Proposals for new sites, and for extensions, improvements or the intensification of existing sites, will be permitted where they reflect and respect the role and function and sense of place of the area, as well as the following:

  1. they are of high quality in terms of design, layout and appearance, and will not have an unacceptable adverse effect upon the surrounding landscape, seascape and/or townscape;
  2. they will not result in an excessive area of hard standing, and the accommodation units can easily be removed from the site;
  3. they will not result in an over concentration of sites within the area;
  4. they are suitably located in relation to the main highway network and adequate access can be provided without detriment to the natural and built environment;
  5. the accommodation is used for touring purposes only, with occupation limited to holiday use.

Proposals which include a need for ancillary structures should demonstrate that a sequential approach has been considered, commencing with the re-use of existing buildings, followed by the need to construct new buildings.

New buildings will only be permitted where they are appropriate in terms of their siting, need and scale.

11.251 This policy recognises that appropriate high-quality proposals should be supported. This recognises the need to provide a diverse accommodation offer in terms of providing a range and choice of places to stay within the County.

11.252 In responding to emerging trends within the sector, this policy allows for the consideration of alternative luxury camping or glamping accommodation units. These may not present as traditional tents and are also unlikely to fit into the statutory definition of a caravan. For such a unit to be considered as non-permanent, it should have a limited physical anchoring / connection to the ground and should be transient and low impact. The unit should be easily removable from the site. The use of concrete bases is not considered appropriate, whilst any timber platforms or decking should be capable of being easily removed from the site.

11.253 The Council will consider the use of conditions – including restricting the use to holiday accommodation only, or to limit the operational period of the site. There is an expectation that the site can be restored its original state and that any accommodation units are removed from the site when it is closed.

11.254 Whilst the non-permanent nature of proposals considered under this policy mean that they are likely to have less of an impact on the landscape and environment than static units, they must still sit satisfactorily within the landscape and/or townscape. The Council will need to be satisfied that there is no adverse impact, particularly from a landscape capacity point of view. There should be an emphasis on well screened proposals where units can be readily assimilated into the landscape without the need for excessive man-made features such as hard-standing and fencing. Due regard should be given to LDP policies SP12: Placemaking and Sustainable Places and PSD1: Sustainable and High Quality Design.

11.255 Where relevant, the Council will seek the submission of a tourism supporting statement. Such a statement provides a mechanism for the applicant to demonstrate the policy alignment of the proposal. Within the context of this policy, it is likely that the Council will seek a landscaping scheme to allow for an appraisal of setting, site layout, and screening. It will also allow the applicant to elaborate upon the economic benefits of the proposal (as commensurate with size/scale etc).

VE4: Static Caravan and Chalet Sites and Permanent Alternative Camping Accommodation.

  1. Proposals for new Static Caravan and Chalet Sites will be permitted where:
    1. they are within or directly related to a defined settlement (Policy SP3), or, they are located or demonstrate a spatial and functional relationship with a relevant existing tourism facility or attraction;
    2. they are of high quality in terms of design, layout and appearance, and will not have an unacceptable adverse effect upon the surrounding landscape and/or townscape;
    3. they will not lead to a significant and unacceptable intensification in the provision of sites in the locality;
  2. Proposals for the enhancement and extension of existing sites will be permitted where:
    1. it will increase the vitality, sustainability and environmental quality of the site;
    2. it will not result in an unacceptable increase in the density of units and/or the overall scale of the site.
    3. it will not have an unacceptable harm on the surrounding landscape, seascape and / or townscape;
    4. it provides (where appropriate) for the significant improvement of the overall quality, appearance and setting of the site.

11.256 This policy recognises that appropriate high-quality proposals should be supported. This recognises the need to provide a diverse accommodation offer in terms of providing a range and choice of places to stay within the County.

11.257 The Council will consider the application of conditions – including restricting the use to holiday accommodation only and / or to limit the operational period of the site.

11.258 Where appropriate, the Council will require site operators to maintain an up-to-date register of the names of all owner/occupiers of static units and their main home address in order to ensure that the holiday units do not become the owner/occupier's main place of residence.

11.259 The underpinning design principle for static visitor accommodation should be high quality – notably in terms of layout and appearance. Proposals should be sited in unobtrusive locations which are suitably screened by existing landscape features and/or where the units can be readily assimilated into the landscape in a way which does not significantly harm the visual quality of the landscape, seascape or townscape. Due regard should be given to LDP policies SP12: Placemaking and Sustainable Places and PSD1:Enabling Design.

11.260 The demonstration of a spatial and functional relationship with a relevant existing tourism facility or attraction should be proportionate to the size and nature of the proposal. It is considered that proposals for static holiday accommodation that are of a sporadic and unrelated nature are highly unlikely to be able to demonstrate the required relationship.

11.261 Many existing static units are located in visually sensitive areas, particularly along Carmarthenshire's coastline. The policy seeks to promote improvements and upgrade the standard of visitor accommodation on existing sites, and to reduce the impact of these sites on the landscape / seascape. Such proposals should satisfy the policies and provisions of the Plan as a whole.

11.262 The policy seeks to reflect the Well-being of Future Generations Act 2015 in that it recognises the risks posed by flood risk and /or erosion emerging from coastal change. To this end, reference should be made to LDP policy NE7: Coastal Change Management Area in terms of the potential relocation of a static caravan(s), chalet(s) or permanent other visitor accommodation unit(s).

11.263 Where relevant, the Council will seek the submission of a tourism supporting statement. Such a statement provides a mechanism for the applicant to demonstrate the policy alignment of the proposal. Within the context of this policy, it is likely that the Council will seek a landscaping scheme to allow for an appraisal of setting, site layout, and screening, as well as an improvement plan for extensions. Issues of landscape capacity are also noted. The statement should also allow the opportunity for the applicant to elaborate upon the economic benefits of the proposal (as commensurate with size/scale).

11.264 For the purposes of this policy permanent alternative camping accommodation are units that because of their degree of physical attachment to the ground and due to the nature of their design cannot be removed from site when not in use.

Strategic Policy – SP 12: Placemaking and Sustainable Places

To facilitate sustainable development, new development must acknowledge local distinctiveness and sense of place, and be resilient to climate change and deliver net benefits for biodiversity.

To achieve this, all development shall:

  1. Contribute towards the creation of attractive, cohesive, safe places and public spaces, which enhance the health and well-being or quality of life of residents and communities, including safeguarding amenity, landscaping, the public realm and the provision of open space and recreation;
  2. The design, layout, and orientation of proposed building(s), and the spaces between and around them, should create an attractive, legible, healthy, accessible, and safe environment;
  3. Retain and enhance the network of multifunctional GBI and the area's biodiversity including incorporating new opportunities to provide net benefits for biodiversity, and improve ecological connectivity and resilience (including the incorporation of local features);
  4. Be adaptable to climate change and maximise opportunities for sustainable construction techniques, resource efficiency and contribute towards reducing carbon emissions and maximising opportunities for renewable energy generation.
  5. Utilise materials and resources appropriate to the area within which it is located;
  6. Exhibit and demonstrate a clear understanding of the existing local landscape context, natural and built heritage, local character, and sense of place;
  7. Contribute to, or create opportunities for Active Travel and access to public transport;
  8. Consider and where appropriate incorporate new, and/or enhance existing connections to essential social infrastructure and community facilities;
  9. Be accessible and integrated allowing permeability and ease of movement which promotes the interests of pedestrians, cyclists and public transport which ensures ease of access for all;
  10. Have regard to the generation, treatment, and disposal of waste; and
  11. Manage water sustainably, including incorporating sustainable urban drainage systems (SuDS).

11.265 Planning Policy Wales (PPW) sets out the land use planning policies of the Welsh Government (WG). Its central objective is to promote and provide a framework for sustainable development within Wales.

11.266 A key component of this national policy agenda, and the sustainable development objectives which underpin it, relates to the need to embrace placemaking as part of the plan making and decision-making process. National planning policy identifies Sustainable Places as the goal of the land use planning system within Wales. PPW states that; Sustainable Places are the output of the planning system rather than the process of achieving them. All development decisions, either through development plans policy choices or individual development management decisions should seek to contribute towards the making of sustainable places and improved well-being [71].

11.267 The WG is committed to promoting more sustainable forms of development, and their sustainable development scheme, One Wales: One Planet [72], sets out their approach to sustainable development. Through the planning system in Wales, good design can be used to play a major role in delivering sustainable forms of development. The Revised LDP is committed to taking forward the sustainable placemaking agenda through its policies recognising the role new developments can have in potentially contributing towards the making of places and enhancing the area's qualities. The approach seeks to accord with the Well-being of Future Generations (Wales) Act 2015 promoting social inclusion, equality of opportunity and access for all as well as the health and well-being of our communities.

11.268 Achieving good design and creating an effective sense of place requires an understanding of the relationship between all elements of the natural and built environment. Design is a fundamental component in creating sustainable development, which is itself at the forefront of the Well-being of Future Generations Act 2015.

11.269 The Act means that public bodies such as local authorities must work to ensure that developments should acknowledge and seek to improve the economic, social, environmental, and cultural well-being of an area.

11.270 The policy integrates key elements of sustainable placemaking which contribute to the delivery of the Plan's Vision of creating prosperous, cohesive, and sustainable communities. It also recognises the role that the County's unique environmental and historic and cultural qualities play in defining a healthy, safe, and prosperous environment. The role of the Green and Blue Infrastructure (GBI) and its network of multifunctional open spaces is an important component as is its provisions for health and well-being and enhanced opportunities for Active Travel. The multifunctional nature of GBI is recognised and includes landscape, heritage, amenity, health and well-being, sustainable management of natural resources, along with climate adaptation and resilience.

11.271 There are environmental, social, as well as economic benefits to creating a well-designed development. A well-designed and sustainable environment is an essential ingredient to achieving economic prosperity as it will be more attractive to potential investors as well as being more appealing to customers, key workers and tourists. Similarly, better designed buildings and places for work will result in more productive employees. At the same time, well-designed neighbourhoods will create happier and healthier communities that will be more committed to the maintenance of their surroundings. The environmental benefits might include less pollution through the reduction in traffic, the protection or enhancement of biodiversity, and the conservation of the built heritage. All these benefits are central to achieving sustainable development and to the long-term economic prosperity of an area.

11.272 This policy is intended to ensure that development proposals can achieve positive economic, social, environmental, and cultural outcomes, and can minimise adverse ones. It will, along with the more detailed policies to be developed in the Deposit LDP, form the basis of all planning decisions, and indicators will be developed as part of the Plan's monitoring framework to show the effectiveness of the policies. Further SPG will be prepared to supplement Policy SP12.

11.273 The Flood and Water Management Act 2010 (Schedule 3) [73] establishes Sustainable Drainage Approval Body (SABs) and requires new developments to include Sustainable Drainage Systems (SuDS) features that comply with national standards.

11.274 Whilst the SuDS consenting process forms part of a separate regulatory regime to planning, this Plan recognises the importance of the consideration of SuDS forming part of the design concept from the outset as part of a placemaking approach. In this regard, this Plan recognises that SuDS can be used effectively in both rural and urban areas to support new development and redevelopment, whilst reducing the risk of surface water flooding and creating opportunities for improved water quality, bio-diverse rich habitats, and new community recreational spaces.

11.275 Developers are advised to contact with the Council's SAB at a timely stage to clarify and scope requirements. [74]

PSD1: Effective Design Solutions: Sustainability and Placemaking

Development proposals shall demonstrate effective delivery of site-specific design and sustainability objectives. Development shall deliver quality design solutions which are appropriate to the specific site, local area, and nature of development.

Proposals shall clearly demonstrate:

  1. That the development reflects local context through consideration of landscape; built environment; and historic and cultural characteristics, including the:
    1. layout and landscape design scheme;
    2. form, scale, dimensions, materials and detailing of all built elements and surfaces.

    To ensure that development proposals retain a connection to, and complement, the local 'sense of place'.

  2. High-quality design solutions which deliver:
    1. built form which effectively integrates sustainable building design principles to maximise opportunities for carbon reduction, energy efficiency and flexibility in use.
    2. efficient use of site area, whilst maximising the retention, protection and integration of existing landscape and ecological elements and features, as Green and Blue Infrastructure assets.
    3. effective, safe, and inclusive site layout which promotes the health, well-being and amenity of residents, users, and visitors.
    4. positive contribution to an effective and attractive public realm through the integration of built form with adequate and clearly defined private and public amenity space
  3. That the development will not result in significant adverse impacts to the amenity of adjacent land uses, properties, residents, or the community; and that any potential adverse impacts have been avoided, minimised, and mitigated.
  4. Quality landscapes design solutions which:
    1. maximise opportunities for; enhancement to the quality and extent of existing; and the creation of new, landscape and ecological elements and features, as Green and Blue Infrastructure assets.
    2. enhance visual amenity and landscape character to establish a clear and legible sense of place and contribute to an attractive public realm
    3. minimise, and mitigate against potential adverse landscape and visual impacts.
  5. Effective design solutions which take account of existing ground conditions and utilise existing site topography to address ground stability; minimise excavation and filling; optimise delivery of Policy PSD5 (Development and the Circular Economy); and minimise landscape and visual impacts.
  6. That the development delivers or contributes to:
    1. safe and efficient connections to existing access networks including Active Travel and the public transport network;
    2. appropriate access routes and surfaces which promote effective accessibility for all and ease of movement into and through the site;
    3. provision of appropriate onsite highway standards including parking and servicing.
  7. That the development delivers sustainable and resilient measures for the treatment and disposal of surface and foul water; which are fully integrated into the site layout and maximise opportunities for the provision of additional value through functions which deliver landscape, ecological and green and blue infrastructure policy objectives.
  8. That design solutions are deliverable for the lifetime of the proposed development through effective maintenance and management proposals
  9. It includes, where applicable, provision for the appropriate management and eradication of invasive species.

11.276 This plan and the policy seeks to ensure development proposals exhibit high quality and sustainable design principles which are reflective of the local context. High quality design sits at the heart of our ambitions for the creation of prosperous, cohesive, and sustainable communities. An important part of this is putting in place a design-led regeneration approach which provides for high quality developments and designs in a way which recognises local distinctiveness, and the relationship between the existing built form and new developments.

11.277 The Plan seeks to reflect the provisions of national policy and the embedding of sustainable development within the plan recognising that new homes and developments should be provided in a way which is consistent with sustainability principles. Matters such as the layout, scale, form, massing, height, density, materials, and specific detailing (including the colour pallet) are important components. However, it is recognised that these cannot be prescriptive and will vary across development and the Plan area.

11.278 Creating good design should not be limited solely to the physical appearance of buildings and specific structural details alone will not create a successful place. Rather, the potential mix of uses within a development and/or buildings, spaces (including important vistas and gaps) and the wider community relate to one another are of equal importance if the development is to deliver the sense of place desired.

11.279 This policy in conjunction with SP12: Placemaking and Sustainable Places, PSD3: Green and Blue Infrastructure Network and PSD2: Masterplanning Principles – Creating Sustainable Neighbourhoods together with other plan policies set an overarching framework for high design quality in development, conservation, and enhancement proposals within the County.

11.280 The County's historic buildings, townscape and landscape should be treated as an asset and positively conserved and enhanced for the benefit of residents and visitors alike. Further guidance on the development and preservation of historic and cultural identities can be found within Strategic Policy SP14.

11.281 Proposals should reflect the need to protect the qualities of the area and the amenity of those who visit, work, and/or live within the area. The siting and nature of uses should be considered in the light of their potential to cause an unacceptable nuisance. Considerations of amenity can relate to all forms of development across the County. Consequently, the policy seeks to respect, and where appropriate, protect the amenity of existing residents.

11.282 The siting, layout and detailed design of development will often be critically important to the success of efforts to provide genuine alternatives to car travel. Good site locations and well-designed developments can increase the sites legibility and access to pedestrian, cycling and public transport routes thus reducing the amount of car traffic and speeds. This Plan, and other strategies ensure that new developments achieve social, economic, and environmental sustainability, creating cohesive and socially inclusive places which reinforce local identity.

11.283 Poor quality design can not only undermine the character, qualities, and appearance of an area, but can also impact on the amenity of existing residents and their quality of life. Design solutions should consider such impacts in relation to: visual impact, loss of light, overlooking/privacy, disturbance and the likely implications of traffic movements or operational considerations.

11.284 Proposals should also consider the quality of life of potential occupants of the development. The size of living spaces is also considered important in maintaining an appropriate living standard including providing for healthy and attractive environments to live. It should be noted that such considerations will apply to conversions where there is a potential for an over intensification of use giving rise to cramped living conditions.

11.285 Design and Access Statement (DAS) should, where appropriate, be submitted to accompany planning applications. The DAS should include the detail necessary to ensure the application and the design considerations of any development are fully expressed having regard to policy provisions and their context.

11.286 Proposals for developments of over 50 homes will be required to have regard to the provisions of Policy PSD2: Masterplanning Principles – Creating Sustainable Neighbourhoods. The policy will be further expanded upon by SPG including specific guidance on Placemaking and Design Principles. Green and Blue Infrastructure and its network of multifunctional open spaces will be an integral part of any effective design solution. Consequently, proposals will be expected to have appropriate regard to Policy PSD3: Green and Blue Infrastructure Network.

11.287 Natural surveillance is an important consideration in ensuring safer places and more inclusive developments and communities.

11.288 The Plan recognises that unstable land can occur for several reasons, albeit they often fall within the following categories:

  1. The effects of underground cavities – whether of natural origin or due to mining or civil engineering works;
  2. Unstable slopes – these may be natural (e.g. eroding coastlines) or man-made (such as quarries, cuttings, or embankments) or,
  3. Ground compression – this may be of natural origin due to peat, alluvial, estuarine, or marine soils; or due to human activities e.g., made ground, landfill or restored opencast mines; and ground subject to movement due to shrinking and swelling clays.

11.289 In those areas where land instability is known, development proposals must be accompanied by a scoping report, which will identify the nature of the (potential) instability. The report should be sufficiently detailed for the local authority and any other statutory agency to ascertain whether:

  1. there is no potential threat for a development to go ahead;
  2. instability problems cannot be overcome; or
  3. measures could be implemented to overcome identified problems. A detailed stability report will be required to accompany the application which:
    1. Is produced by a "competent person", most appropriately a geotechnical specialist able to demonstrate relevant specialist experience in the assessment and evaluation of instability; and
    2. Identifies the measures required to mitigate against the identified risk(s).

11.290 It is important that proposals are designed for the lifetime of the development. Proposals should identify maintenance responsibility, and the funding arrangements for maintenance for the lifetime of the proposed development.

PSD2: Masterplanning Principles – Creating Sustainable Neighbourhoods

For proposals where the development is for 50 homes or more, there will be a requirement to submit a comprehensive and integrated 'masterplan' for the entire site demonstrating a coherent and coordinated approach to creating neighbourhoods in accordance with placemaking and good design principles. Where appropriate, consideration shall be given to the following guiding principles

  1. A breakdown of densities across the site reflecting the physical characteristics of the site and the character and appearance of the surrounding community. Higher density developments will be expected to relate directly to public transport corridors and reflect the settlement's position within the settlement framework (Strategic Policy SP3);
  2. How they will contribute to the delivery of sustainable transport choices including active travel and accessibility to public transport;
  3. How the proposal integrates and links effectively into the surrounding community including links within and through the site for sustainable transport choices. Proposals should seek to establish good legibility and connectivity both within the site and linking to the wider area;
  4. The provision of facilities to meet the social and community needs of the development and where appropriate the wider community;
  5. Include responsive solutions reflecting the local context and the opportunities for sustainable construction techniques;
  6. Integration of the Green and Blue Infrastructure network, and open spaces to provide a cohesive and integrated environment for people and biodiversity, and enhance provision for recreation and other amenities;
  7. Sympathetic integration of landscape form, biodiversity and built and historic features within and surrounding the site into the development. Proposals will be expected to look outwards beyond the site boundary (and not just within the site) in delivering high quality sustainable neighbourhoods;
  8. A phasing plan for the delivery of the development along with timely provision of supporting infrastructure;
  9. Reflect the linguistic and cultural identity of the County and contribute towards safeguarding and promoting the Welsh language;
  10. Include innovative and creative solutions in relation to resource efficiency such as district heating networks, low carbon development and renewable energy generation;
  11. Integrate site features arising from SuDS as part of the development and consider the additional value or functions which these may provide;
  12. Where significant wildlife interests are associated with the site, it has to be ensured that Green and Blue Infrastructure provides a resilient network, which adequately protects and enhances the respective wildlife interests.

11.291 The policy sets out a masterplanning as a requirement for developments in delivering a holistic placemaking approach for all allocated and windfall sites of 50 or more homes. A masterplan for all sites allocated for 50 homes or more will need to be agreed prior to granting planning permission relating to these sites.

11.292 The policy recognises the benefits that can arise from effective masterplanning not only in terms of the quality of environment and sense of place it can create, but also as an opportunity to integrate all the relevant developmental considerations and requirements into a single expression of the proposals form.

11.293 Proposals should express in a clear and coherent way how factors such as the new, or enhancement of existing infrastructure can add value to current and future residents. This will help form and guide future provision. Such an approach will provide greater certainty and integrate opportunities for a connected living, legible streets, a sequence of open spaces and Green and Blue Infrastructure and developments that fit their surroundings.

11.294 Masterplanning proposals should consider and plan for the effective and integrated phasing of the development considering different tenure mixes and the suitable provision of facilities at appropriate stages in a site's development. This will ensure a development is comprehensively planned with cohesive and sustainable communities at their heart. Where feasible, existing/retained vegetation should be protected throughout the construction period. Where new habitat is being created, the timeline involved for the habitat to become functional should be considered.

11.295 The masterplan should be considered at outline planning application stage with its parameters and content agreed, to which a future reserved matters applications should accord.

PSD3: Green and Blue Infrastructure Network

Development proposals shall demonstrate effective Green and Blue Infrastructure (GBI) design solutions which:

  1. Maximise retention, protection, and integration of existing GBI assets and prioritise those of highest value, quality, and condition within and on the development site boundaries;
  2. Deliver overall enhancement to the value, quality, and condition; and extent, diversity, and connectivity of the GBI network within and on the development site boundaries;
  3. Deliver effective integration and maximise connectivity with existing GBI assets adjacent to the development site boundaries and with the wider GBI network;
  4. Maximise opportunities to achieve multi-functionality by integrating GBI functions to deliver combined objectives which benefit Biodiversity, Climate Change and Sustainability, Health and Wellbeing, Sense of Place, and Economy; and,
  5. Include long-term management and maintenance proposals to ensure that effective GBI design solutions are deliverable for the lifetime of the proposed development.

Planning applications will require submission of surveys and assessments appropriate to the site and nature of development, to establish a baseline for GBI design solutions.

All planning applications for major developments will be required to submit a Green Infrastructure Statement to demonstrate how GBI design solutions have been considered and accommodated as part of the proposed development.

11.296 This policy aims to ensure that GBI assets are valued, protected, enhanced, and managed through the GBI network. At the landscape scale, GBI assets can comprise entire ecosystems such as wetlands, woodlands, heathlands, and waterways. At a local scale, it might comprise of parks, fields, footpaths, Public Rights of Way, cycle ways, common land, open access land, canals, public growing spaces, allotments, cemeteries, landscaped areas, and gardens. At smaller scales, individual urban interventions such as street trees, roadside verges, and green roofs can all contribute to green and blue infrastructure networks.

11.297 Planning applications will require submission of surveys and assessments appropriate to the site and nature of development, to enable evaluation of the location, quality, and condition of all existing GBI assets on, and adjacent to the site boundary. This information may include Tree or Arboricultural Surveys, Preliminary Ecological Appraisals (PEAs) and protected species surveys. GBI design solutions must:

  1. Identify all potential adverse impacts to existing GBI assets on and adjacent to the site, and demonstrate how impacts will be avoided, minimised, and mitigated as far as possible (in accordance with the mitigation hierarchy) through specific design and protection measures;
  2. Identify unavoidable impacts to existing GBI assets on, and adjacent to the site and demonstrate how the impacts have been mitigated, or compensated for within the proposed development layout and through landscape and ecological design schemes; and
  3. Maximise opportunities to enhance the quality and extent of existing GBI assets, and enable the creation of new GBI assets, to enhance the connectivity and multi-functionality of the GBI network.

11.298 Planning applications for major developments must include a Green Infrastructure Statement which demonstrates how GBI design solutions have been considered and accommodated for as part of the proposed development. The Green Infrastructure Statement must meet the specified requirements set out for GBI design solutions outlined in the immediately aforementioned paragraph (i,ii,iii).

11.299 When appropriately planned, designed, and managed, GBI has the potential to deliver a wide range of public goods and benefits for people, biodiversity, climate, and the wider environment. By considering the multiple functions that natural assets can provide simultaneously, it can significantly reduce costs for individuals, businesses, and public bodies, whilst enhancing the quality of life and health of residents, workers, and visitors to Carmarthenshire.

11.300 These functions that GBI can provide are broadly contained under the following themes:

A diagram illustrating the components of green and blue infrastructure as being: Biodiversity; Climate Change and Sustainability; Health and Well-being; Sense of Place; Economy.

Figure 11: Green & Blue Infrastructure

Biodiversity: GBI can improve connectivity between existing areas of nature, reducing habitat fragmentation and loss and increasing ecological resilience. Development proposals will conserve and enhance on-site biodiversity, and habitat networks within and adjacent to the site. There will be a need for any application to detail how the development will deliver such conservation and enhancement. This will include identifying ways to minimise or reverse the fragmentation of habitats, and to improve habitat connectivity through the promotion of wildlife corridors and identifying opportunities for land rehabilitation, landscape management and the creation of new or improved habitats.

Sense of place: Incorporating GBI features into new development is an important component of the WG placemaking approach and can contribute to the unique sense of place of an area or settlement. Retaining existing features into proposals helps to create places that are distinct and can help to soften the impact of change by creating a sense of continuity that acknowledges local identity. GBI is integral to place-making and therefore must be part of the development design process from the outset, rather than being relegated to 'left over' land.

Climate Change: GBI can play a vital part in efforts to combat, mitigate and adapt to climate change, and will play an increasingly important role in climate-proofing both urban and rural areas. Increasing the green cover of our towns and cities can provide several benefits towards tackling climate change. These include carbon sequestration and storage, heat amelioration and reduction of flood risk as well as mitigating climate change induced reductions in air and water quality. Development proposals shall maximise these benefits, with prioritisation of benefits to be considered in the following areas:

  1. Within areas considered to be at risk of flooding from any source, the provision of capacity for water storage in the event of a flood;
  2. Within Principal Centres, the provision of relief from high temperatures through increased canopy cover and efficient use of surfaces to maximise the provision of GBI including through green roofs and green walls;
  3. Within areas of poor average resident health, the provision of opportunities for physical activity; and/or
  4. Within AQMZs, the provision of removal of air pollutants through suitable tree and foliage planting.

Development proposals will also integrate naturalised SuDS into the design of GBI, and should, as far as possible, ensure that SuDS provision is multifunctional.

Health and Well-being: Green and blue infrastructure can be an effective means of enhancing health and well‑being, through linking dwellings, workplaces and community facilities and providing high quality, accessible green spaces. Development should seek to maximise the benefits, and where appropriate public use, of green and blue infrastructure, with emphasis on promoting healthier communities. Development proposals will meet local accessibility, quality, and quantity standards for open space, and be designed to cater for the needs of the community. Development proposals will maintain and enhance the quality and connectivity of access networks, integrating active travel routes (linking workplaces, schools, community facilities and public transport hubs) and recreation routes into green and blue infrastructure.

Economy: Protecting and investing in GI can support economic success and sustainable growth. GI can attract inward investment, making a local area more attractive to businesses and visitors. It can also provide developers with cost-savings as GBI assets have the potential to satisfy several requirements in a multifunctional solution (e.g., open space provision and SuDS). To this end development should seek to identify and maximise the quality, use and multifunctionality of green and blue infrastructure provision on site.

11.301 Consequently further guidance on GBI as part of development will be prepared as SPG in support of the placemaking agenda and the promotion of biodiverse living environments.

PSD4: Green and Blue Infrastructure – Trees, Woodlands and Hedgerows

Proposals for development shall:

  1. Maximise retention, protection, and integration of existing trees, woodlands and hedgerows and prioritise those of highest value, quality, and condition within and on the development site boundaries through iterative site layout design which avoids potential impacts;
  2. Minimise potential impacts to retained trees, woodlands and hedgerows through site specific design, method statements and protection measures.
  3. Provide appropriate compensation planting for unavoidable loss of trees, woodlands, and hedgerows to deliver overall enhancement to extent and cover. Opportunities for translocation of existing hedgerows should be considered where feasible;
  4. Provide sufficient space and rooting volume within site layout and in relation to adjacent land uses to enable effective growth of existing and newly planted trees, woodlands, and hedgerows to maturity and to avoid potential challenges to retention for the lifetime of the development;
  5. Identify and deliver management works to improve the value, quality and condition of existing trees, woodlands, and hedgerows within and on the development site boundaries; and
  6. Deliver additional planting of trees, woodlands, and hedgerows appropriate to the site and development type that will deliver both long term landscape benefits and net benefits for biodiversity.

11.302 The policy recognises the important contribution trees, woodlands and hedgerows can have to the environment and to our communities. Trees and woodlands play an important role within the plan area and are intrinsic to the landscape and urban character whilst providing habitat and increasing climate change resilience. Well-designed tree, woodland and hedgerow planting can help address both the Climate and Nature Emergencies, as declared by Welsh Government and the Council.

11.303 Their contribution within the urban form is particularly recognised. They can help tackle air pollutants, flooding, and noise pollution, and provide numerous other benefits including the provision of shade and visual amenity. They also provide extensive areas of habitat for wildlife, especially mature trees. Carmarthenshire's GBI network reflects tier importance in the urban realm and within our towns and villages - in both public and private spaces, along linear routes, and waterways, and in amenity areas.

11.304 We consider their retention and additional new planting to be an important part in creating a cohesive and healthy communities within a valued and biodiverse rural and landscape context. All planning applications should be accompanied by a tree survey where trees are present on site. This should include protection, mitigation, and management measures. Appropriate long-term and short-term management measures must be implemented to protect newly planted and existing trees, woodlands, and/or hedgerows. Reference may be made to Policy CCH7.

11.305 The policy reflects the links through quality placemaking and Green and Blue Infrastructure. Consequently, further guidance on Trees and planting as part of new developments will be prepared as SPG in support of the placemaking agenda and the creation of high quality and biodiverse living environments.

11.306 New trees planted should be of a species native to, and of a maturity respective to the site to the Council's satisfaction. In regards the reference in the policy to unavoidable loss, the Council will expect the applicant to make every reasonable effort to retain existing features, and as such their retention should (where appropriate) be considered integral to the design of the proposed development site from the outset.

PSD5: Development and the Circular Economy

Development proposals will be required to demonstrate, via the submission of a natural materials management plan, how the generation of waste has been minimised and any waste generated managed in order to keep resources in use for as long as possible in:

  1. the layout and design of the development;
  2. any demolition and construction phase;
  3. respect of any opportunities for utilising waste for re-use and recycling;
  4. respect of any opportunities for utilising residual waste as a source of fuel.

11.307 A key element within PPW Ed11 is the move towards embracing a more circular economy in Wales. A circular economy is one which aims to keep materials, products and components in use for as long as possible. There are environmental, social and economic benefits of taking such an approach, most notably the increased value and productivity of materials, financial savings for the construction sector and the prevention of waste.

11.308 In order to facilitate the requirements of this policy, development proposals will need to be accompanied by a natural materials management plan. The Plan should identify all the natural materials on the site prior to the development, these may be existing buildings to be demolished or the natural ground to be disturbed. It should explain how the generation of waste from these materials will be minimised and that the design and layout has fully considered the need to ensure that a cut and fill balance is as close to neutral as possible.

11.309 Development proposals will be encouraged to incorporate design features and materials which enable flexibility and adaptability throughout the design life of a building, and which will enable re-use of the materials upon deconstruction.

11.310 Where appropriate, the use of locally sourced, alternative, or recycled materials will be encouraged, including the reuse and recycling of secondary aggregates, construction, demolition and excavation waste, incinerator bottom ash and other appropriate recycled materials.

11.311 Construction sites inevitably require a degree of cut and fill engineering operations. As part of site treatment, the cut and fill balance of materials excavated should be assessed so as to avoid the creation of waste which cannot be effectively re-used due to lack of suitable storage facilities. As part of the natural resources management plan developers should design proposals to achieve an earthwork balance which seeks to minimise cut and fill or which may provide for remediation of land elsewhere in the area.

11.312 The Planning Authority will encourage innovative approaches to recycling, particularly those which bring multiple benefits such as reducing energy costs and associated emissions. This may include the practice of on‑site recycling on minerals sites and the recycling of construction and demolition waste in conjunction with other suitable uses, such as within builder's merchant yards.

11.313 In circumstances where reuse or recycling of the waste is not possible, the applicant will need to provide evidence to show where the residual waste will be disposed. Options that will be encouraged include the potential for utilising the waste as a source of fuel, such as in high efficiency energy recovery from waste, possibly linked to district heating systems.

PSD6: Community Facilities

Proposals for new and improved community facilities, including health and education facilities will be supported where it accords with the following:

  1. It would be readily accessible to the local community it is intended to serve by public transport, walking and cycling;
  2. It is within, or is directly related to a settlement identified in Policy SP3: Sustainable Distribution;
  3. It would not unduly harm the amenities nearby residential properties;
  4. It would not detract from the character and appearance of the area;
  5. It will not lead to unacceptable parking or traffic problems;
  6. It is designed with appropriate flexibility and adaptability to accommodate additional community uses without compromising its primary intended use.

11.314 Providing a range of community facilities that are accessible to as many people as possible is fundamental in terms of securing sustainable communities. Such facilities are valuable not only in terms of the amenity they provide but are also important in generating employment and attracting people to live within an area. Community facilities contribute significantly to the well-being, quality of life, enjoyment and inclusivity of settlements and communities within the County. In this regard, their potential loss should be carefully considered given consequential impacts in terms of sustainability and community identity. The protection and retention of community facilities should, wherever feasible, be considered and responsive approaches adopted to assist in their retention.

11.315 The above policy also recognises the potential for development where it occurs to place a strain on existing facilities. Consequently, the adequacy of existing facilities such as healthcare is an important consideration. As a result, the policy seeks to ensure that adequate facilities are provided to meet the future demands of local communities.

11.316 The policy seeks to encourage the potential for dual use of facilities, particularly where the additional activity would assist in broadening service delivery and enhancing viability and usage. Establishing the viability of a facility, within the context of changing demographic characteristics, condition and maintenance and shifting patterns of demand may mean that some facilities no longer meet requirements. In such circumstances, alternative forms of provision and usage may be appropriate. Such a determination should be informed, where appropriate, by local evidence, the facility/service provider, and the local community.

11.317 The promotion of accessibility to formal and informal recreation and leisure is an important consideration for the LDP. Sports fields, allotments, parks, and wider natural based amenities such as waterways and woodlands provide opportunities for potential health benefits and add to a community's sense of place, as well as integrating green and blue infrastructure into the urban form. Support will also be given to the provision of accessible public toilets.

11.318 They also have potential to mitigate against the causes and effects of climate change and can provide arenas for social interaction and community cohesion. Reference should be made to policy PSD7 in respect of Recreation and Open Space.

11.319 The relationship between the access to healthcare facilities and new development is recognised and reference should be had to Policy INF2: Healthy Communities.

11.320 The provision of community facilities will be supported where they accord with Strategic Policy SP3: Sustainable Distribution Settlement Framework. The siting of proposals for the provision of new educational and health facilities will be supported on sites within and directly related to the limits of defined settlements where they are in accordance with the strategy and policies of this LDP.

11.321 The Council may seek developer contributions through planning obligations to mitigate the impacts of particular developments, and to facilitate the delivery of the Plan polices and proposals.

PSD7: Protection of Open Space

Provision will be made to protect and, wherever possible, enhance accessibility to open space.

Proposals which result in the loss of existing open space will only be permitted where:

  1. It is demonstrated that there is provision of at least equivalent value available within the settlement, or appropriately accessible location; and,
  2. It would not cause or exacerbate a deficiency of open space; or,
  3. The re-development of a small part of the site would allow for the retention and improvement of the majority of the facility; or,
  4. A satisfactory financial contribution towards compensatory provision is provided as an acceptable alternative facility.

11.322 Definitions of open space and a clarification of the County's accessibility standards are provided within the Carmarthenshire Open Space Assessment with additional information also provided in the Carmarthenshire Green Infrastructure Assessment. For the purposes of this Plan, open space is defined as areas including playing fields, equipped children's play areas, outdoor sports facilities, informal recreation, and amenity or play space (i.e., natural green space, play space and public open space).

11.323 The identified open space provision in the County is mapped and assessed within the Carmarthenshire Open Space Assessment. It should however be noted that there may be additional areas of open space which are not reflected in the Assessment which make a valuable contribution towards the provision of open space within the community. Whilst these areas are not mapped as part of the LDP, they would nevertheless be afforded protection under this policy where considered appropriate.

11.324 Whilst the protection of existing open space is a key aspect of the above policy, it also provides a measure of flexibility. The consideration of changing demographic characteristics, the condition and vitality of existing provision, and any shifting patterns in need may mean that existing open space is no longer meeting requirements. There may be a surplus of provision identified or there may be scope to improve the existing provision to meet the local community's needs through development. In such circumstances, the policy seeks to allow for the enhancement or alteration of provision within the settlement as and where appropriate.

11.325 Where proposals have the potential to materially and adversely impact upon existing provision, the applicant will need to demonstrate that alternative provision is available to achieve the accessibility standards. The Open Space Assessment should be referred to for this purpose; the amount, location and type of open space should all be factored into the identification of alternative provision of 'equivalent value'. With regards to the changing patterns in need and use, consideration should be given to consulting with the Sports Council for Wales, alongside the Council's Leisure and Parks Services, the relevant Town and Community Councils, as well as other service providers and organisations with responsibility for the provision and maintenance of open space in the locality. It should be noted that it will be the responsibility of the applicant to provide sufficient information to demonstrate a proposal's compliance with this policy.

11.326 These open spaces make an important contribution to the Green and Blue Infrastructure of the County by providing areas for recreation, reducing the impact of climate change, improving health and well-being, and enhancing biodiversity and connectivity, amongst other benefits. Regard should be had to Policy PSD3: Green and Blue Infrastructure Network and the need to maximise the amount of green and blue infrastructure within a site and to achieve multi-functionality by bringing their functions together.

PSD8: Provision of New Open Space

All new residential developments of 5 or more homes will be required to contribute towards open space in accordance with the Council's open space standards.

If the standards cannot be met on site, or where there is sufficient existing provision already available to service the development, then a commuted sum will be sought where appropriate.

11.327 The Carmarthenshire Open Space Assessment sets out the current provision of open space across the Plan area and the standards which the Council and developers should aim to deliver. This policy provides the means to achieve these standards which take into consideration the quantity, function, and accessibility of provision. Further detail is outlined in the Open Space Assessment.

11.328 In determining whether there is a need for a contribution, the quantity, accessibility, quality, and type of open space provision will need to be considered. Where there is an existing deficiency within a community and the proposed development is likely to exacerbate the situation then a contribution will be required. Equally, a contribution will be required in circumstances where the proposed development would result in a deficiency.

11.329 In addition to the quantitative and accessibility standards, regard should be had to the quality of the existing provision, taking into consideration its condition, its requirements for future maintenance and its suitability for all members of the community.

11.330 In situations where the standards can be met by existing open space provision which is of a suitable quality then a supporting statement will be required from the applicant to evidence this. In such circumstances, the Council may seek a commuted sum towards the maintenance or upgrade of existing nearby open space provision, where considered necessary.

11.331 There may be situations where the standards cannot be met, for example, where the site cannot practically accommodate onsite provision of open space due to physical or design constraints, or where it would render the development wholly unviable. In such circumstances a supporting statement should be provided by the developer to clarify why the standards cannot be adhered to on site and the Local Planning Authority may seek commuted sums towards the maintenance of existing open space instead. Reference should be made to Policy INF1 with regards to planning obligations and developer contributions.             

11.332 It is acknowledged that there may be additional areas of open space which are not reflected in the Assessment which make a valuable contribution towards the provision of open space within the community, this may be particularly applicable to areas of informal recreation use. Additionally, it is acknowledged that whilst open space areas have been categorised as specific types of provision, they are on occasions capable of meeting the function of other types of open space. Under such circumstances, they may be considered as making a positive contribution towards multiple types of open space.

11.333 Where open space provision forms part of a planning application, the applicant should stipulate how the future management and maintenance of any open space provision has been considered. Reference should be made to Policy PSD1 for further guidance.

PSD9: Advertisements

Proposals for advertisements (which are subject to planning control) will be strictly controlled and will be expected to comply with the following:

  1. That their design, scale, materials, and siting have full regard to the building, structure, and/or land on which they are displayed;
  2. There are no adverse effects on the landscape / townscape, or the setting and integrity of the historic environment;
  3. That they do not constitute a hazard to public safety especially when sited on roads;
  4. That they safeguard, and positively enhance the Welsh language in the County by providing bilingual signage. Regard should also be had to the provisions of Policy SP8 - The Welsh Language.

Proposals for poster hoardings and advertisement signs should not lead to the proliferation or concentration of individually acceptable signs within the countryside.

New developments and streets will be expected to have Welsh names.

11.334 In order to promote the cultural identity of the Plan area, the Council will support and promote the provision of Welsh and English bilingual information signs, notice and information boards, displays and advertisement signs for tourist attractions and facilities. Private developers of tourism and leisure facilities will also be encouraged to publicise their business ventures through both the Welsh and English languages. Advertisements will not be required to provide the branding or company name bilingually, however, all ancillary or additional wording provided on signage in the public domain proposed in a planning application will required to be provided bilingually.

11.335 Bilingual signage and advertisement proposals which seek to combine several essential advertisements within one sign will be encouraged. SPG will be prepared to supplement Policy PSD9.

PSD10: Extensions

Proposals for the extension of existing residential dwellings / use class C3 (which require planning permission) whether buildings, other structures or a particular land use must comply with the following:

  1. The scale of the proposed extension is subordinate, or compatible to the size, type and character of the existing development, and does not result in over development of the site, nor lead to reduced and inadequate areas of parking, utility, vehicle turning, amenity or garden space;
  2. The external appearance (including materials used) of the proposed extension in terms of design is sympathetic and complementary to that of the existing development;
  3. There are no adverse effects on the natural environment, landscape/townscape or the setting and integrity of the historic environment;
  4. It promotes the principles of placemaking as set out within policy SP12;
  5. The local environment and the amenities of neighbouring developments are not adversely affected by the proposed extension;
  6. The use to be made of the proposed extension is compatible with the existing building, structure, or land use.

11.336 Proposals should be of a high standard of design and respectful in terms of siting, size, and the use of materials to complement the character and appearance of the existing building or structure and its surroundings and appropriate to the use of the existing building.

11.337 To ensure that where the existing development is of a poor design, the Council will require that any extension is of a higher quality design and/or materials. Regard should be had to the provisions of Policy SP12: Placemaking and Sustainable Places and PSD1: Effective Design Solutions: Sustainability and Placemaking.

PSD11: Noise Pollution

Proposals that will lead to a detrimental impact from noise pollution will be permitted where it can be demonstrated that appropriate mitigation measures will be implemented, and incorporated into the development to minimise the adverse effects.

Noise sensitive developments will be permitted where they will not be adversely impacted by existing noise generating uses.

11.338 The concept of soundscapes recognises the positive role that they play in creating a sense of place, rather than solely focusing on noise as a form of pollution.[75]

11.339 The emphasis should be on considering the potential impact of soundscapes on proposed developments (and in turn the potential impact of proposed developments on soundscapes) at an early stage. To this end, this Plan places an emphasis on stakeholders giving due consideration to these matters as an integral part of the design process from the outset. As such, these matters should not be seen as 'technical' considerations that are considered separately or an 'add on' later in the design evolution / planning application.

11.340 This Plan embraces the agent of change principle embedded into national policy [76]. To this end, this Plan recognises the importance of the change inceptor considering the potential impact of the development proposal on change receptors.

11.341 In noting the potential economic benefit of night-time economy related proposals, the health and well-being of residents should not be unduly compromised. A placemaking approach, which seeks to build consensus at an early stage, can provide a means to mediate these potentially conflicting interests.

11.342 Furthermore, noise sensitive developments such as housing, schools, and hospitals located near to transport infrastructure should, wherever possible, be designed to limit noise levels within, and around the development [77]. Where appropriate, effective, and appropriate mitigation should be implemented, and incorporated into the development to minimise the effects.

11.343 GBI can act as an effective sound buffer and be a valuable means of enhancing health and well‑being, through linking dwellings, workplaces and community facilities and providing high quality, accessible green spaces. Reference should be made to Policy PSD3: Green and Blue Infrastructure Networks.

11.344 Changes to soundscapes can also have impacts on species sensitive to noise disturbance. As always, proposals should satisfy the policies and provisions of the Plan as a whole. Specific reference may be made however to Strategic Policy 13 –Maintaining and Enhancing the Natural Environment (most notably in relation to sites of international importance to nature conservation, SSSI's, Section 7 priority habitats and species and the maintain and enhance requirement).

PSD12: Light and Air Pollution

Proposals that will lead to a detrimental impact from light and/or air pollution will be permitted where it can be demonstrated that appropriate mitigation measures will be implemented, and incorporated into the development to minimise the adverse effects.

Light

11.345 National policy recognises the negative impacts that light pollution can have on people, biodiversity, and ecosystem resilience. In this respect, PPW requires that authorities adopt policies in respect of lighting and the control of light pollution [78]. Consideration should be given to the negative impacts light pollution can have on landscape character and visual amenity. In this respect proponents of developments including lighting schemes should carefully consider the need for the types of lighting proposed and whether the proposal could proceed without the lighting identified. Wherever possible opportunities to mitigate potential cumulative impacts on the night sky should be considered.

11.346 Parts of Carmarthenshire remain relatively undeveloped with a limited impact from lighting on the night sky. In interpreting this policy, any lighting should be carefully designed and considered to minimise the impact on adjoining areas. Reference should be made to the Wales Tranquil Areas Map[79].

11.347 In all development (and in public spaces especially) there should be sensitive management of light, and exposure to airborne pollution should be kept as low as reasonably practicable. The Authority will prepare Supplementary Planning Guidance on lighting and the impacts on the night sky.

11.348 Light pollution can have negative impacts on species and habitats, in addition to human health and wellbeing. Any development schemes should incorporate lighting plans that ensure minimal or no light spill on GBI especially linear habitats such as hedgerows, woodland, or vegetated stream corridors, as well as any bat roots, their access points or known flight lines. This may include the need for a buffer zone between development and ecologically important features. Specific reference is made to Strategic Policy 13 –Maintaining and Enhancing the Natural Environment (most notably in relation to sites of international importance to nature conservation, SSSIs, Section 7 priority habitats and species and the maintain and enhance requirement.)

11.349 There are opportunities to acknowledge and embrace GBI as part of a placemaking approach, as well an effective way to screen ecologically sensitive areas from light pollution. In this regard, reference should be made to Policy PSD3: Green and Blue Infrastructure Networks.

Air

11.350 Air quality and its environmental, health and quality of life implications are recognised through national guidance [80]. This is also reflected within the ISA objectives and the HRA screening report.

11.351 As of 2022, there are three designated Air Quality Management Areas (AQMAs) in the County (Llandeilo, Llanelli, and Carmarthen). Reference may be made to the Council's Action Plan(s), whilst the boundaries of these AQMA's are shown on this Plan's Constraints Map.

  • Llandeilo
  • Llanelli
  • Carmarthen

11.352 Developers should be aware of the importance of early engagement with the Council, particularly in terms of the potential requirement for the undertaking of an Air Quality Assessment. Whilst this Plan is not prescriptive in relation to the instances that such an assessment will be required, it is considered that the scale and location of the proposal are key determinants in this regard.

11.353 Any Air Quality Assessment should highlight the required mitigation so that any risks to amenity, biodiversity and health are suitably mediated. The identification of such mitigation should seek to reflect the opportunities provided by green and blue infrastructure as part of a placemaking approach. Reference should be made to Policy PSD3: Green and Blue Infrastructure Networks.

11.354 It should be noted that the potential requirement for the undertaking of an Air Quality Assessment is not limited to sites within or adjacent to the County's AQMA's. Proposals will be subject to consideration on a case-by-case basis, however for proposals situated within the AQMAs the Council's Development Management Officers are likely to consult with the Council's Environmental Health Practitioners on a routine basis. Timely engagement with the Council is advised and relevant guidance referred to as appropriate.

11.355 This Plan recognises the potential inter-relationship between air quality and the integrity of the County's sites of international importance to nature conservation. Many of these sites feature habitats that are sensitive to declining air quality.

11.356 Increased intensive agriculture and densities of livestock can lead to increased nutrient loadings and ammonia emissions (amongst other pollutants), effecting both air and water. Proposals must consider wastes arising, cumulative impacts, and water quality (Reference CCH4: Water Quality and Protection of Water Resources), and all adverse impacts upon priority habitats and species, particularly in relation to those sensitive to ammonia pollution.

11.357 Proposals which would be likely to result in increased nutrient loading to the environment, such as intensive livestock units, will be required to assess the potential impacts in respect of water and air quality, to ensure that they are no adverse environmental effects and that emissions in rural areas do not unduly impact upon human health and wellbeing (i.e., nuisance smells). Reference should be made to appropriate NRW guidance including GN020 [81] (Assessing the impact of ammonia and nitrogen on designated sites from new and expanding intensive livestock units) and GN021 [82] (Poultry Units: planning permission and environmental assessment).

11.358 Specific reference may be made however to Strategic Policy 13 –Maintaining and Enhancing the Natural Environment (most notably in relation to sites of international importance to nature conservation, SSSIs, Section 7 Priority Habitats and Species and the maintain and enhance requirement) as well as Policy INF 2 - Healthy Communities. There are opportunities to acknowledge and embrace GBI as part of a placemaking approach. In this regard, reference should be made to Policy PSD3: Green and Blue Infrastructure Networks.

PSD13: Contaminated Land

Proposals will be permitted where it is demonstrated that any actual or potential risks from contaminated land can be suitably mitigated so that there is no residual adverse impact upon human health and the environment.

11.359 Carmarthenshire has a rich and diverse industrial legacy, including a wide range of industries such as mining, tin plate manufacturing, gas works, and tanneries. All such processes have the potential to have caused contamination of the ground, ground waters or other sensitive receptors. The Council has identified several sites where there is a potential for contamination to remain, or where there is no evidence to confirm that adequate remediation has taken place. In these areas, further investigation may be necessary.

11.360 The Council has a responsibility to identify contaminated land and ensure that it is managed in an appropriate manner, as set out in the Environmental Protection Act 1990.

11.361 The Council will need to be satisfied that the risks in respect of the proposed development site are fully understood and that remediation to the necessary standards is achievable[83]. Work should not commence on site until an appropriate stage of remediation as agreed, has been completed. The potential impacts on historic and natural environments will be considered in determining any proposal, with any submission to be accompanied by appropriate information.

11.362 Where applicable, due consideration will be given to the impact of any remediation operation on natural and historic environments with the relative benefits and need for the proposal weighed against the relative importance of the historic or natural interest of the site.

11.363 Timely engagement with the Council is advised in identifying any requirements as part of development proposals, both in terms of identifying risk and control / mitigation measures.

Healthy Habits - People have a good quality of life, and make healthy choices about their lives and environment.

11.364 Whilst it is recognised that there is an overlap between the themes and the assignment of policies the following having been identified under this theme:

  • Strategic Policy – SP 13: Rural Development
  • Strategic Policy – SP 14: Maintaining and Enhancing the Natural Environment
  • Strategic Policy – SP 15: Protection and Enhancement of the Built and Historic Environment

11.365 The following policies seek to support the delivery of the Plan's strategic objectives, but also provide high level links and broad conformity with the Well-Being Goals.

Strategic Policy – SP 13: Rural Development

The Plan supports development proposals which will contribute towards the sustainability of the County's rural communities. Development proposals in rural areas should demonstrate that they support the role of the rural settlements in the settlement hierarchy to meet the housing, employment, and social needs of Carmarthenshire's rural communities.

Development proposals in the countryside beyond identified settlements will be supported where it accords with the policies of this Plan.

11.366 The rural settlements of the County have an important role to play in improving the sustainability of the wider geographical area in which they are located as well as the County's overall sustainability. The Plan's strategy and settlement hierarchy reflects the significant role which the rural communities play through supporting growth of a proportionate scale which can make a positive contribution towards the long-term sustainability of the rural economy and rural communities.

11.367 Proportionate and sensitive development can provide the level of growth required to retain and enhance the services and facilities provided in the County's rural settlements. It can also serve to safeguard and promote the Welsh language in rural areas and enhance rural employment opportunities. However, the Plan seeks to ensure that development and growth does not have negative impacts upon a community's sustainability. Key to this is ensuring that development is not permitted at a scale or rate which would affect the community's ability to absorb and adapt to growth and change. This is imperative when considering the impacts which development can have upon the local infrastructure, the vitality of the Welsh language and the sustainability of the countryside and natural environment.

11.368 National planning policy has historically sought to restrict unnecessary development in countryside locations, principally to prevent sporadic and unsustainable growth and to maximise use of infrastructure, resources and services more commonly available in established urban areas.

11.369 Whilst this principle remains relevant and applicable, there is an enhanced recognition of the countryside as a place of work, as a home for many, a place to visit for others and a vital ecosystem for everyone. The Plan is committed to addressing and safeguarding the needs of rural communities. To this end, the Council established a Rural Affairs Task Group with the aim of assessing the needs of rural communities and taking positive steps to address these. This Plan supports the aims and outcomes from the Task Group principally through policies relating to the provision of housing and affordable housing; the economy and employment; the Welsh language, and the natural environment. Development proposals will need to demonstrate that they accord with these policies as well as the provisions of national planning policy.

11.370 PPW Ed.11 recognises that the countryside is a dynamic and multi-purpose resource. It identifies that in line with sustainable development and the national planning principles it should be preserved, and where possible enhanced. However, it also reflects the need to balance this against the economic, social and recreational needs of local communities and visitors.

11.371 PPW identifies that fostering adaptability and resilience will be a key aim for rural places in the face of the considerable challenge of maintaining the vibrancy of communities and availability of services, as well as contributing to the Cohesive Communities national well-being goal.

11.372 There is a clear recognition that rural areas exhibit challenges in relation to access to sustainable means of transport and the expectation of PPW in relation to access to active travel connections and sustainable functional linkages. This is reflected in the development of the settlement hierarchy as a whole.

11.373 This understanding of diversity is reflected within PPW in its consideration of sustainable transport requirements. It recognises there is a need to reflect different approaches to sustainable transport in defining growth within rural settlements.

11.374 This Revised LDP recognises the diversity that exists within the County and the need to reflect this in its strategic approach. The Spatial Strategy identifies a settlement hierarchy but sets it within a settlement framework grouped under six clusters. These clusters and the distribution of growth will focus on sustainable principles, but will also recognise the respective role, function and contribution of settlements within particular clusters.

The Rural Economy

11.375 National policy recognises that a strong rural economy is essential to support sustainable and vibrant rural communities. In this respect the establishment of new enterprises and the expansion of existing business is crucial to the growth and stability of rural areas.

11.376 Regard should be had to the impact of such developments, however as noted within PPW, many commercial and light manufacturing activities can be located in rural areas without causing unacceptable disturbance or other adverse effects.

11.377 Whilst there remains a focus on the identification or allocation of sites to meet an employment need it is also recognised that opportunities will also be required for small scale proposals where the need is not met by specific allocations. These small-scale enterprises are an important contributor to the rural economy (reference should be made to Policy EME4: Employment Proposals on Non-Allocated Sites, EME5: Home Based Businesses, and Policy INF3: Broadband and Telecommunications).

11.378 Reference should be had to the provisions of policy SP7 and its expression of the sustainable distribution of employment land provision.

Rural Enterprise Dwellings

11.379 As noted through national policy, a rural enterprise dwelling is required where it 'is to enable rural enterprise workers to live at or close to their place of work'. This includes encouraging younger people to manage farm businesses and supporting the diversification of established farms.

11.380 It is not the role or the intention of the Revised LDP to replicate the provisions of national planning policy. Consequently, reference should be had to the provisions of PPW and Technical Advice Note 6 (TAN6)[84] in the determination of applications for new rural enterprise dwellings. National policy clearly states that such proposals should be carefully examined to ensure that there is a genuine need.

11.381 Applications for rural enterprise dwellings should be accompanied by a rural enterprise dwelling appraisal, with permission only granted where it provides conclusive evidence of the need for the dwelling.

11.382 To ensure that rural enterprise dwellings are retained for their intended purpose, PPW requires that a condition restricting the occupancy of the property must be applied and that the dwelling be classified as affordable housing (definition as set out within TAN 2: Planning and Affordable Housing). Where appropriate, consideration will also be given to the use of a legal agreement (section 106) as a means of retaining the property's purpose as a Rural Enterprise Dwelling. This will ensure that the dwelling remains available to meet local affordable housing need should its original justification cease.

11.383 In circumstances where a planning application is received to lift existing agricultural occupancy conditions or where enforcement action is being taken for non-compliance with the condition, consideration will be given to the replacement of an agricultural occupancy condition with the rural enterprise dwelling condition set out in TAN6: Planning for Sustainable Rural Communities[85].

11.384 Proposals for One Planet Developments in the countryside will be required to provide for the occupant's minimum needs in terms of income, food, energy and waste assimilation over a period of 5 years[86]. Any proposal should be supported by an evidenced management plan, in those instances where this cannot be demonstrated any proposal will be considered against the policies and provisions of this LDP and national policy in relation to developments in the countryside. Reference will be made to the provisions of TAN6 and with regard to the requirements of the One Planet Development Practice Guide[87].

11.385 In assessing the suitability of a site for a One Planet Development, the applicant will be expected to have regard to its potential landscape and biodiversity impact, the ability to be effectively screened as well as being sufficiently near to Active Travel Routes or public transport.

RD1: Replacement Dwellings in the Open Countryside

Proposals for the replacement of existing dwellings in the countryside will be permitted provided that:

  1. the existing dwelling is not a traditional farmhouse, cottage or other building that is important to the visual and intrinsic character of the landscape;
  2. the original dwelling has not been demolished, abandoned or fallen into a state of disrepair and no longer has the appearance of a dwelling;
  3. the design of the replacement dwelling is of a form, bulk, size and scale that respects its location and setting;
  4. the proposal does not require an unacceptable extension to the existing established residential garden area;

Proposals for any outbuildings should be modest in size and sensitively located and that adequate ancillary garage and storage space can be achieved for the dwelling.

Proposals in relation to the replacement of a traditional farmhouse, cottage, or other building subject to the provisions of criterion a) above will only be permitted where, the applicant provides sufficient evidence to demonstrate that the re-use of the building is not economically viable or that it is of a structural condition that precludes its effective re-use.

11.386 The policy recognises and reflects the rural character of the County and the range and condition of the housing stock. It seeks to provide opportunity and scope for the provision of replacement dwellings in a manner which ensures that the County retains its traditional character, whilst also not detracting from the special qualities of rural Carmarthenshire.

11.387 Specific consideration should be given to the acceptability of a proposals' visual impact on the landscape. In this respect, its scale and design (including the extent of the residential curtilage) should not be to the detriment of the character and quality of the area.

RD2: Conversion and Re-Use of Rural Buildings for Residential Use

Proposals for the conversion and re-use of suitable rural buildings for residential use will be permitted where:

  1. the existing use has ceased, and its re-use would not result in the need for an additional building;
  2. the design and materials are of a high quality, and the form and bulk of the proposal, including any extensions, curtilage and access arrangements are sympathetic to and respect: the surrounding landscape, rural character of the area and the appearance of the original building;
  3. Proposals for extensions should be proportionate and reflective of the scale, character and appearance of the original building;
  4. the original building is structurally sound and any rebuilding works, necessitated by poor structural conditions and/ or the need for new openings in walls, do not involve substantial reconstruction;
  5. where applicable, the architectural quality, character and appearance of the building is safeguarded and it's setting not unacceptably harmed.

Proposals relating to buildings which are of a modern portal framed construction will not generally be considered appropriate for residential conversion.

11.388 Proposals for the conversion of suitable rural buildings for residential use should be high quality in terms of design and the materials used. It is not the purpose of the policy to permit proposals where an existing building is unsuitable for conversion without extensive alteration, rebuilding, or extension, or if the creation of a residential curtilage would have a harmful effect on the character of the countryside. Such proposals will be considered as a new house in the open countryside.

11.389 Residential proposals may be favourably considered where they form part of a proposed scheme for business re-use. Conditions may be imposed which require that the works necessary for the establishment of the business/enterprise have been completed prior to the occupation of the residential element. Furthermore, a condition or planning obligation tying the residential unit to the operation of an enterprise may also be utilised as appropriate.

11.390 Proposals for buildings of a modern construction such as portal framed units or temporary structures will generally not be considered appropriate for conversion. Proposals for buildings within the residential curtilage which were constructed as ancillary to the primary property e.g. garages will generally not be considered for conversion under this policy.

11.391 The Council will need to be satisfied that adequate living and storage (including garaging) space can be achieved without the necessity for significant extensions to the building. Proposals for future expansion of units will not generally be considered appropriate. Similarly, the Council will consider the withdrawal of normal permitted development rights to construct extensions and ancillary buildings.

11.392 Reference should be made to SPG in relation to the Conversion and Re-Use of Rural Buildings.

RD3: Farm Diversification

Proposals for farm diversification developments which strengthen the rural economy will be permitted where:

  1. It is compatible with, complements and supports the principal agricultural activities of the existing working farm;
  2. It is of a scale and nature appropriate to the existing farm operation;
  3. It has appropriate regard to the highways and transport infrastructure;
  4. It would not have an adverse impact on the character, setting and appearance of the area and the surrounding landscape.

Proposals should give priority to the conversion of suitable existing buildings on the working farm. Where justified, new buildings will be permitted where they are integrated with or linked to the existing working farm complex and not detrimental to the respective character and appearance of the area and surrounding landscape.

11.393 Diversification in rural areas can often add to the income streams and economic viability of farms, strengthen the rural economy, and add to wider employment opportunities.

11.394 Farm diversification proposals are intended to supplement and support the continuation of the existing farming activity. Proposals should be accompanied by evidence detailing a justification for the use and its relationship with the existing farming activity.

11.395 Where a proposal incorporates farm shops they often have to import goods possibly from other local suppliers. In determining proposals made under this policy, consideration will be given to restricting the broad types of produce sold and to the volume of sales. Consideration will also be given to the scale of the operation notably where an unrestricted use would result in an adverse effect on the vitality and viability of nearby retail activities.

11.396 In considering proposals for farm diversification it is acknowledged that their rural context means that they cannot always be well served by public transport. Consequently, whilst its availability will be taken into account when considering the nature and scale of the proposal, the potential for certain diversification proposals which can only be accessible by private car is acknowledged. Such proposals should have regard to the sustainable transport hierarchy.

11.397 Where appropriate, legal agreements will be used to tie agricultural buildings to the land if re-use is associated with farm diversification where fragmentation of the agricultural unit is likely to occur.

RD4: Conversion and Re-Use of Rural Buildings for Non-Residential Use

Proposals for the conversion of rural buildings for business use will be permitted where:

  1. the building is functionally suitable for the specific use;
  2. There is sufficient land and storage space attached for the functional needs of the proposed use (including parking provision);
  3. the conversion and proposed use, or the use of surrounding land for the provision of access, parking facilities, ancillary structures, on site facilities or storage would not result in an adverse impact on the character of the area, nearby uses or impact on the viability of similar uses within the locality;
  4. the existing building is structurally sound;
  5. any extension is reflective of the scale of the original building.

11.398 National Planning Policy recognises the essential contribution of a strong rural economy to supporting sustainable and vibrant rural communities. It seeks to provide a positive agenda for the potential for the re-use of existing buildings in rural areas for business purposes.

RD5: Equestrian Facilities

Development proposals for stabling, equestrian facilities or use of land for equestrian activities will be permitted where:

  1. the facility is grouped within an existing farm complex, or is sited as close as possible to existing buildings;
  2. the proposed use will be of an intensity appropriate to its environment and setting;
  3. the development will not have an adverse impact on the landscape or nature conservation interests; and
  4. suitable access and parking can be provided for horse boxes and proposed the level of commercial activity;
  5. commercial facilities have suitable access to the highway network.

11.399 Proposals for stables and associated equestrian facilities are normally associated with a countryside location. Planning permission will generally be required for the development of stables, unless the horses are part of the agricultural activity, or the stable is within the curtilage of a dwelling (reflecting potential permitted development rights).

11.400 Proposals which have no adverse landscape and/or environmental impact will be supported. In this respect, proposals will be expected to demonstrate how the development fits within its countryside setting and the regard it has to the settlement framework and its setting, including existing buildings.

11.401 The erection of a ménage for private domestic use should be designed so that it has no adverse effect upon the landscape, is well related to existing buildings, and of an appropriate scale.

11.402 Commercial stables and ménages will be considered appropriate as rural businesses where these can be accommodated without harm to the character of the area and are considered acceptable in highways terms.

Strategic Policy – SP 14: Maintaining and Enhancing the Natural Environment

Development proposals must protect and enhance the County's natural environment.

Proposals must reflect the role that natural environment aspects and features and an ecologically connected environment have in protecting and enhancing biodiversity, defining the landscape, contributing to Well-being and the principles of the Sustainable Management of Natural Resources.

All development proposals must be considered in accordance with National Policy and legislative requirements where a proposal for development would result in a significant adverse effect on designated sites, including European sites, SSSIs, and priority habitats and species.

Any development proposal should contribute towards the overall aim of the South West Wales Area Statement (NRW, 2020) in building resilience of our ecosystems and enhancing the benefits they provide. Development that would result in unacceptable adverse environmental effects or that does not result in enhancement of biodiversity will not be permitted.

Development must not cause any significant loss of habitats or populations of species (locally and/or nationally) and must provide net benefits for biodiversity. Where biodiversity enhancement is not proposed as part of a proposal for development, significant weight will be given to its absence, and unless other significant material considerations indicate otherwise it will be necessary to refuse permission.

11.403 Carmarthenshire has a rich and diverse natural environment with several designated sites and protected species. This policy seeks to recognise the quality and value of the natural environment and landscapes across the Plan area, and their fundamental role in defining the County's identity, character, and distinctiveness. The recognition of the considerable merits of green and blue infrastructure for mitigating the effects of climate change, for capturing and storing carbon and for maintaining and enhancing biodiversity and ecological networks is implicit. Reference is made to Green and Blue Infrastructure Network policy PSD3.

11.404 The protection and enhancement of these elements form an important component of the Strategy, which looks to reflect not only those international and national designations, but also the contribution of sites and landscapes at the local level. The LDP will also seek to conserve and enhance natural resources such as geodiversity, water, soil, and air quality.

11.405 This policy also recognises the often-interconnected components of the natural environment and their contribution towards maintaining and enhancing biodiversity, as well as the creation of attractive and cohesive spaces for communities, and the well-being of Carmarthenshire's population. Those natural environment aspects and features cited in the policy would include geology, landform, soils, land cover and hydrology.

11.406 The protection and enhancement of connectivity, and the contribution it makes to the quality of Carmarthenshire's landscape, natural environment and biodiversity is an important consideration. As a result, the potential impact of the Plan, its policies, and proposals upon nature conservation interests, amenity value, water/soil/air quality, hydrology, geology and geomorphological regimes will continue to inform the plan-making process.

11.407 A Habitats Regulation Assessment (HRA) has been undertaken to assess the impacts of the Plan on European protected sites, including those being considered for designation.

11.408 Whilst the Plan recognises the need for new development for both social and economic purposes the Council will safeguard Carmarthenshire's environmental qualities. The Plan also seeks to ensure the protection and enhancement of the natural environment through detailed policy. The policy reflects the content of the Chief Planning Officer's letter dated 23rd October 2019 on Securing Biodiversity Enhancements. Reference is also made to the South West Wales Area Statement (2020) in this regard.

11.409 In addition, and reflecting the duties placed upon Local Authorities, the Plan has regard to the National Park designation and the purpose for which it is designated, where it may affect the consideration of planning proposals. Additionally, cultural, townscape and landscape assets (including Conservation Areas, Listed Buildings, and Scheduled Monuments) are also inextricably linked to the natural environment and, therefore, reference is made to Strategic Policy – SP 15: Protection and Enhancement of the Built and Historic Environment.

NE1: Regional and Local Designations

Development proposals that will result in adverse effects to a Local Nature Reserves (LNR), Site of Importance for Nature Conservation (SINC), and/or Regionally Important Geological/Geomorphological Site (RIGS),will only be permitted where it can be demonstrated that:

  1. All adverse impacts are addressed in accordance with the mitigation hierarchy;
  2. Where this is not feasible, ensure sufficient compensatory measures are put in place which address all potential adverse impacts upon these sites resulting from the proposal; or
  3. In exceptional circumstances, where the reasons for the development and/or land use change clearly outweighs the need to safeguard conservational interests of the site.

Development proposals must not cause any significant loss of habitats or populations of species, locally or nationally, and must provide net benefits for biodiversity.

11.410 LNRs and RIGS identify areas which are of local importance for nature conservation and geological value (respectively) and can contain a variety of habitat types and/or support a range of species. Protection of these sites can make an important contribution to the Council's duty under Section 6 of the Environment (Wales) Act 2016. These features are also valuable with regards to their contribution to the quality of the local environment and to enabling adaption and resilience to climate change.

11.411 In circumstances where the need for a development might outweigh the need to protect a particular site, then impact will be avoided, minimised, and mitigated as far as possible (in accordance with the mitigation hierarchy). Where residual impacts remain, measures will be put in place to ensure that alternative wildlife habitat provision or habitat creation is provided to ensure that there is no net loss in overall conservation value of the area or feature. Where appropriate, the authority will consider the use of conditions and/or planning obligations to provide appropriate mitigation and/or compensation measures.

11.412 Sites of Importance for Nature Conservation Value (SINCs) offer significant potential as a biodiversity resource. Whilst there are no SINCs identified within the plan area, it remains an objective of the authority to actively explore their designation. Any future designation of SINCs will be in accordance with emerging SPG detailing the revised methodology for underpinning their identification. This SPG will be produced concurrently with the adoption of the Plan.

NE2: Biodiversity

Development proposals must maintain and enhance biodiversity in accordance with Section 6 of the Environment (Wales) Act 2016.

Proposals will not be permitted where they would result in an adverse impact on priority species and habitats, and features of recognised importance to the conservation of biodiversity, except where it can be demonstrated that:

  1. All adverse impacts are addressed in accordance with the mitigation hierarchy;
  2. Where this is not feasible, ensure sufficient compensatory measures are put in place which address all potential adverse impact upon biodiversity resulting from the proposals; and
  3. In exceptional circumstances, where the reasons for the development and/or land use change clearly outweighs the need to safeguard the biodiversity and nature conservation interests of the site.

Development proposals must not cause any significant loss of habitats or populations of species, locally or nationally, and must provide net benefits for biodiversity.

11.413 This policy seeks to ensure that the habitats and species identified within Section 7 of the Environment (Wales) Act 2016 are suitably protected from harmful development and that the Council fulfils its obligation to maintain and enhance biodiversity and promote ecosystem resilience. Full reference should be made to the Nature Conservation and Biodiversity SPG, Chapter 6 PPW Ed.11 and the Chief Planning Officers letter (2019) on securing Biodiversity Enhancements.. This SPG includes guidance to developers and should assist in the implementation of this policy and the LDP. The role of habitats and associated areas as connectivity pathways, 'ecological networks' or 'animal corridor networks' will, where applicable, be considered (reference should be made to Policy NE3).

11.414 Where required, management plans detailing matters such as mitigation measures should be produced as part of any application, and agreed with the authority prior to permission being granted. Proposed mitigation should be accompanied by an agreed monitoring regime. Mitigation may include careful design and scheduling of work, with phasing considered so that the timing of any works minimises disturbance.

11.415 Development proposals should seek to enhance biodiversity. Where biodiversity enhancement is required and not proposed as part of an application, significant weight will be given to its absence, and unless other significant material considerations indicate otherwise it will be necessary to refuse permission[88]. Proposals for development will be required to assess the attributes of ecosystem resilience in line with the framework outlined in paragraph 6.4.9 of PPW11 and will be expected to protect and enhance these attributes post development.

11.416 In exceptional circumstances, the need for a development might outweigh the need to protect a particular site. In such instances, then impact will be avoided, minimised, and mitigated as far as possible (in accordance with the mitigation hierarchy), and where residual impacts remain, measures will be put in place to ensure that alternative wildlife habitat provision or habitat creation is provided in order to ensure that there is no net loss in overall biodiversity of the area or feature.

11.417 The location and scale of a development, including the nature of the habitats on the site and the surrounding area will be a consideration in the nature of any management required.

11.418 The potential impacts, either individually or cumulatively of a development, should be carefully considered in determining any proposal. In this regard, the impact of noise, vibration, drainage, lighting, traffic, and air quality considerations may have implications during construction or once any development is completed.

11.419 The use of planning conditions and/or planning obligations will be considered where appropriate.

NE3: Corridors, Networks and Features of Distinctiveness

Development proposals will be expected to maintain and enhance ecological corridors, networks, and features of distinctiveness. Proposals which include provision for the retention and appropriate management of such features will be supported.

Proposals that result in an adverse effect on the connectivity or integrity of ecological corridors, networks or features of distinctiveness will only be permitted where:

  1. All adverse impacts are addressed in accordance with the mitigation hierarchy;
  2. Where this is not feasible, ensure sufficient compensatory measures are put in place which address all potential adverse effects upon biodiversity resulting from the proposals; and
  3. In exceptional circumstances, where the reasons for the development and/or land use change clearly outweighs the need to safeguard the biodiversity and nature conservation interests of the site.

Development proposals must not cause any significant loss of habitats or populations of species, locally or nationally, and must provide net benefits for biodiversity.

11.420 This policy seeks to ensure the appropriate protection and management of ecological corridors, networks, and features of distinctiveness. These include features which, because of their linear and continuous structure or their functions as 'stepping-stones' or 'wildlife corridors' are essential for reducing habitat fragmentation and encouraging ecological migration, dispersal, or genetic exchange. Protection of these features can make an important contribution to the Council's duty under Section 6 of the Environment (Wales) Act 2016. These are also valuable with regards to their contribution to the quality of the local environment and to enabling adaption and resilience to climate change.

11.421 Features which contribute include: hedgerows, ditches and banks, stone walls, streams, tree belts, woodlands, veteran trees, parklands, green lanes, river corridors, lakes, ponds, road verges, scrub or habitat mosaics or networks of other locally important habitats including peat bogs, heathland, wetlands, saltmarshes, sand dunes and species rich grass lands.

11.422 Providing ecological connectivity is an important ecosystem service of the Green and Blue Infrastructure networkand its protection and/or enhancement accords with Policy PSD3 Green and Blue Infrastructure Network. In identifying these features and in implementing this policy, reference should be made to the Green and Blue Infrastructure Assessment and accompanying mapping[89].

NE4: Development within the Caeau Mynydd Mawr SPG Area

Development proposals will be permitted where they accord with the Council's commitment to promote and contribute to the delivery of the Conservation Objectives of the Caeau Mynydd Mawr Special Area of Conservation (CMM SAC) in line with the Habitats Regulations. Proposals located within the SPG Area will be required to contribute towards increasing the quality and amount of available habitat for the Marsh Fritillary butterfly within the SPG Area.

To achieve the Conservation Objectives and to mitigate for the loss of potential supporting habitat and connectivity for the marsh fritillary butterfly that may result through the development, the Council will (where applicable) seek to secure Planning Obligations (in accordance with LDP policy INF1 and the provisions of the SPG for the CMM SAC) from developments within the SPG area.

11.423 Developments can proceed within the Caeau Mynydd Mawr SPG Area subject to there being no likely significant effect upon the Caeau Mynydd Mawr Special Area of Conservation (CMM SAC). To this end, the Council will (where applicable) seek developer contributions to fund the delivery of habitat management project within the SPG Area. Further information is set out within the Caeau Mynydd Mawr Supplementary Planning Guidance (CMM SAC SPG) which will adopted concurrent with the Plan[90].

11.424 The SPG provides a mechanism for developers to seek to mitigate the impact of their proposals on the SAC through contributing to the Council's CMM habitat management project. To ensure the LDP's compliance with the Habitats Regulations, the Council will (where appropriate) give priority to securing obligations in respect of the Caeau Mynydd Mawr SAC for proposals located within the CMM SPG Area.

11.425 The SPG is informed by a robust evidence base. The SPG sets out a charging schedule which forms the starting point for all negotiations regarding the contribution required from developers. Reference should be made to the SPG in terms of any proposed 'in kind' contributions proposed by developers.

11.426 The Caeau Mynydd Mawr SPG Area is identified on the Proposals Map.

NE5: Coastal Management

Proposals for coastal management schemes will be permitted, provided that:

  1. The need for the development is appropriately justified;
  2. The development is in keeping with the surrounding environment;
  3. It protects, enhances, and where appropriate, creates walking linkages to the All Wales Coast Path and the footpath network;
  4. The scheme will not result in increased erosion, flooding, or land instability;
  5. They conserve and enhance the landscape, seascape, and historic environment, and have net benefits for biodiversity.

Proposals will be encouraged to provide additional Active Travel routes to link communities and existing paths to the All-Wales Coast Path.

11.427 Coastal defence schemes play an important role in protecting the County's population, assets and resources from tidal flooding and erosion. This policy seeks to ensure that coastal management schemes are constructed in appropriate locations, and do not adversely impact upon the surrounding landscape. Schemes will be required to pay regard to the protection of species and habitats in line with Strategic Policy SP13.

11.428 Encouragement will be given to incorporating appropriate public access and recreational facilities within schemes.

11.429 New coastal management schemes or improvements to existing schemes will not be permitted for the purpose of enabling new development in areas of flood risk or coastal erosion.

11.430 Proposals will be expected to take account of the contents of the South Wales (Lavernock Point to St Ann's Head) Shoreline Management Plan (SMP2). The SMP seeks to reduce these risks to people and the developed, historic and natural environments, and sets out how the coast should be managed in the future through a number of sustainable long-term coastal erosion and coastal flood risk management policies for the coast.

11.431 Specific reference is made to Policy NE7: Coastal Change Management Area and its context in relation to developments within, or affected by the SMP 'no active intervention' and 'managed realignment' policies.

11.432 The proposals contained within this LDP have been prepared with due regard to the policies set out in SMP2.

NE6: Coastal Development

  1. Proposals in all coastal locations will only be permitted provided that:
    1. They have considered matters associated with coastal change;
    2. They will not unacceptably harm the landscape and seascape through inappropriate scale, mass, and design.
  2. Development proposals in undeveloped coastal locations will only be permitted provided that:
    1. It is necessary for them to be sited at a coastal location;
    2. They are part of a necessary coastal management scheme;
    3. They do not increase the risk of erosion, flooding, or land instability;
    4. They would not result in the need for new coastal protection measures;
    5. They conserve and enhance the landscape, seascape, and historic environment, and have net benefits for biodiversity.

11.433 Carmarthenshire has an extensive area of coastline, stretching from the mouth of the River Loughor to Marros. The coastal area can be defined as areas where the land and adjacent sea are considered mutually interdependent.

11.434 The undeveloped coast will rarely be considered the most appropriate location for development, and any proposals should have regard to the contents of SMP2, in addition to other policies of the Plan.

11.435 Matters associated with coastal change include: the risks of erosion, flooding, land instability, the preferred approaches to address such risks, and the impacts on biodiversity and ecological resilience.

11.436 Reference is made to policy NE7: Coastal Change Management Area and its context in relation to developments within or affected by the SMP2 'no active intervention' and 'managed realignment' policies.

NE7: Coastal Change Management Area

The Coastal Change Management Area (CCMA) has been defined as those areas where the SMP2 identifies a policy of 'no active intervention' and 'managed realignment'.

Development proposals located within the identified CCMA shall not have an adverse impact on rates of coastal change elsewhere, and will be subject to the following:

1. New Residential Development

Proposals for any residential use within the CCMA will not be supported.

2. Relocation of Existing Residential Dwellings

Proposals for the relocation of existing residential dwellings located within the CCMA will be permitted where:

  1. The development replaces a permanent dwelling which is affected or threatened by erosion and/or coastal flood risk within 20 years of the date of the proposal; and
  2. The relocated dwelling is located an appropriate distance inland with regard to CCMA and other information in the Shoreline Management Plan, and it is in a location that is:
    1. in the case of an agricultural dwelling, within the farm holding or within or adjoining existing settlements, or
    2. within or adjoining existing settlements close to the location from which it was displaced;
    3. in the case of a static caravan(s), chalet(s) or permanent other visitor accommodation unit(s) - within, adjacent or within an acceptable proximity to the existing site.
  3. The site of the existing dwelling is cleared of any buildings or residential paraphernalia and made safe; and,
  4. The new dwelling is comparable in size to that which it is to replace; and,
  5. The proposal recognises the respective sense of place within the area and should not have a detrimental impact on the landscape, townscape, seascape and/or biodiversity of the area; and

3. Non-Residential Buildings

Proposals for the following types of new non-residential development will be permitted within the CCMA predicted as being at risk from coastal change, subject to an acceptable Flood Consequence Assessment and Stability Assessment:

  1. development directly linked to the coastal area (e.g., beach huts, cafés, tea rooms, shops, leisure activities); and
  2. development providing substantial economic and social benefits to the community; and
  3. where it can be demonstrated that there will be no increased risk to life, or any significant risk to property.

Redevelopment of, or extensions to, existing non-residential property or intensification of existing non-residential land uses on sites within the CCMA, will be permitted where it can be demonstrated through a suitable Flood Consequences Assessment and Stability Assessment that there will be no increased risk to life, nor any significant risk to property (where appropriate).

4. Extensions to Existing Dwellings and Infrastructure

Proposals for the following types of development will be permitted in the CCMA, subject to a suitable Flood Consequences Assessment and/or Stability Assessment:

  1. Limited residential extensions that are closely related to the existing scale of the property;
  2. Ancillary development within the residential curtilage of existing dwellings;
  3. Key community and other infrastructure (including roads), which is required to be located within the CCMA to provide the intended benefit for the wider community will be permitted where it is accompanied by clear plans to manage the impact of coastal change on it and the services it provides.

Development proposals must not cause any significant loss of habitats or populations of species, locally or nationally, and must provide net benefits for biodiversity.

11.437 As with policy NE6, regard should be had to SMP2 which sets a range of policies for the coastline, which are 'hold the line', 'no active intervention' or 'managed realignment', per policy epoch (namely: up to 2025, 2026 - 2055, and 2056 - 2105).

11.438 The SMP2 can be viewed at www.southwalescoast.org . PPW states that Local Authorities should help reduce the risk of flooding and the impact of coastal erosion by avoiding inappropriate development in vulnerable areas.

11.439 The CCMA represents where the accepted SMP2 policy is for 'no active intervention' or 'managed realignment' during the Plan period.

11.440 New residential development is not considered suitable in the CCMA. This reflects the level of risk of coastal erosion and flooding in these areas. The implementation of this approach will apply equally to proposals to change of use of other permanent buildings to residential accommodation and replacement dwellings and is part of a precautionary approach which is guided by the policy considerations set out within the SMP2.

11.441 The type of residential use this applies to includes individual dwellings, flats above existing commercial properties, sheltered housing, student accommodation, hostels, shared housing for disabled people, nursing homes and care homes, residential education, static caravans and chalets (including those associated within leisure and tourism) where they are connected to infrastructure and part of an established and fully serviced site and training centres.

11.442 Planning conditions will be applied, or a planning obligation will be secured where there is a need to: limit the planned life of a development or seasonal use; remove a time-limited development or existing dwellings on cessation of use; review relevant planning permissions; manage the occupancy of a relocated dwelling.

11.443 To enable coastal communities to adapt to coastal change, the Policy facilitates the relocation and replacement of permanent dwellings to alternative locations safe from coastal erosion. It seeks to ensure coastal communities remain sustainable by maintaining levels of housing stock and reducing risk to people and property.

11.444 Where an extension to a residential property requires permission, they will be supported where it can be demonstrated that the benefits to the homeowner outweigh any increase in risk to the property. However, consideration must be given to the wellbeing of the occupants, risk to life as a result of flooding, or erosion.

11.445 Non-residential development will be subject to the timeframe anticipated for loss of the property as a result of coastal erosion. This would apply to proposals for uses such as community facilities, business uses, sports pitches and playing fields. The risk assessment should fully consider the benefits against the risks associated with utilising a property with a potentially limited lifespan.

11.446 Where appropriate, a time limited planning permissions may be used to control the planned lifetime of a new development. This would allow control over the future of the development and potential risk to property and people where this is appropriate.

Strategic Policy – SP 15: Protection and Enhancement of the Built and Historic Environment

Development proposals should preserve or enhance the built and historic environment of the County, its cultural, townscape and landscape assets, and, where appropriate, their setting.

Proposals will be expected to promote high quality design that reinforces local character and respects and enhances the cultural and historic qualities of the plan area.

11.447 Carmarthenshire has a rich and diverse historical and cultural built heritage with a range of Conservation Areas, Listed Buildings, and Scheduled Monuments. The recognition of the Plan area's built heritage and its conservation is essential in providing a sense of history, character, and a sense of place.

11.448 The Plan area also contains discovered, and yet to be discovered archaeological sites and features. The Policy and the Plan aims, in conjunction with primary legislation on the built environment and historic buildings to safeguard the cultural integrity of the historic settlements, features and buildings within the Plan area. Where applicable, it also looks to contribute to the enhancement of the historic and built environment. This recognises that our historic assets are irreplaceable resources, and their conservation provides social, cultural, economic, and environmental benefits.

11.449 The County's historic buildings, townscape and landscape should be regarded as assets and positively conserved and enhanced for the benefit of residents and visitors alike. These are not only affected by change and neglect, but also by changes to their setting. As such, this is an important consideration in making decisions on proposals which may have an effect.

11.450 Many elements of the County's built and historic environment are protected through legislation or other policy provisions, and as such do not require policies in the revised LDP. The Plan does not therefore include policies in relation to facets of the built heritage such as Scheduled Monuments as they are adequately protected elsewhere.

11.451 There are however aspects relating to the protection of the historic environment which may be addressed through the revised LDP, particularly those pertaining to local features and local buildings.

11.452 Clear guidance and legislation in respect of the following is contained within PPW: Edition 11 – Chapter 6: Conserving the Historic Environment, and Strategic Policy SP14: Maintaining and Enhancing the Natural.

11.453 Environment which recognises the importance of such areas and features of the County:

  • Historic Parks and Gardens[91] - Many parks and gardens are historically significant and are listed in the Historic Parks and Gardens in Wales Register. These areas are also defined on the LDP Proposals Map;
  • Historic Landscapes[92]
  • Archaeological Remains[93]
  • Enabling Developments[94] - PPW sets out the provisions through which an enabling proposal would be considered
  • Scheduled Monuments - These are defined on the Proposals Map

11.454 The authority will prepare SPG as appropriate and where required with regard to the Historic and Built Environment, in addition to Archaeology.

Policy BHE1: Listed Buildings and Conservation Areas

  1. Proposals in respect of a listed building will only be permitted where they accord with the following:
    1. Proposals for the alteration and/or extension to a listed building, or its curtilage will be required to ensure that the special architectural character, or historic interest is preserved or enhanced;
    2. The change of use of a listed building, or its curtilage will only be permitted where it contributes to the retention of a building or its sustainable re-use, whilst avoiding an adverse effect on its character, special interest, or structural integrity;
    3. Proposals for the total or substantial demolition of a listed building will only be permitted where there is the strongest justification and convincing evidence that the proposal is necessary;
    4. Proposals which have a relationship to, or impact upon the setting of a listed building, or its curtilage must ensure that the setting is preserved or enhanced.
  2. Developments within or adjacent to a conservation area will be permitted, where it would preserve or enhance the character or appearance of the conservation area, or its setting.
  3. New developments in conservation areas should be of a high standard of design which responds to the area's special characteristics and features.

11.455 Where a proposal is for a new building within a conservation area, it should have regard to the following:

  • Important views, vistas, street scenes, roof-scapes, trees, open spaces, gaps, and other features that contribute to the character or appearance of the conservation area;
  • Historically significant boundaries or other elements that contribute to the established form of development;
  • The relationship to existing buildings and spaces, and settlement for;
  • Scale, height and density, architectural design, and materials.

BHE2: Landscape Character

Development proposals should relate to the specific landscape and visual characteristics of the local area, ensuring that the overall integrity of landscape character is maintained by:

  1. identifying, protecting and, where appropriate, enhancing the distinctive landscape and historical, cultural, ecological, and geological heritage, including natural and man-made elements associated with existing landscape character;
  2. protecting international and national landscape designations including National Parks and Areas of Outstanding Natural Beauty (AONB) and their settings;
  3. preserving local distinctiveness, sense of place and setting;
  4. respecting and conserving specific landscape features, and integrating the principles of placemaking and Green and Blue Infrastructure;
  5. protecting key landscape views and vistas.

11.456 Carmarthenshire is characterised by diverse and high-quality landscape resources and areas of notable visual value. It also includes or borders a range of landscape designations, including the Brecon Beacons and Pembrokeshire Coast National Parks and Gower AONB.

11.457 The County's key landscape attributes are varied and include upland areas, coastal plains and river valleys of high landscape value and ecological importance. These provide significant environmental, economic, and social benefits and help to create a sense of place.

11.458 The Policy seeks to protect, maintain, and (where appropriate) enhance the character and quality of Carmarthenshire's landscape with those features which contribute to the County's distinctive character afforded appropriate levels of protection with their significance highlighted using the NRW LANDMAP resource. Note: LANDMAP is a Geographical Information System based landscape resource where landscape characteristics, qualities and influences on the landscape are recorded and evaluated into a nationally consistent data set.

11.459 The policy will be supported by a Landscape Character Assessment and Supplementary Planning Guidance (SPG). This SPG will build on the work undertaken and policy provisions in respect of Placemaking and Green and Blue Infrastructure in developing an integrated suite of guidance documents to guide development proposals.

11.460 This SPG will identify and describe distinctive landscape character areas and types throughout the plan area.

11.461 In this respect the purpose of the policy is to reflect the specific distinctiveness, qualities, and sensitivities of the County's landscape components.

Strong Connections - Strongly connected people, places and organisations that are able to adapt to change

11.462 This Revised LDP seeks to understand and recognise the role of community and sense of place by seeking to distribute new development in manner that recognises and respects the role and function of our settlements.

11.463 By distributing growth in a sustainable manner it recognises the value of connectivity. The Plan seeks to assist in the creation of connected communities that are resilient, vibrant and can foster a well-being amongst residents.

11.464 Through the creation of a resilient, connected and sustainable County, the Plan seeks to reflect the challenges facing our communities and the need to respond positively. It sets a framework to contribute to tackling climate change and develops a strategy and policy agenda centred on sustainable development, whilst acknowledging the diversity of the County.

11.465 Whilst it is recognised that there is an overlap between the themes and the assignment of policies the following having been identified under this theme:

  • Strategic Policy – SP 16: Climate Change
  • Strategic Policy – SP 17: Transport and Accessibility
  • Strategic Policy – SP 18: Mineral Resources
  • Strategic Policy – SP 19: Waste Management

11.466 The following policies seek to support the delivery of the Plan's strategic objectives, but also provide high level links and broad conformity with the Well-Being Goals.

Strategic Policy – SP 16: Climate Change

Development proposals will be supported if they respond, adapt, increase resilience, and minimise the causes and impacts of climate change. Proposals must:

  1. Contribute to a reduction in carbon emissions by reflecting sustainable transport principles and minimising the need to travel, particularly by private motor car;
  2. Avoid, or where appropriate, minimise the risk of flooding including the incorporation of measures (such as SuDS and flood resilient design);
  3. Promote the energy hierarchy by reducing energy demand, promoting energy efficiency, and increasing the supply of renewable energy;
  4. Incorporate appropriate climate responsive design solutions including orientation, layout, density, and low carbon solutions (including design and construction methods) and utilise sustainable construction methods where feasible; and/or
  5. Contribute towards the protection and enhancement of GBI assets and resilient ecological networks as carbon sinks.

Development proposals which are located within areas at risk from flooding will not be permitted unless they accord with the provisions of Planning Policy Wales TAN 15.

11.467 The need to tackle climate change represents a fundamental challenge if sustainable development and the obligations under the Well-being of Future Generations Act 2015 are to be delivered. The economic, social, and environmental implications arising from Climate change are profound and are acknowledged in the South West Wales Area Statement and in the declaration of a climate emergency by the Welsh Government and Carmarthenshire County Council.

11.468 The changing climate and impacts for Wales predicted by the UK Climate Impacts Programme (UKCIP) present the planning system with serious challenges. In addressing them, Planning Policy Wales (PPW) outlines a series of objectives which should be considered during the preparation of a development plan.

11.469 The LDP categorises settlements into a hierarchy which reflects their relative sustainability and takes account of the sustainable transport hierarchy. The Plan's aspiration of minimising the need to travel, particularly by private motor car, and its contributory role towards the facilitation of an integrated transport strategy seeks to direct development to appropriate locations which serve to achieve this.

11.470 The potential impact of flood risk forms an important consideration in the assessment of the appropriateness of sites for inclusion within the LDP. In this regard, a precautionary approach will be adopted in the identification of sites for inclusion in the Plan. The consideration of any proposals in respect of flooding have regard to the provisions of PPW and TAN15: Development and Flood Risk which provides guidance on assessing developments at risk from flooding.

11.471 Proposals affected by flood risk will be required to submit a Flood Consequences Assessment as part of any planning application and the Council will consult with Natural Resources Wales (NRW). Where a site is in part impacted upon by flood risk, the developer will need to consider the impact of the risk on the developability of the remainder of the site. Where appropriate they should undertake the necessary evidential work (including a flood consequences assessment) to the satisfaction of NRW. Only less vulnerable development will be permitted within Zone C2. Regard should be had to Policy CCH4: Flood Risk Management and Avoidance as contained within this Plan.

11.472 Developments will be expected to exhibit good design principles to promote the efficient use of resources, including minimising waste and pollution generation, and maximising energy efficiency and the efficient use of other resources. Reference should be had to policy SP19 in relation to the waste and the waste hierarchy and minimisation of waste.

11.473 Development proposals will be expected to make full and appropriate use of land. The potential impacts of climate change must be central to the design process, including contribution that location, density, layout and built form can make towards climate responsive developments. In addressing Climate Change, the design of developments will also be expected to reflect the Nature Emergency and provide benefits net benefits for biodiversity.

11.474 The Welsh Government has set targets to decarbonise the public sector, and to achieve net zero carbon status by 2030. The Welsh Government is committed to using the planning system to optimise renewable energy and low carbon energy generation. PPW states that Local Planning Authorities can make a positive provision by considering the contribution that their area can make towards developing and facilitating renewable and low carbon energy [95]. Renewable energy targets have been set by the Welsh Government and include Wales generating 70% of its electricity consumption from renewable energy by 2030 [96].

11.475 Proposals, land uses, and land management practices will be encouraged where they help to secure and protect carbon sinks (including peatlands). Such an approach may enhance resilience to the impacts of climate change and reduce the causes thereof through the protection of carbon sinks.

11.476 PPW sets out clear guidance in terms of requirements for climate responsive developments and sustainable buildings. Reference should be made to the Practice Guidance – Planning for Sustainable Buildings (WG, 2014).

CCH1 - Renewable Energy within Pre-Assessed Areas and Local Search Areas

Proposals for large scale wind farms of 10MW and over will be permitted within identified Pre-Assessed Areas for Wind Energy, as identified in "Future Wales" subject to them meeting them meeting criteria set below.

Proposals for solar developments of 5MW and larger will be permitted in identified Local Search Areas, provided they do not have an unacceptable impact on visual amenity or landscape character and that they meet the criteria set below.

  1. The development will not have an unacceptable impact on roads, rail or aviation safety; electromagnetic interference to communications installations, radar or air traffic control systems, emergency services communications or other telecommunications systems;
  2. Proposals will not cause an unreasonable risk or nuisance to, and impact upon the amenities of, nearby residents or other members of the public, and will not result in unacceptable loss of public accessibility to the area;
  3. Proposals should be accompanied with appropriate mitigation measures where required, including satisfactory restoration of land following decommissioning.

CCH2: Renewable Energy Outside Pre-Assessed Areas and Local Search Areas

Proposals for renewable and low carbon energy development and associated infrastructure, will be permitted provided they accord with the following:

  1. The development will not have an unacceptable impact on visual amenity or landscape character through the number, scale, size, design and siting of turbines and associated infrastructure;
  2. The development will not have an unacceptable impact upon areas designated for their landscape value;
  3. Wind turbine developments should not have unacceptable cumulative impacts in relation to existing wind turbines components, those which have permission or are proposed;
  4. The development will not have an unacceptable impact on roads, rail, or aviation safety; electromagnetic interference to communications installations, radar or air traffic control systems, emergency services communications or other telecommunications systems;
  5. Proposals will not cause an unreasonable risk or nuisance to, and impact upon the amenities of, nearby residents or other members of the public, and will not result in unacceptable loss of public accessibility to the area;
  6. Proposals should be accompanied with appropriate mitigation measures where required, including satisfactory restoration of land following decommissioning.

11.477 Policy CCH1 and CCH2 apply to all renewable and low carbon energy developments that require planning permission, and set out the criteria against which proposals will be assessed. Such developments may include onshore windfarms, wind turbines, solar installations, biomass, energy from waste, hydro-power and combined heat, and power.

11.478 This Policy supports the Welsh Government's commitment to reduce our reliance on energy generated from fossil fuels and actively managing the transition to a low carbon economy.

11.479 Particular support will be given to renewable and low carbon energy projects which are developed by communities, or which will benefit the host community. Such schemes will be required to accord with the provisions of the above the policies.

11.480 Associated infrastructure developments that are required to assist the delivery of renewable and low carbon schemes will be supported, for example grid infrastructure and new energy storage facilities provided they accord with the policies of the Plan.

11.481 The WG identifies Pre-Assessed Areas for Wind Energy within "Future Wales". Within these areas, there is a presumption in favour of large-scale wind energy development, including repowering, subject to them meeting criteria set out within Policy 18 of Future Wales. The WG has modelled the likely impact of the landscape within these areas and has found them to be capable of accommodating development in an acceptable way. Large-scale energy developments are classed as Developments of National Significance (DNS). Planning applications for DNS will be determined by Welsh Ministers and include:

  • All on-shore wind generation of 10MW or more.
  • Other energy generation sites with a generating power between 10MW and 350MW.

11.482 Within Pre-Assessed Areas for Wind Energy, the Welsh Government has undertaken an assessment to identify these areas in order to provide certainty, in principle, where large-scale wind energy schemes would be acceptable.

Renewable Energy Assessment

11.483 A Renewable Energy Assessment (REA) was undertaken to inform and evidence Policies CCH1 & CCH2 and to identify the potential for renewable energy generation within the area. The method the REA has followed is set out by the Welsh Government, and its content will demonstrate how the Plan can assist in meeting renewable energy generation targets. The REA consists of a high-level, strategic assessment of the potential for different forms of renewable and low-carbon energy generation in different locations.

11.484 Tables 9 and 10 are taken from the REA and detail the realistic renewable energy contributions that could be made towards meeting a proportion of the total demand for energy within the Authority.

Energy Technology

Capacity Factor Assumed

Maxium* Potential 20033

Existing

Additional Target** 2033

Total Installed Capacity 2033 (MW)

Total Energy Generated 2033 (MWh)

Electrical Capacity (MWe)

Energy Generated (MWh)

Installed Capacity (MW)

Energy Generated (MWh)

Installed Capacity (MW)

Energy Generated (MWh)

Wind Power (existing include SSAs)

0.27

935.4

2,212,408

164.1

388,129

588.5

1,391,979

752.6

1,780,109

Biomass Energy Crop (CHP)

0.9

18.4

144,857

0

0

0

0

0

0

Energy from Waste with CHP

0.9

0.7

5,751

0

0

0

0

0

0

Hydropower

0.37

6.7

21,860

6.6

21,304

0.1

417

6.7

21,721

Landfill Gas

0.6

2.3

11,826

2.3

11,826

0

0

2.3

11,826

Solar PV Farms

0.1

24,768.6

21,697,316

126.5

110,851

305.2

267,311

431.7

378,162

Other including food waste, animal slurry, poultry litter, sewage sludge & sewage gas (AD with CHP)

0.42

3.3

12,046

1.0

3,679

1.3

4,857

2.3

8,536

Building Integrated

0.1

52.7

46,133

29.4

25,792

4.6

4,068

34.1

29,860

Total

-

25,788

24,151,498

330

561,534

900

1,668,633

1,230

2,230,214

Electrical energy demand 2008

923,148

Projected electrical energy demand

917,389

Percentage electricity demand met by renewable energy resource

61%

243%

* This is the maximum resource, it includes existing capacity and 100% of the potential.

** Targets are based on a percentage of maximum potential minus existing generation.

Table 9: Resource Summary for Renewable Electricity

Energy Technology

Capacity Factor Assumed

Maximum Potential * 2033

Existing

Additional ** Target 2033

Total Installed Capacity

Total Energy Generated

Heat Capacity

(MWt)

Energy Generated (MWh)

Installed Capacity (MWt)

Energy Generated (MWh)

Installed Capacity (MWt)

Energy Generated (MWh)

2033 (MW)

2033 (MWh)

Existing Biomass (CHP)

0.5

36.7

160,953

0

0

0

0

0

0

Biomass Boilers, Wood

0.5

36.3

159,197

0

0

0

0

0

0

Energy from Waste with CHP

0.5

1.5

6,390

0

0

0

0

0

0

Other including animal slurry, poultry litter, sewage sludge and sewage gas (AD with CHP)

0.5

3.7

15,990

0.2

986

2.0

8,736

2.2

9,722

Landfill Gas (with CHP)

0.5

0

0

0

0

0

0

0

0

Building Integrated

0.2

89.9

157,440

35.0

61,292

11.0

19,230

46.0

80,522

Total

35.2

62,278

13.0

27,966

48.2

90,244

Heat energy demand 2008

2,130,266

Projected electrical energy demand

1,493,795

Percentage thermal demand met by renewable energy resource

3%

6%

* This is the maximum resource, it includes existing capacity and 100% of the potential.

** Targets are based on a percentage of maximum potential minus existing generation.

Table 10: Resource Summary for Renewable HeatStrategic Search Areas

Pre-Assessed Areas for Wind Energy

Local Search Areas

11.485 The REA has assessed the potential for the Authority to deliver renewable energy, and has concluded that larger scale electricity generation from solar may be viable in parts of the Authority. These areas are set out in the REA, and are annotated on the Proposals Map as Local Search Areas (LSAs). LSAs are identified by applying a series of assumptions and by undertaking a mapping exercise that used layers of constraints. These areas are considered to be the least constrained areas within the Authority in order to deliver energy.

11.486 Three Solar PV LSAs have been identified as being suitable for schemes larger than 5MW. LSAs are identified to encourage developers to further investigate the potential for solar farms in these areas. Further site specific assessments will be required to assist any planning application for such developments.

11.487 Land within LSAs will not be safeguarded for energy generation, however, there will be a prioritisation for such developments where there are simultaneously competing interests. Developments will be required to minimise landscape and visual impacts.

LSA

LSA Area (KM2)

Potential Installed Capacity (MW)

Location

A

3.31

72.9

North East of Farmers

B

0.90

23.8

Mynydd Pencarreg

C

0.99

30.3

West of Talley

Other Technologies

11.488 Whilst the REA recognises that solar technologies have the most potential to deliver renewable energy within the County, proposals for other renewable energy technologies, including biomass, energy from waste, hydro power, and landfill gas will also be favourably considered, subject to meeting the provisions of these policies.

Locational Considerations

11.489 In assessing the cumulative impact of proposals, any unacceptable harm to the landscape, visual impact, noise, ecology, and surface and groundwaters will also be considered against other renewable energy and low carbon developments.

11.490 The amenity of residents and occupants of nearby properties should be considered, and any potential nuisance arising from the development and its associated infrastructure should be minimised. Proposals that would result in unacceptable nuisance arising from the operation of such development, such as noise, safety risk, radio, telecommunications or aviation interference, shadow flicker from wind turbines and glint and glare from solar panels will not be permitted.

11.491 Proposals will be required to ensure that they do not give rise to problems of highway safety or have a detrimental effect on the highway network as a result of construction and maintenance traffic. In siting development, existing bridleways, cycleways and footpaths shall be safeguarded with no permanent loss to their length and quality. Temporary and appropriate re-routing of public rights of way during construction will be required. Encouragement will be given to enhancing existing and providing new recreational facilities. Supplementary Planning Guidance willbe produced to expand on the provisions of Policy CCH1 and CCH2.

Policy CCH3 – Electric Vehicle Charging Points

Proposals for development will be required to include the installation of an electrical socket suitable for charging electric vehicles

  1. Residential Development

Houses

Where houses are provided with a garage, driveway or dedicated parking bay, one standard EV Charging Unit* should be provided per dwelling.

Flats (non-dedicated parking bays)

Where flatted development has integrated parking bays (under croft or parking court) proposals should include at least one dedicated bay with Fast EV Charging Unit (as a minimum) to service the development.

  1. Non-Residential Development

For non-residential developments where car parking is provided, at least 10% of those bays should have ULEV charging point. Rapid charging points for electric vehicles, should be provided where the local electricity network is technically able to support this.

11.492 National policy in the form of Planning Policy Wales sets an agenda which seeks to progress towards a shift to low or zero emissions means of road transport. In this respect, it recognises the role of electrical charging points in delivering that shift[[1]].

11.493 In taking this view it advocates adopting a sustainable approach which balances short-term needs against long-term objectives in relation to considerations such as reduced public exposure to airborne pollution, noise pollution etc. as part of the preparation of development plans.

11.494 As reflected in figure 12 below, Welsh Government policy sets out a sustainable transport hierarchy in relation to new development. This hierarchy recognises the role of Ultra Low Emission Vehicles in decarbonising transport, particularly in rural areas[[2]].

A diagram illustrating the sustainable hierarchy for planning in order: Walking and Cycling, Public transport, Ultra low emissions vehicles, Oher private motor vehicles.

Figure 12: The Sustainable Transport Hierarchy for Planning

11.495 This LDP recognises the diversity of communities across Carmarthenshire noting in particular the largely rural characteristics that typify much of its area. As reflected in PPW such areas often require different approaches to sustainable transport with new development needing to reflect local circumstances. For example, in developing the LDP strategy regard has been had to the potential for growth within rural areas and the identification of sites has had regard to the hierarchy including measures to encourage the use of Ultra Low Emission Vehicles. In this regard the above policy provides a clear focus on access to such vehicles as a positive policy objective for developments across the authority including in rural communities.

11.496 The Plan recognises the impacts of climate change and the move to decarbonisation with the need to promote access to alternative means of transport in accordance with the provisions of national policy. 35% of Carmarthenshire's residents live in rural areas with 65% of the land area classified as rural. The rural nature of much of Carmarthenshire has therefore been a key consideration in developing the strategy and the distribution of growth.

11.497 Rurality is a particular challenge for public transport, with the sparse populations in most rural areas and communities, served by a low frequency service.

11.498 Whilst it is recognised that the promotion of sustainable transport and indeed the eventual decarbonisation of transport can be achieved in many urban areas it must not further dislocate the connections between urban and rural communities[[3]]. In relation to our communities within rural areas the Plan seeks to deliver a sustainable development in a way which references and integrates new and alternative transport approaches including the promotion of ultra-low emission vehicles. Proposals for Flats (non-dedicated parking bays) should provide Rapid charging points where the local electricity network is technically able to support its provision and where it doesn't render the development unviable.

11.499 Where a home has a dedicated parking space in the form of a garage or a driveway/parking bay as a minimum requirement a 16 Amp socket should be provided either in a garage or in close proximity to a dedicated car parking place. In the absence of a garage, a wall mounted external socket should be provided.

11.500 Proposals for non-residential and commercial developments should include as a minimum requirement charging points for 10% of car parking spaces. In implementing this requirement regard will be had to the provisions of PPW Edition 11: Paragraph 4.1.39. Note:32 Amp socket. Commercial standalone charging units provide 2 chargers.

11.501 This provision of this policy seeks to future-proof new housing as part of the Councils commitment to tackling the declared climate change emergency. However, it is recognised that as capacity improves across the grid there may be circumstances where he current and projected capacity is unable to meet the demands arising from the policy in relation to a particular development. In such circumstance's application should be accompanied by robust evidence detailing any such issues including viability implications in the undertaking of any infrastructure improvements would have on the development. Reference should be had to the SPG for ULEV requirements in new developments.

CCH4: Water Quality and Protection of Water Resources

Development proposals must make efficient use of water resources and, where appropriate, contribute towards improvements in water quality. Proposals will be permitted where they do not have an adverse effect upon water resources, water quality, fisheries, nature conservation, public access, or water related recreation use in the County.

Where appropriate, SuDS must be implemented with approval required through the Sustainable Drainage Approval Body (SAB).

Proposals will be supported if they promote the safeguarding of watercourses through ecological buffer zones or corridors, protecting aspects such as riparian habitats and species, water quality, and providing for flood plain capacity.

Development will only be permitted if it can be demonstrated that there is no adverse effect on the integrity of phosphorus sensitive riverine Special Areas of Conservation (SACs). In the hydrological catchment area designated for riverine SACs, development creating wastewater discharges will be required to demonstrate there is no increase in phosphorus levels in the SAC. This can be achieved through implementation of mitigation measures and associated supplementary planning guidance. Where evidence demonstrates that adverse effects on the integrity of river SAC can be avoided or offset using mitigation, these must be agreed with the Council on a case-by-case basis, in consultation with NRW.

11.502 Water as a resource is extremely valuable and matters such as pollutants, flood prevention, groundwater and the protection and the enhancement of aquatic ecosystems are all important considerations reflected by legislation and guidance. The Water Framework Directive (2000/60/EC) (WFD) sets out the requirements in relation to the water environment and full regard should be had to its content.

11.503 Water pollution and consequent poor water quality can be from a single source, or from diffuse sources, such as from agricultural and urban runoff. The WFD has provided the opportunity to work with partner organisations, particularly Natural Resources Wales, to recognise the need to improve the whole water environment and promote the sustainable use of water for the benefit of both people and wildlife. River Basin Management Plans (RBMP) have been prepared which set out environmental objectives and standards, and a programme of measures by which they can be achieved.

11.504 Dŵr Cymru Welsh Water (DCWW) are responsible for the supply and treatment of water within the County. DCWW continue to meet increased demand for sewerage services through legislative and regulatory mechanisms, and supply/demand investment as set out within the Asset Management Programme (AMP). The AMP investment will support future growth and regeneration.

11.505 With regards to the Carmarthen Bay and Estuaries European Marine Site (CBEEMS), reference should be made to Policy INF4. The Burry Inlet SPG has been prepared to elaborate upon this Plan. It seeks to balance environmental and developmental considerations with a view to facilitating the delivery of growth within the revised LDP up to 2033.

11.506 The consideration of the environment is a key concept of sustainable development. Given that the impact of the Plan's allocations and commitments has already been considered by the Authority and deliverability established, this Policy simply provides a means to explore project or application-level matters on a site-by-site basis, as and where appropriate. This Policy seeks to provide the Authority with a means to consider the merits of proposals that come forward within the Plan period that are not currently identified within the Plan.

11.507 Water quality can be improved through measures such as effective design, construction and operation of sewerage systems, the use of GBI such as wetlands or greenspace for flood alleviation, and the use of SuDS. The promotion of good agricultural practice and the sustainable management of natural resources would also contribute to improvements in quality. Where appropriate and applicable to the planning system, this Plan identifies measures that can be taken forward. Reference is made to restoration as a key principle of the Water Framework Directive, such as the use of green engineering to restore the natural state and functioning of the river system by removing culverts to help support biodiversity, recreation, flood management and landscape development.

11.508 Proposals should seek wherever possible to incorporate water conservation techniques including rainwater harvesting and grey-water recycling.

11.509 The water resources requirements for Carmarthenshire are supplied entirely by DCWW, and the county lies within the Tywi conjunctive use system (Tywi WRZ). The most recent DCWW Resource Management Plan predicts that the Tywi WRZ will be in surplus throughout the period of the LDP, based on the projected increase in household numbers within Carmarthenshire of 14.6% between 2014 and 2039, with an increase from 82,751 to 89,532 between 2018 and 2033. This overall growth forecast exceeds the growth provided for in the LDP.

11.510 Development should seek to connect to the existing mains waste water infrastructure network in the first instance. Exceptionally, for development where it is not feasible to connect to public waste water treatment works (WWTW), any such proposals will need to justify why connection is not feasible and demonstrate compliance with WG Circular 008/2018 and Natural Resources Wales guidance for connections to private treatment works/septic tanks. New development proposals which place pressure on the capacity of the existing water supply and the water and sewerage treatment infrastructure must ensure the necessary infrastructure is in place or will be provided to serve them within an appropriate AMP programme. The increasing pressure on the infrastructure and on nature is an important consideration and new development will be expected to demonstrate that adequate consideration is given to the conservation of water resources and the protection of water quality.

11.511 Additional considerations apply to new development where there is the potential for increases in phosphorus, particularly because of waste water discharges, to have an adverse effect on the integrity of the Afon Cleddau, Afon Teifi, Afon Tywi and River Wye Special Areas of Conservation (SAC's), in line with the Habitats Regulations 2017 (as amended).

11.512 Increases in flows to mains WWTW can lead to increases in nutrients in watercourses because of discharges from the works. This policy seeks to manage waste water discharges arising from new development to ensure compliance with the Habitats Regulations 2017 (as amended) and known WWTW constraints. It applies to all riverine SAC's within Carmarthenshire including their tributaries.

11.513 In January 2021, Natural Resources Wales (NRW) set new phosphorus standards for riverine Special Areas of Conservation (SACs). In respect of Carmarthenshire, compliance tests undertaken by NRW found failure to meet these new standards in the Afon Cleddau and Afon Teifi.

11.514 To facilitate delivery of development which may be affected by this policy, the Council have prepared 'the 'Afon Tywi and Afon Teifi Phosphorus Reduction Strategy'. The document sets out the strategic approach for delivering phosphorus reductions in these catchments while also facilitating LDP growth and demonstrating that mitigation can be delivered in practice. The document sets out a range of measures, which have been agreed in consultation with NRW. The 'Afon Tywi and Afon Teifi Phosphorus Reduction Strategy' are living documents that will develop during the lifetime of the LDP, in consultation with NRW.

11.515 The delivery of the 'Afon Tywi and Afon Teifi Phosphorus Reduction Strategy' will be supported by the established of Afon Tywi, Teifi and Cleaddau Nutrient Management Boards (NMB's). These Boards which will have wider duties with a broader aim to deliver the long-term solutions on a catchment basis, both to address the issue of excessive phosphorus in rivers, generated from existing activities and land uses in the wider catchment, and to identify measures which might be relied upon to deliver wider benefits and net reductions across the catchment. These measures are outside the scope of the LDP and planning but are important for a robust approach to reducing phosphorus in Carmarthenshire's riverine SAC's. SPG will be produced to support the policy and mitigation approaches identified and to further elaborate on the role of s106 and developer contributions.

11.516 Matters relating to abstraction and water supply will need to be continually monitored, to ensure that the growth identified within this LDP is commensurate with the availability of the resource, over and above the protection allowed through this policy. Reference should be made to Carmarthen Bay Abstraction Licencing Strategy (2014).

11.517 The Council will continue to work with and consult NRW and DCWW on development proposals as appropriate. The Council will also further consult NRW on development proposals in the vicinity of river corridors and estuaries. Prospective developers should seek the advice and consent of NRW when appropriate. The requirement for an appropriate buffer adjoining both banks should be incorporated into any proposals to protect and encourage local biodiversity. The requirement is 8 meters where proposals relate to a main river, and 7 meters where proposals relate to an ordinary watercourse. Where proposals relate to a main river or ordinary watercourse, the requirement for an appropriate buffer adjoining both banks should be incorporated into any proposals to protect and encourage local biodiversity. In some circumstances, activity near watercourses will need consents including Flood Risk Activity Permits (FRAP) from NRW on main rivers and/or Flood Defence Consents from the LLFA on ordinary watercourses.

11.518 Proposals must satisfy the policies and provisions of the Plan as a whole. Specific reference may be made however to Strategic Policy 13 –Maintaining and Enhancing the Natural Environment, most notably in relation to sites of international importance to nature conservation. There are opportunities to acknowledge and embrace GBI as part of a placemaking approach.

11.519 Reference should be had to paragraph 11.536 of Policy PSD12 in relation to proposals that lead to increases in nutrient loading to the environment and potentially impact upon water and air quality.

CCH5: Flood Risk Management and Avoidance

Proposals for development located within areas of identified flood risk will only be permitted in exceptional circumstances, where:

  1. In areas at risk of fluvial, pluvial, coastal and reservoir flooding, where it can be demonstrated that the development meets the justification tests set out within National Policy[97] and is supported by robust technical evidential statement. However, only less vulnerable development will be permitted within Zone C2.
  2. Where it would not have a detrimental effect on the integrity of existing fluvial, pluvial, or coastal flood defences, or would impede access to existing and future defences for maintenance and emergency purposes;
  3. it would not lead to an unacceptable increase in the risk of flooding on the site or elsewhere will not be permitted; or,
  4. In areas subject to flood risk from localised sources, a drainage strategy is submitted which demonstrates to the Council's satisfaction that the impacts can be managed or alleviated.

Proposals should seek to incorporate effective and environmentally sympathetic flood risk mitigation measures, such as SuDS.

Proposals where there is the potential for floodplain reconnection should be incorporated into the development to ensure that opportunities are maximised, and that floodplain storage and water flow are not adversely affected.

11.520 The majority of Carmarthenshire's settlements are located by rivers or the coast. This reflects the historical development pattern and whilst the Plan cannot influence the spatial patterns of the past, it can help shape the decisions with the wellbeing of future generations in mind.

11.521 Whilst an understanding and recognition of river and tidal flooding has been implicit in planning practice for many years, there is now an increasing awareness of other sources of flooding – notably surface water. These other sources can impact upon settlements that are not close to a river or the coast.

11.522 The policy, and the strategic direction of the Plan recognises and reflects the need for a sustainable approach to flood risk. As such, this Plan priorities the protection of the undeveloped or unobstructed floodplain from development and seeks to prevent the cumulative effects of incremental development[98]. However, it also seeks to recognise that the dynamics of flood risk are complex and extend beyond the on-site connotations in respect of the siting of an individual development.

11.523 The Plan has regard to the provisions of national planning policy on flood risk and a precautionary approach has been taken in formulating policies which identify land use allocations and site specific proposals. The Plan also looks to recognise the dynamic nature of flood risk but also their vital contribution to the environmental qualities, biodiversity, green and blue infrastructure network, and the intrinsic landscape value of the County.

11.524 The contribution of natural channel processes is recognised, and the policy encourages floodplain reconnection. Consequently, developments and notably new infrastructure should be designed in a way which does not result in the net loss of floodplain storage, impede water flows, or increase flood risk elsewhere[99]. Regard should be had to the Working with Natural Processes (WWNP) Floodplain Reconnection Potential[100].

11.525 National policy in respect of flood risk is set out within Technical Advice Note 15: Development and Flood Risk (2004). The fluvial and tidal flood risk areas are set out on the accompanying Development Advice Maps (DAM). These areas are categorised as 4 zones, namely Zone A, Zone B, and more notably Zones C1 and C2 which are more susceptible to flooding.

11.526 Development will only be considered in areas at a high risk of flooding where it can be demonstrated that the site can comply with the justification and assessment requirements set out in TAN 15. Where a development is proposed in an area of identified flood risk an accompanying technical evidential statement must be provided to satisfy the provisions of TAN15 and show clearly that the new development will alleviate the threat and consequences of flooding.

CCH6: Renewable and Low Carbon Energy in New Developments

Development proposals that connect to existing sources of renewable energy, district heating networks, or use low carbon technology will be supported.

Development proposals that include: residential development of 100 or more homes; or development with a total floorspace of 1000sq m or more; will be required to submit an Energy Assessment to determine the feasibility of incorporating such a scheme, and where viable, would be required to implement the scheme.

Major developments that consume significant energy will be encouraged to facilitate the development of, and/or connection to proposed District Heating and Cooling Networks.

11.527 This policy seeks to encourage the incorporation of renewable and low carbon energy in all new developments.

11.528 An Energy Assessment will investigate the potential to incorporate and use low carbon technology, or to use existing sources of renewable energy or district heating networks. Assessments will be required to demonstrate how the development can make a contribution towards increased levels of energy generation from renewable or low carbon sources.

11.529 Further guidance will be provided in the Renewable and Low Carbon Energy Supplementary Planning Guidance.

CCH7: Climate Change – Forest, Woodland, and Tree Planting

Support will be given to proposals which seek the creation and protection of new (or the enhancement of existing) woodland, forests, tree belts and corridors, and where they promote the delivery of the national and local decarbonisation targets.

Support will be given to proposals that will deliver the multiple benefits associated with well-designed and well managed trees, woodlands, and forests (e.g., carbon sequestration, flood alleviation, improvements in air and water quality, nutrient mitigation, biodiversity and nature recovery, landscape, health and well-being, and amenity value).

Proposals should consider potential adverse effects upon the environment, cultural heritage, communities, and landscape, and, where appropriate, follow the mitigation hierarchy.

11.530 In 2021, Welsh Government has identified a target of increasing woodland cover in Wales by at least 5,000 hectares per annum to tackle the climate emergency [101]. This policy reflects this national objective and the commitment to the creation of a national forest. There are opportunities to create links to GBI, incorporate active travel facilities and enhance tourism and leisure opportunities, as well as promoting enhanced biodiversity, connectivity, and ecosystems resilience. Well-designed woodland planting can address both the Climate and Nature Emergencies, as declared by Welsh Government and the Council.

11.531 Trees are recognised as have multiple benefits, as outlined within the South West Wales Area Statement [102] and The Welsh Government's Strategy for Woodlands and Trees [103]. Trees, forest, and woodland provides a range of ecosystem services, such as improving air quality, providing a cooling effect and shade in summer, reducing noise, carbon sequestration and increasing resilience to climate change trees, forests and woodlands also offer aesthetic and amenity value, and can act as landmark features within our settlements and open countryside. They can contribute to nature conservation and increase biodiversity, and often have historic and recreational value. They also help to generate a feeling of 'well-being' and have an economic benefits.

11.532 The planting of trees, woodlands and forests can assist in tackling issues around flood risk, providing a soft engineering solution which can be undertaken in isolation or in conjunction with hard infrastructure (man-made structures). Proposals will be expected to demonstrate how they will contribute to flood risk alleviation.

11.533 Planting proposals that are designed to create woodlands and forests which will be managed using silvicultural systems that do not rely on clear felling, and which will be managed using low impact or continuous cover systems will be supported.

11.534 Proposals must be appropriate to the cultural and ecological character of the locality, in addition to the wider landscape. The Plan supports the planting of a type, scale, design, and species mix that is appropriate to the locality. Where appropriate, support may also be given towards land-use change for proposals which are design to mitigate the impacts of climate change and have multiple benefits (as highlighted above). As proposals should consider potential adverse effects upon the landscape, nature conservation, and the historic environment in line with the mitigation hierarchy, specific reference is made to NE1, NE2, and BHE2.

Strategic Policy – SP 17: Transport and Accessibility

Sustainable and deliverable development requires an integrated, accessible, reliable, efficient, safe, and sustainable transport network to underpin delivery. The Plan therefore contributes to the delivery of a sustainable transport system and associated infrastructure through:

  1. Reducing the need to travel, particularly by private motor car;
  2. Addressing social inclusion through increased accessibility to employment, services, and facilities;
  3. Supporting and, where applicable, enhancing alternatives to the motor car, such as public transport (including park and ride facilities and encouraging the adoption of travel plans) and active travel through cycling and walking;
  4. Re-enforcing the function and role of settlements in accordance with the settlement framework;
  5. Promoting the efficient use of the transport network;
  6. Enhancing accessibility to places of employment, homes, services, facilities, and other significant trip generating proposals at locations with access to appropriate transport infrastructure;
  7. The incorporation of design and access solutions within developments to promote accessibility;
  8. Providing walking and cycling routes, linking in with active travel and green and blue infrastructure networks;
  9. Providing for new technological solutions through Ultra Low Emission Vehicles Charging Points in new developments; and,
  10. Adopting a sustainable approach to the design, function, and layout of new development, including providing appropriate levels of parking.

11.535 The LDP and the Policy recognises the role that movement, connectivity, legibility, and their associated transport links play, particularly across a county as diverse as Carmarthenshire. The LDP strategy reflects and promotes the principles of sustainability and accessibility to essential services and facilities with the aim of achieving viable, self-supporting settlements and sustainable communities thus increasing social inclusion, cohesion and economic diversity and vibrancy. The settlement framework reflects the sustainability of settlements and the sustainable transport hierarchy by locating development where services, jobs, shopping and leisure facilities are located, but also recognising the diversity of the County and its rural communities including the rural areas. The County's transport network is diverse, connecting people and services through the highway, public transport, pedestrian and cycle routes, and PROWs (including bridleways).

11.536 In achieving the above, the strategy has regard to the highway and rail network along with accessibility to public transport and the potential for growth of settlements reflecting their levels of accessibility. In urban settlements the nature of their connectivity and frequency of transport is reflected through the settlement hierarchy. However, even within some of these settlements there is an inconsistency in the availability of an active travel network. Across the more rural areas and their communities, a lack of public transport access and the links afforded through active travel networks is inevitably more fragmented consequently this needs to be balanced against a development's potential contribution towards sustaining that community and the rural economy of the area.

11.537 The Plan will seek to guide development in the rural parts of the County to within and adjoining defined settlements, as opposed to sporadic countryside locations except where in accordance with the policies of this plan.

11.538 The Policy highlights the need for improvements to, and expansion of, Active Travel and public transport as part of proposals for development. This reflects the move away from the use of the private motor car. The Policy however also seeks to reflect the potential in terms of reducing harmful emissions through the introduction of Ultra Low Emission Vehicle Charging points in new development (reference should be made to Policy: CCH3).

11.539 This seeks in part to respond to the diversity of the County, accessibility and the aim of reducing the need to travel (and reducing CO2 emissions) and this remains a challenge for a large part of Carmarthenshire. This challenge is particularly evident when addressing the need to sustain rural areas, and to ensure that their communities do not suffer social exclusion. This must also relate to a realistic acceptance that the motor car remains an important means of travel in such areas.

11.540 Minimising travel may also be possible through an integrated transport strategy and the development of self-sustaining communities (including the availability of services and facilities) and the availability of alternatives through appropriate initiatives such as 'Bwcabus'. It is recognised that developing public transport as a viable and credible alternative to the use of the private car will assist in the reduction of congestion on key transport corridors. It is however also recognised that as technology progresses the potential impact or otherwise of the private car itself will change.

11.541 The LDP seeks to positively promote solutions which encourage access to technological changes, including electric charging points, in promoting a reduction in harmful emissions and enhancing social inclusion and accessibility.

11.542 Where a scheme is identified as requiring further feasibility, design, and preparation it is not identified within the LDP. This reflects the potential for an absence of clear indications of delivery.

11.543 The role of the County as a centre for cycling in Wales is recognised and the Council's Cycling Strategy will be considered and where appropriate reflected as the LDP progresses. In this respect, the role of the cycling network as an economic driver and leisure and tourism asset is recognised. Similarly, its contribution to the promotion of accessibility and benefits to our communities are also recognised, as is the contribution of the public footpath network and bridleways.

11.544 The following table identifies the primary road network, including trunk roads, and the core network. These routes are identified on the constraints map as corridors for movement.

Primary and Core Road Networks

Primary Road Network (corresponds to the identified Strategic network):

M4

A484

A40 (T)

A48

A476

B4310

A4138

A477 (T)

B4335

A474

A4878

B4336

A483 (T)

A4069

B4459

A48 (T)

A482

B4039

A486

A485

B4317

Core Road Network (corresponds to the identified Highway network):

A4066

B4304

B4556

A4068

B4306

B4301

B4299

B4300

B4303

B4333

B4328

B4314

B4310

B4312

B4297

B4337

B4308

B4302

B4368

TRA1: Transport and Highways Infrastructural Improvements

Transport routes, improvements and associated infrastructural facilities which deliver the objectives and priorities of the Joint Transport Plan for South West Wales (2015 – 2020) will be supported.

The improvements to the highway infrastructure as part of the Cross Hands Economic Link Road will be safeguarded with the route identified on the proposals map.

Proposals which maintain and enhance an integrated sustainable transport network will also be supported where they accord with the policies and provisions of this Plan. Development proposals which do not prejudice the efficient implementation of any identified improvement or scheme will be permitted.

11.545 The Regional Transport Plan identifies the Cross Hands Economic Link Road as a Transformational connectivity project for the Swansea Bay City Region.

11.546 Significant progress has been made in the delivery of the Cross Hands Economic Link Road (ELR) with Phase 1 opening as part of facilitating the Cross Hands East Strategic Employment Site. A further phase between Llandeilo Road and Penygroes is nearing completion. The phase between Black Lion Road and Penygroes has planning permission and provides an opportunity to facilitate further development of the former Emlyn Brickworks site in Penygroes is now open.

11.547 The ELR will ease congestion at the A48 Cross Hands Roundabout which is part of the Trans European Network (TENS) as well as improve safety at the ''6 ways'' junction in Gorslas. The scheme will provide a key link in the highway network to Llandeilo as part of the Swansea to Manchester trunk road.

11.548 The new link road from A40 dual carriageway to College Road near Parc Dewi Sant and Trinity St. David's University was opened in March 2019. This allowed access to education and employment sites as well as delivering infrastructure for future housing growth and facilitating the Yr Egin (S4C) development (see Policy SP6: Strategic Sites).

11.549 Ammanford Distributor Road Phase 2 is identified as part of a long-term proposal to assist in economic regeneration of the wider Ammanford and Amman Valley areas. Whilst the LDP does not safeguard or identify this route, it recognises its status within the Joint Transport Plan and the Council will monitor any progress towards its delivery. The absence of clear indications of delivery and a defined alignment dictate that it is not identified within the Policy or on the proposal map.

11.550 Further schemes identified within the Regional Transport Plan for Carmarthenshire 2015 – 2020 include those schemes listed for 2020 – 2030 and will be reviewed considering progress updates emanating from the Joint Transport Plan and future strategies:

  • Ammanford Economic Regeneration Infrastructure (Wind St/Tirydail) – Junction improvements (completed 2019)
  • Carmarthenshire Strategic Transport Corridors and Interchanges - ongoing improvements to main Bus Corridors.
  • Carmarthenshire Walking and Cycling Linkages - Continued development of a comprehensive network of Walking & Cycling Linkages such as the Amman Valley Cycleway, Carmarthenshire employment routes and the National Cycle Network to improve access to employment, education and other services as well encouraging tourism and healthy lifestyles.
  • A4138 Access into Llanelli incorporating Llanelli/M4 Park and ride/share – Subject to further design and implementation of preferred options from 2019/20.
  • Towy Valley Transport Corridor (Towy Valley Cycleway) - Cycleway with links to key attractions including the market towns of Carmarthen and Llandeilo with a phased approach to implementation with the initial phase under construction.
  • Llanelli Integrated Transport Interchange – In the Station Road/Copperworks Road areas, this represents a key focal point for transport interchange between a number of modes including the Town's railway station, key commercial bus routes and a park and ride (rail) facility.
  • Sustainable Travel Centres - May include EV charging infrastructure, targeted home zones, interchange improvements, cycle racks and employment centred sustainable travel routes
  • Access to Pembrey Country Park - Replace/upgrade the existing single lane road over the Rail Bridge which currently serves Pembrey County Park (PCP).

TRA2: Active Travel

Proposals which enhance walking and cycling access by incorporating the following within the site, and/or making financial contributions towards the delivery of off-site provision, will be supported:

  1. Permeable, legible, direct, convenient, attractive and safe walking and cycling routes connecting the development to: surrounding settlements; public transport nodes; community facilities; commercial and employment areas; tourism facilities; and, leisure opportunities;
  2. Improvements, connections, and/or extensions to: footpath network and existing PROWs (including bridleways); cycle network and routes; Safe Routes to School; and, routes forming part of the Green and Blue Infrastructure network; and
  3. Facilities that encourage the uptake of walking and cycling, including: appropriate signage; secure and convenient cycle parking; and changing and associated facilities.

Proposals which have a significant adverse impact on PROW or existing routes identified through the Active Travel (Wales) Act 2013 will be expected to contribute to the delivery the Council's Active Travel Plan.

11.551 Development proposals must seek to maximise accessibility by walking, cycling and public transport, by prioritising the provision of appropriate on-site infrastructure and, where necessary, mitigating transport impacts through the provision of off-site measures, such as the development of active travel routes, bus priority infrastructure and financial support for public transport services[104].

11.552 The Plan seeks to promote accessibility to alternative means of transport to help reduce car use, and to support the Council in fulfilling its legal duty under the Active Travel (Wales) Act 2013 to develop, improve and maintain local walking and cycling networks. Proposals will be encouraged to use Standards of good practice including the Active Travel Act Design Standards and other relevant guidance to ensure the design principles reflect and deliver Active Travel. Regard should also be had to the Council's Highways Design Guide.

11.553 In utilising this policy regard should be had to the provisions of the LDP on placemaking and green and blue infrastructure. In this respect, the Plan emphasises a commitment to quality environments and design, with active travel and walking and cycling as important components.

11.554 Proposals within rural areas should reflect the national sustainable placemaking outcomes and, where possible, offer good active travel connections to the centres of settlements to reduce the need to travel by car for local journeys[105].

TRA3: Gwili Railway

Proposals will be permitted where they do not prejudice the following in relation to the Gwili Railway:

  1. Proposed Gwili Railway Extension (1)Proposed Gwili Railway Extension (2)The extension of the Gwili Railway northwards to Llanpumsaint;
  2. The provision of a new station at Glangwili, Carmarthen.

11.555 Proposals for the Gwili Railway will be considered in light of their effect on local traffic conditions, on the quality of the environment and infrastructural requirements.

11.556 The Gwili Railway is an important tourist attraction and the Council will support the long-term proposals to extend the line northwards ultimately to Llanpumsaint and the provision of a new station as identified within the Policy.

11.557 The safeguarded areas and routes are shown on the Proposals Map.

TRA4: Redundant Rail Corridors

Proposals for development which do not prejudice the re-use of redundant rail corridors for potential future recreational and rail development purposes will be supported.

Proposals should also recognise the importance of redundant rail corridors as wildlife corridors and opportunities for expanding the network of green and blue infrastructure.

11.558 The Plan area has a number of former railway lines which offer considerable benefit for recreational activities including cycle routes, footpaths and bridleways. Consideration also needs to be given to the potential future re-use of rail routes when considering proposals, which may impact upon the continuity and availability of the route.

TRA5: Highways and Access Standards in Development

Proposals for development will be permitted where they:

  1. Incorporate the necessary access standards reflecting the road classification and conditions;
  2. Include appropriate visibility splays and design features necessary to ensure highway safety and that the ease of movement is maintained, and enhanced where required;
  3. Do not generate unacceptable levels of traffic which has a detrimental impact on the surrounding road network, highway safety, or would cause significant harm to the amenity of residents.
  4. Will not result in offsite congestion in terms of parking or service provision.

11.559 Where a development proposal is likely to raise issues in respect of highway capacity of the network, contributions may be required to facilitate appropriate works as part of the granting of any permission.

11.560 In using this policy, reference should also be made to Policy PSD1: Sustainable and High-Quality Design and to the content of the Highways Design Guide which will be adopted as SPG.

Strategic Policy SP 18: Mineral Resources

The County's identified mineral resources will be sustainably managed by:

  1. Ensuring an adequate supply of minerals, including maintaining an adequate landbank of permitted aggregate reserves (a minimum 10 years for hard crushed rock, and a minimum 7 years for sand and gravel) throughout the Plan period;
  2. Encouraging the efficient and appropriate use of high quality minerals and maximising the potential for the re-use and recycling of suitable minerals as an alternative to primary won aggregates;
  3. Safeguarding minerals infrastructure, and areas underlain by minerals of economic importance where they could be worked in the future, to ensure that such resources and infrastructure are not unnecessarily sterilised by other forms of development;
  4. The use of buffer zones to reduce the conflict between mineral development and sensitive development;
  5. Securing appropriate restoration which can deliver specific environmental and community benefits.

An 'Area of search' for Sand and Gravel has been defined on the Proposals Map which will form the basis for future exploration and production in order to satisfy the broader subregional requirements. [106]

11.561 The LDP will seek to ensure that the County provides positively for the working of mineral resources to meet society's needs, and that such resources and minerals infrastructure are safeguarded from sterilisation. In doing so, the LDP seeks to ensure that a proper balance is struck between this fundamental requirement, the need to ensure a prudent use of these finite resources, and the protection of existing amenity and the environment.

11.562 Carmarthenshire has a wide variety of mineral resources as a result of its complex geology. The main feature in the south of the County is the broad sweep of the Coal Measures outcrop, fringed to the north by Carboniferous Limestone. Limestone quarrying is the largest of the extractive industries in the County. The northern parts of the County are underlain by older rocks of Ordovician and Silurian age, mainly sandstones, shales and slates. The economic significance of these is variable.

11.563 Regional Technical Statement for the North Wales and South Wales Regional Aggregate Working Parties– Second Review (RTS2) (September 2020) sets out the contribution that each constituent local authority should make towards meeting the regional demand for aggregates (both hard crushed rock, and sand and gravel).

11.564 For crushed rock, Carmarthenshire forms part of the Swansea City Sub-region, along with the local authorities of Swansea and Neath Port Talbot. Although at present, Swansea is unable to demonstrate an inability to meet RTS2 apportionments, there are more than sufficient reserves within NPT and Carmarthenshire to take up the joint apportionment within this period without resulting in under provision. A statement of sub-regional collaboration (SSRC) has been produced which demonstrates how the constituent Authorities satisfy the requirements of RTS2 in respect of future crushed rock provision.

11.565 In terms of sand and gravel provision, it must be noted that the First Review of the RTS (RTS1) suggested that there would be merit in developing a combined approach to future apportionments and allocations between Pembrokeshire, Ceredigion and Carmarthenshire. Although Carmarthenshire is in a separate sub-region (primarily because of the market for crushed rock in the Swansea area), it is recommended in RTS2 that these joint working arrangements [suggested in RTS1] should continue, with regard to sand & gravel. Therefore, a joint approach is being pursued by Pembrokeshire, Ceredigion and Carmarthenshire for the provision of the allocation requirement for 3.626 million tonnes over the period up to 2038.

11.566 In the event that the allocations for sand and gravel in the three constituent authorities are not sufficient to meet the 3.626 million tonnes over the period up to 2038, an 'area of search' for sand and gravel has been identified on the proposals map (with further areas being identified by Pembrokeshire and Ceredigion in their respective Revised LDPs). Furthermore, a statement of sub-regional collaboration (SSRC) is being produced which will demonstrate how the constituent Authorities will satisfy the requirements of RTS2 in respect of future sand and gravel provision.

11.567 In respect of working the resource within the area of search, this will not be carried out within 100m of residential properties. Proposals for extraction will also need to accord with the criteria set out within Policy MR1 Mineral Proposals. On those elements of the area of search that contain grade 3a agricultural land, the need for extraction will be considered in accordance with paragraph 3.59 of PPW Ed.11.

11.568 There is a clear direction from the Welsh Government to avoid the continued extraction and consumption of fossil fuels. Therefore, the Authority does not propose to safeguard coal resources. The Council is required to notify the Welsh Government in the event of proposals for coal or petroleum operations that it is not minded to refuse.

MR1: Mineral Proposals

Proposals for mineral extraction will be permitted where there is a proven national, regional or local need for the mineral which cannot be met from existing sources or from secondary or recycled material, and where they would not result in any significant adverse impacts upon public health, the environment, local amenity and the local transport network. Applications for minerals proposals will be assessed against the following criteria:

  1. Suitable access and transport routes have been identified and the potential for minerals to be transported by means other than road has been adequately assessed;
  2. Noise is demonstrated to be within acceptable levels;
  3. The best practicable means are identified to control dust, smoke, fumes and to ensure that operations do not cause a deterioration in local air quality or an unacceptable impact on public health;
  4. Blasting is controlled within acceptable levels;
  5. Potential impacts on groundwater resources, surface water resources and water supplies are identified and demonstrated to not cause adverse effects and be within acceptable levels;
  6. There are no unacceptable adverse impacts upon sites of nature conservation importance and ecological features, and adverse impacts upon sites of historic, cultural and landscape importance are identified and demonstrated to be minimal;
  7. Effective mitigation measures proposed to minimise any potential effects from subsidence or land instability have been identified and demonstrated to the Council's satisfaction;
  8. Adverse impact on landscape character and visual amenity is not significant;
  9. Opportunities for the re-use and/or recycling of mineral waste are maximised;
  10. Satisfactory proposals have been submitted for restoration, landscaping, after use, and after care of the site.
  11. Effective measures should ensure that utilities infrastructure is protected.

11.569 The purpose of the policy is to maintain a balance between meeting national, regional and local demand for minerals and minimising the potential adverse effects that could result from such operations. Minerals extraction can have positive effects on local areas and communities by providing a source of employment and contributing to the local economy, but at the same time measures have to be put in place to protect local health and amenity and the environment from any negative effects that may result. Particular consideration should be given to the potential for impacts to groundwater and water resources and also to public health, the environment (including landscape/townscape and historic designations), local amenity, the local transport network and other environmental parameters.

11.570 It is essential to plan mineral operations which are environmentally acceptable from the outset. The use of planning controls, such as conditions, legal obligations, and monitoring and enforcement can ensure effective control of operations at mineral sites. The controls should be used where they are necessary and relevant to the individual circumstances under consideration. Acceptable levels of impact will vary at different mineral sites and will be dependent upon a number of factors. It will be up to the Authority to determine these in respect of each individual planning application.

MR2: Mineral Buffer Zones

Provision has been made for Buffer Zones around all sites with extant planning permission for mineral working.

New sensitive non-mineral development will not normally be permitted within the identified buffer zones. All buffer zones have been identified on the proposals map.

11.571 Buffer zones are used to provide areas of protection around permitted and proposed mineral workings where new development which would be sensitive to adverse impact, including residential areas, hospitals and schools, should be resisted. The identification of buffer zones will ensure that there is clear guidance on the proximity of mineral operations to sensitive land uses, and that the potential impact of mineral workings is recognised and planned for in the area around the existing and proposed mineral operations.

11.572 The buffer zone distances of 200m (minimum) around hard rock quarries and 100m (minimum) around sand and gravel extraction sites are set out in MTAN1: Aggregates,[107] and 500m buffer zones around coal working sites is set out MTAN2: Coal.[108] Exceptions to these distances will be considered in accordance with the provisions set out in MTANs 1 & 2.

MR3: Mineral Safeguarding Areas

Planning permission will not be granted for development proposals where they would permanently sterilise resources of aggregate identified within the mineral safeguarding areas on the proposals map unless:

  1. The applicant can demonstrate that the extraction of the mineral is impracticable, uneconomic or environmentally unacceptable (including compromising amenity and social considerations); or
  2. The mineral resource has already been extracted; or
  3. The mineral can be extracted satisfactorily prior to the development taking place; or
  4. The development is of a temporary nature and can be completed and the site restored within the timescale that the mineral is likely to be needed; or,
  5. The nature and location of the development would have no significant impact on the potential working of the resource.

11.573 PPW stresses the importance of safeguarding mineral resources that meet society's needs now and in the future. This, however, does not necessarily indicate a presumption in favour of working the mineral deposits, merely that the location of the mineral is known. The safeguarded areas shown on the Proposals Map relate to the British Geological Survey (BGS) Aggregate Safeguarding Map for South West Wales.

11.574 Development on safeguarded areas may only proceed if the developer can satisfy any of the above criteria. When viewed with other relevant policies of the plan (particularly MR1), mineral extraction will not be appropriate within or adjacent to settlement development limits. However, in cases where other forms of development are proposed in such areas (and a mineral resource worthy of safeguarding has been identified), prior extraction of the resource should be considered as part of the application whilst ensuring that any operation does not have any unacceptable adverse impacts upon the environment, human health, and local amenity.

11.575 With regard to aggregates (hard rock, and sand and gravel) identified and safeguarded on the proposals map, the extraction of mineral resources will generally not be acceptable within 200 metres of identified settlements in the LDP (for hard rock) and within 100 metres (for sand and gravel).

11.576 At present there are no marine wharves within the County. Potential future proposals, where acceptable, will be protected to safeguard marine sand and gravel supply route(s) into the area. Llanelli Sands' operational site in Burry Port (together with the associated 'marine landing site') is identified on the Proposals map, and within Appendix 4 (Minerals Sites), and safeguarded accordingly.

Strategic Policy – SP 19: Sustainable Waste Management

Provision will be made to facilitate the sustainable management of waste through:

  1. The allocation of adequate, appropriate land to provide for an integrated network of waste management facilities;
  2. Supporting proposals for waste management which involve the management of waste in accordance with the ranking set out within in the waste hierarchy;
  3. Supporting proposals which have regard to the nearest appropriate installation concept and principles of proximity and self-sufficiency[109];
  4. Supporting proposals for new in-building waste management facilities at existing and allocated industrial sites (B2 use) which are suitable for waste management facilities;
  5. Acknowledging that certain types of waste facility may need to be located outside the development limits of settlements;
  6. Ensuring that provision is made for the sustainable management of waste in all new development, including securing opportunities to minimise the production of waste.

Development proposals must ensure that:

  1. There are no significant, adverse effects upon public health, the environment, local amenity and the local transport network;
  2. The proposal is compatible with any neighbouring uses or activities.

The co-location of waste management facilities to enable the development of heat networks will be supported, subject to the above criteria; and

Waste related proposals must be supported by an appropriate Waste Planning Assessment.

11.577 Planning issues which must be taken into account when preparing applications for waste developments are set out within Annex C of Technical Advice Note (TAN) 21 Waste (2014). Applications will need to demonstrate how the proposal will contribute towards meeting the objectives in the National Waste Strategy Towards Zero Waste and the Collections, Infrastructure and Markets Sector Plan (CIMSP). A Waste Planning Assessment (WPA) should be submitted with all applications for a waste facility classified as a disposal, recovery, or recycling facility. The WPA should be appropriate and proportionate to the nature, size and scale of the development proposed. Further advice is contained within Annex B of TAN 21 Waste.

11.578 Applicants will need to demonstrate how the waste hierarchy has been addressed in their development proposal. Departure from the waste hierarchy will need to be justified through the use of Life Cycle Assessment. This will need to be documented as part of the WPA submitted by the applicant.

11.579 Although it is difficult to accurately predict the future needs for residual mixed waste treatment, recovery and for the disposal of waste, the CIMSP sets out the continued need for increased recovery of residual mixed waste which are incapable of being recycled. Therefore, a need exists to develop more residual waste treatment and recovery facilities and to ensure that sufficient disposal capacity is maintained at a level appropriate to support the overall aims of Towards Zero Waste. Reference is made to the annual Waste Planning Monitoring Reports (WPMRs) for the South-west Wales region (as identified in TAN 21) which provide information and recommendations on cross border working, particularly in respect of how the region's residual waste is being managed and whether there is sufficient remaining landfill capacity.

11.580 General employment sites (B2 uses) may be suitable for many of the future 'in-building' waste facilities. These facilities would cater for industrial and commercial waste as well as local authority collected waste. Being mindful of the need to divert waste away from landfill, the opportunities offered by in-building energy from waste facilities to harness energy for heat and/or power from residual municipal waste will be permitted provided that they are compatible with neighbouring uses and meet the criteria set out above. Proposals that incorporate combined heat and power that could contribute toward district heating schemes for large developments will be encouraged. Those sites with the potential to accommodate in-building waste facilities are listed in Policy: SP6. This is in addition to the existing waste management facilities within the County which are listed in Appendix 8. Many of these, such as the Nantycaws waste management site, are well established and are likely to continue to play a role within the Plan period.

11.581 Proposals involving the recycling and re-use of inert construction and demolition wastes as well as mineral and industrial wastes, will be encouraged. Existing active mineral sites (identified on the LDP Proposals Maps, and listed in Appendix 4), or appropriate construction sites will be the preferred locations. B2 employment land allocations might also be options, for example where in-building waste transfer stations or materials recovery facilities capable of dealing with such waste can operate. Compatibility with existing employment uses will be a critical factor when assessing proposals for recycling inert wastes on B2 sites.

11.582 B2 employment sites are not suitable locations for certain types of 'open-air' waste operations, particularly landfill or open-windrow composting. Other types of waste facilities, such as civic amenity (CA) sites, are also sometimes more suited to locations away from built up areas. Proposals for open-windrow composting may be considered suitable as part of farm diversification schemes.

WM1: Sustainable Waste Management and New Development

Development proposals must ensure that provision is made for the sustainable management of waste in all new development, including storage, recycling and by securing opportunities to minimise the production of waste.

11.583 New developments have the opportunity to make a contribution towards meeting the targets set out within the National Waste Strategy for Wales Towards Zero Waste (TZW) by incorporating adequate facilities and space for the collection, composting and recycling of waste materials into their design. Applying such an approach will also help to encourage participation in recycling at home, at work and public spaces.

11.584 There are a number of key issues that will need to be addressed in connection with waste management that apply to all types of development:

  • Separation of waste for recycling: incorporating recycling facilities will help to ensure that waste diversion is easy and convenient to implement;
  • Access: it is important to design easy and convenient access for both users of waste facilities and those who collect waste. This will also help in promoting recycling and make economic provision of waste services more achievable;
  • Pollution: It is essential that any design and layout considers the potential impact of these facilities on neighbouring properties, in terms of potential odours, noise and the attraction of vermin;
  • Safety: Security must be addressed at the design stage to ensure any negative impact on human health is minimised;
  • Visual impact: it is important to minimise the visual impact of waste and recycling bins and to ensure that they do not detract from the amenity and landscape quality of the area.

11.585 The Council is keen to work with developers to see innovative methods of waste management (including on-site treatment where practicable) incorporated into new residential and other developments.

11.586 Developers should ensure sufficient space is incorporated within their development for the placement of waste containers at the kerbside on collection days, and that the route between the storage area and collection point is free from steps, kerbs or other obstructions. Road design and layout standards must take account of the Council's access requirements of waste collection vehicles.

11.587 All businesses are required to have adequate separation and storage facilities for waste. The storage area must meet health and safety requirements for access, lighting and ventilation and also be secure to prevent vandalism and fly tipping. It is also recommended that any storage is developed in consultation with the proposed service provider. Commercial premises will also be expected to recycle, therefore multiple bins/storage containers are likely to be required.

WM2: Landfill Proposals

Proposals for new landfill sites will only be permitted where they can accord with the following:

  1. Additional capacity is required within the Mid and South West Wales region (evidence must be provided to show where the material will be sourced):
  2. The proposal conforms with the waste hierarchy, the concept of the nearest appropriate installation and self-sufficiency;
  3. There would be no significant adverse impact on:
    1. The natural heritage, cultural and historic environment;
    2. The geology and hydrogeology of the site;
    3. Controlled waters, including water quality and quantity;
    4. The amenities of neighbouring occupiers, including the effects of traffic movement and the generation of noise, dust, fumes and odours;
    5. The local highway network, including access, and highway safety;
    6. Public safety, health and well-being;
    7. The visual amenity of the site and its environs;
    8. Public utilities infrastructure and services; and
    9. Good quality agricultural land (Grades 1, 2 or 3a)

The method of restoration and aftercare, and the proposed after use will need to form part of the landfill proposal and be completed within the lifetime of any permission granted.

11.588 The Welsh Government has a long term aim of eliminating landfilling as far as possible. TZW sets limits on the total amount of residual municipal waste and industrial and commercial waste sent to landfill. However, it is recognised that disposal to landfill will continue in the short to medium term. This is partly due to the way in which waste is collected, the infrastructure capacities currently in place to deal with waste, and the existence of legacy wastes (such as asbestos) and incineration residues, where no safe alternative to ultimate landfill disposal currently exists.

11.589 Each year a Waste Planning Monitoring Report (WPMR) is produced for the Mid and South West Wales region which identifies the amount of landfill capacity (voidspace) remaining within the region as a whole. The level (set out within TAN 21 Waste) at which the void in each region is considered sufficient and should be maintained is 5/7 years. Whilst the latest WPMR for the 2018/19 period identifies sufficient capacity, if the situation changes in subsequent years then potential locations for a new landfill site will need to be considered that would serve the requirements of the region.

11.590 The last remaining landfill site in Carmarthenshire, at Nantycaws, has remaining capacity but is not operational at the present time. It is not clear if or when this situation is going to change during the course of the Plan. In terms of the local authority's collected waste, the residual element is presently being disposed of in landfills, and other treatment facilities, outside of the County (both within and outside the Mid and South West Wales region).

11.591 Proposals for new landfill sites will be evaluated in the context of the criteria set out above and with regard to detailed planning considerations set out within TAN 21 Waste - Annex C. Proposals will be carefully assessed to ensure landfill sites do not pose a serious risk to public health, the environment and neighbouring uses.

11.592 Where appropriate and feasible, developers may be required to enter into a S106 Agreement to ensure that proposals include measures to generate energy from landfill gas where methane might otherwise escape into the atmosphere. Ensuring that the restoration and aftercare of a completed landfill site (or cell) takes place to a standard agreed by the Council will also be secured via a S106 Agreement. The final landscaping must be completed by the end date of the planning permission.

11.593 An EIA must be submitted for all applications falling within Schedule 1 of the EIA Regulations and, where appropriate, will be requested for any development falling within Schedule 2.

WM3: Agricultural Land – Disposal of Inert Waste

Proposals for the deposit of imported inert waste materials for the improvement of low-grade agriculture land will only be permitted where:

  1. It can be demonstrated that the improvement sought is reasonably necessary for the purposes of agriculture within the holding;
  2. The volume of waste to be deposited is the minimum necessary to achieve the improvement sought;
  3. Arrangements are in place for the separation and removal of any non-inert waste, or contaminated soils, received in error;
  4. The extent, thickness and final surface treatment of the deposit is compatible with the surrounding landform.

11.594 The purpose behind the disposal of inert waste by its deposition on farmland and elsewhere has in the past, on many occasions, been to dispose of waste in the cheapest way possible and avoid payment of landfill tax, rather than to improve agricultural land quality or facilitate other necessary development.

11.595 The main purpose of the proposal should clearly be to improve land quality rather than the disposal of waste. In this regard, the quantity of waste to be deposited should be the minimum required to achieve the proposed improvement. Where this is not the case, the Council will consider the proposal under Policy WM1 above.

11.596 Inert waste is generally sourced from construction, demolition and excavation operations and can include materials such a soils, bricks and concrete. The beneficial use of this waste for agricultural land improvement, where this is necessary, can be categorised as a waste recovery operation. Waste recovery can be defined as any operation the principal result of which is waste serving a useful purpose by replacing other materials which would have otherwise been used to fulfil a particular function, or waste being prepared to fulfil that function, in the plant or wider economy.

11.597 The applicant should demonstrate to the Authority's satisfaction that the proposed waste development is a 'recovery operation'. The Authority will determine whether there is a genuine need for the development, or if the activity is in fact for the 'disposal' of waste to land for any other reason. The key consideration for 'recovery operations' is that the development would have occurred in any event even if the waste was not available. If this is not the case then the operation would be classified as disposal.

11.598 The proposal must demonstrate that the quantity of waste to be used is the minimum amount required and any resulting changes to the landform would be sympathetic to the area. The development should respect the nature conservation and amenity interests of the site and surrounding area, including landscape character and visual amenity.


[49] Planning Policy Wales: Edition 11

[50] Planning Policy Wales: Edition 11

[51] Technical Advice Note (TAN) 2: Planning and Affordable Housing 2006 – Paragraph 5.2

[52] Carmarthenshire Rural Needs Study 2019

[53] https://www.swanseabaycitydeal.wales/projects/life-science-and-well-being-village/ /

[54] https://www.carmarthenshire.gov.wales/home/business/development-and-investment/delta-lakes/#.XX-L4uaou70

[57] Commercial Property: Market Analysis and Potential Interventions (March 2020)

[58] (TAN 6 Para 3.1.3)

[59] Carmarthenshire's Wellbeing Objectives 2018-18

[60] Cymraeg 2050 A Million Welsh Speakers, Welsh Government (2017)

[61] Carmarthenshire County Council (2014) Supplementary Planning Guidance Welsh Language

[62] Community Infrastructure Levy Regulations 2010 (as amended); Planning Policy Wales; Welsh Office Circular 13/97 Planning Obligations

[63] Planning Policy Wales: Edition 11

[64] Health Impact Assessments A Practical Guide - Wales HIA Support Unit

[65] Planning Policy Wales: Edition 11

[66] Housing (Wales) Act 2014

[67] Welsh Government Circular 005/2018: Planning for Gypsy, Traveller and Showpeople Sites

[70] Planning Policy Wales: Edition 11 - Section 4

[71] Planning Policy Wales: Edition 11

[75] Welsh Government Written Statement: Noise and soundscape action plan 2018-2023

[76] Planning Policy Wales: Edition 11 (paragraph 4.3.44 and 6.7.5)

[77] Planning Policy Wales: Edition 11

[78] Planning Policy Wales: Edition 11.

[79] https://datamap.gov.wales/layers/inspire-nrw:NRW_TRANQUIL_AREAS_2009

[80] Planning Policy Wales: Edition 11

[83] Planning Policy Wales Edition 11

[85] TAN6: Planning for Sustainable Rural Communities - Paragraph 4.13.1

[86] Planning Policy Wales: Edition 11

[88] Chief Planning Officer' Letter - Guidance on securing biodiversity enhancements in development proposals 2019.

[90] Caeau Mynydd Mawr Special Area of Conservation: Draft Supplementary Planning Guidance https://www.carmarthenshire.gov.wales/media/1223332/caeau-mynydd-mawr-special-area-of-conservation-draft-spg-2020.pdf

[91] Planning Policy Wales: Edition 11 – Paragraphs 6.1.18 and 6.1.19. Further information on the consideration of historic parks and gardens in the determination of planning applications can be found in Technical Advice Note 24: The Historic Environment (https://gov.wales/topics/planning/policy/tans/tan-24/?lang=en) and Cadw best-practice guidance: Managing Change to Registered Historic Parks and Gardens in Wales (http://cadw.gov.wales/docs/cadw/publications/ historicenvironment/20170531Managing%20Change%20to%20Registered%20Historic%20Parks%20&%20Gardens%20in%20Wales%20 26922%20EN.pdf).

[92] Further information on the register of historic landscapes and its use in the determination of planning applications can be found in Technical Advice Note 24: The Historic Environment. https://gov.wales/topics/planning/policy/tans/tan-24/?lang=en

[93] Further information on the consideration of archaeological remains through the planning process, including desk-based assessment, field evaluation and the consideration of unforeseen archaeological remains, can be found in Technical Advice Note 24: The Historic Environment. https://gov.wales/topics/planning/policy/tans/tan-24/?lang=en

[94] Planning Policy Wales: Edition 11 – Paragraphs 6.1.30 - 6.1.32.

[95] Planning Policy Wales: Edition 11 (paragraph 5.9.1)

[[1]] Planning Policy Wales: Edition 11

[[2]] Planning Policy Wales: Edition 11

[[3]] Re-energising Wales: Decarbonising Transport in Wales – Institute of Welsh Affairs (June 2018)

www.iwa.wales/wp-content/uploads/2018/06/IWA_Decarbonising_Transport-1.pdf

[97] As identified within Technical Advice Note 15 (2004) – Development Advice Maps

[98] Planning Policy Wales Edition 11

[99] Planning Policy Wales Edition 11

[100] http://lle.gov.wales/catalogue/item/WWNPFloodplainReconnectionPotentialWales/?lang=en

[104] Planning Policy Wales Edition 11

[105] Planning Policy Wales Edition 11

[106] As set out in the Regional Technical Statement for the North Wales and South Wales Regional Aggregate Working Parties– Second Review (RTS2) (September 2020).

[107] Minerals Technical Advice Note 1: Aggregates

[108] Minerals Technical Advice Note 2: Coal

[109] Article 16 of the EU Waste Framework Directive, 2008

For instructions on how to use the system and make comments, please see our help guide.