Second Deposit LDP
Appendix 5: Active Travel Routes
CCC INM Route List |
||||
Scheme Number |
Location |
Term |
Type |
Detail |
7.21 / A1 |
Ammanford |
Short Term |
Pedestrian |
ERM 7.21 Fail - Footpath requires surface upgrade |
A2 |
Ammanford |
Aspirational |
Pedestrian |
Traffic management along Penygarn Road – improved footway |
A3 |
Ammanford |
Aspirational |
Pedestrian |
Improve footway along Heol Tycroes. Construct footway on Pantyfynnon Road & segregated pedestrian facility over level crossing. |
A4 |
Ammanford |
Aspirational |
Shared Use |
Route connecting Pantyffynon to Penybanc via access from the end of Mill Terrace road in Pantyffynon |
A5 |
Ammanford |
Aspirational |
Pedestrian |
Place tactile and dropped kerbs at crossing points - New Road |
A7 |
Ammanford |
Aspirational |
Pedestrian |
Ammanford central footway link and improved pedestrian access to local trip attractors. Details for this scheme to be confirmed subject to discussions with Welsh Government. |
A9 |
Ammanford |
Aspirational |
Pedestrian |
Dyffryn Road footway link and improved pedestrian access to local trip attractors. |
A10 |
Ammanford |
Aspirational |
Pedestrian |
Footway link to Dyffryn Road and improved pedestrian access to local trip attractors. |
A11 |
Ammanford |
Aspirational |
Cycle |
Off Road Cycleway alongside Blaenau Road and off-road link to Ammanford Station |
A12 |
Ammanford |
Aspirational |
Pedestrian |
Footway link near railway. Upgrade and widen path along Blaenau to Llandybie including zebra crossing. |
A13 |
Ammanford |
Aspirational |
Pedestrian |
Creation of new footway and improved links along Kings Road |
7.36 / A14 |
Ammanford |
Short Term |
Pedestrian |
ERM Fail - Lighting needed along footpath. Overgrown, steep steps, narrow with bollard |
A16 |
Ammanford |
Aspirational |
Pedestrian |
Footway link to Parc Penrhiw |
A17 |
Ammanford |
Aspirational |
Pedestrian / Cycle |
Traffic calming and improved pedestrian permeability outside Bettws School |
A18 |
Ammanford |
Aspirational |
Pedestrian |
Improved and new footway links along Pentwyn Road |
A19 |
Ammanford |
Aspirational |
Pedestrian |
Improved and new footway links along Wernolau Road |
A20 |
Ammanford |
Aspirational |
Pedestrian |
Creation of new footways along Maesquarre Road |
1.5b / A25 |
Ammanford |
Short Term |
Cycle |
ERM Route 1.5b Fail - Existing route requires maintenance |
A27 |
Ammanford |
Aspirational |
Pedestrian |
Creation of footway linking Hospital with Amman Valley Cycleway |
A28 |
Ammanford |
Short Term |
Pedestrian |
Completion of footway link along Folland Road |
A29 |
Ammanford |
Aspirational |
Cycle |
Route along Ammanford Road A483 from Llandybie. Details for this scheme to be confirmed subject to discussions with Welsh Government. |
A30 |
Ammanford |
Aspirational |
Pedestrian / Cycle |
Connection through west of Ammanford - Tir-Yr-Dail Lane |
B1 |
Brynamman |
Short Term |
Cycle |
Link to formalise Amman Valley Cycleway through Brynamman Rugby Club land |
B2 |
Brynamman |
Aspirational |
Pedestrian |
Upgrade of crossing points on A4609 to allow for easier pedestrian movement |
B3 |
Brynamman |
Aspirational |
Pedestrian / Cycle |
Speed limit on New Road to allow for safer pedestrian and cycling movements. Cycling provision to be determined. |
B4 |
Brynamman |
Aspirational |
Pedestrian / Cycle |
Proposed 20mph on Ardwyn Rd. Cycling provision to be determined. |
B5 |
Brynamman |
Aspirational |
Pedestrian / Cycle |
Proposed 20mph limit on Brynceunant Rd. Cycling provision to be determined. |
BP1 |
Burry Port |
Medium Term |
Cycle |
Existing cycling route alongside B4311 - No cycle infrastructure, provide off road route |
BP5 |
Burry Port |
Short Term |
Pedestrian / Cycle |
Section of path along Old Tramway. Shared use. Improve signage and provision behind shops |
BP7 |
Burry Port |
Short Term |
Shared Use |
ERM cycle route upgrade to shared use - Section of path along Old Tramway. Short term improvements |
BP9 |
Burry Port |
Medium Term |
Pedestrian |
Footway request at Cliff Terrace and complete loop on map as shown along Furnace Road missing footway and Gwscwm Road. |
BP10 |
Burry Port |
Aspirational |
Pedestrian |
Add missing footway between Ar-Y Bryn and Mumbles Head Estates. |
BP11 |
Burry Port |
Aspirational |
Pedestrian |
Footway link provision at junction of Maenor Helyg and Ashburnham Road |
BP12 |
Burry Port |
Aspirational |
Pedestrian |
Pedestrian tactile crossing facilities at both estate junctions. Golwgfor Estate / Dan Y Bryn Estate, Lando Road |
BP15 |
Burry Port |
Aspirational |
Cycle |
Aspirational cycle route Burry Port to Cross Hands |
BP16 |
Burry Port |
Aspirational |
Cycle |
A494 Aspirational cycle route to Kidwelly |
C1 / 1.1 |
Carmarthen |
Short Term |
Cycle |
ERM Route 1.1 Fail - Cycle track alongside road to provide a link onwards – requires upgrading - maintain foliage. Details for this scheme to be confirmed subject to discussions with Welsh Government. |
C2 |
Carmarthen |
Medium Term |
Cycle |
Travellers' Rest On road cycle provision – requires upgrading. Provide cycle infrastructure to separate from traffic |
C3 |
Carmarthen |
Medium Term |
Shared Use |
Carmarthen West Link Road – 3m shared use path on either side of road facilities incorporated in plan. Not yet complete on site |
C4 |
Carmarthen |
Short Term |
Cycle |
Shared use path linking College Road and Trevaughan Road. Need better signs to mark the path as it crosses through a farm. |
C6 |
Carmarthen |
Medium Term |
Cycle |
St Clears Road -on road cycling provision – requires upgrading. Links to cycle network |
5.1c / C9 |
Carmarthen |
Short Term |
Cycle |
ERM Route 5.1c Fail - Existing on road cycling provision – requires surface upgrading. |
C12 |
Carmarthen |
Medium Term |
Pedestrian / cycle |
Llansteffan Road. Improved links to school and existing cycle network. On road cycle route |
7.1 / C14 |
Carmarthen |
Short Term |
Pedestrian / Cycle |
Shared Use link to existing cycle network and route. Part of route is ERM route 7.1 - pedestrian. Proposed shared use path |
C15 |
Carmarthen |
Aspirational |
Cycle |
Aspirational link across river linking Johnstown with Pensarn/Pibwrlwyd |
C21 |
Carmarthen |
Short Term |
Cycle |
Route requires upgrading. Provide on or off-road cycle infrastructure |
C23 |
Carmarthen |
Short Term |
Pedestrian |
Picton Court - provide signage and footways |
C25 |
Carmarthen |
Short Term |
Pedestrian / Cycle |
St Catherine Street on road cycling route – requires signage |
C26 |
Carmarthen |
Short Term |
Cycle |
College Road - on road cycling route – requires upgrading including crossing |
C28 |
Carmarthen |
Short Term |
Pedestrian |
Section of footway required along access road |
4.2 / C29 |
Carmarthen |
Short Term |
Cycle |
ERM Route 4.2 Fail - Picton Place existing on road cycling provision – requires upgrading – maintain foliage covering signage |
1.5 / C30 |
Carmarthen |
Short Term |
Pedestrian |
ERM route 1.5 – requires upgrading - lighting and surfacing |
C32 |
Carmarthen |
Short Term |
Pedestrian |
Existing walking route – requires upgrading. Provide tactile paving, lighting and resurface defects |
C35 |
Carmarthen |
Short Term |
Pedestrian |
Lime Grove Avenue link improvements and footway widening |
C36 |
Carmarthen |
Short Term |
Pedestrian |
Creation of a small walking link between Ysgol y Dderwen and Fountain Hall Terrace via Llys Ffynnon |
C38 |
Carmarthen |
Short Term |
Pedestrian |
Existing walking route – requires upgrading, steps restrict access for all users |
C41 |
Carmarthen |
Short Term |
Pedestrian |
Friars Park - Needs footway along access road section |
C42 |
Carmarthen |
Short Term |
Pedestrian |
Lammas St to Friars Park - needs new footway along access road |
C44 |
Carmarthen |
Short Term |
Pedestrian |
St Catherine St to Lammas St. needs wider footway |
C48 |
Carmarthen |
Short Term |
Pedestrian |
Jackson's Lane - requires lighting improvements |
C49 |
Carmarthen |
Short Term |
Pedestrian |
King Street requires removal of bollards to increase footway width |
5.4a / C52 |
Carmarthen |
Short Term |
Cycling |
ERM route 5.4a - on road cycling route – requires signage upgrade and route maintenance. Contraflow to allow cyclists along The Quay |
5.4b / C53 |
Carmarthen |
Short Term |
Cycling |
ERM Route 5.4b - The Parade on road cycling route - Enforce on street parking restrictions |
C54 |
Carmarthen |
Short Term |
Pedestrian |
Off road footway between Priory St and Esplanade. Route needs signage and widening |
C55 |
Carmarthen |
Aspirational |
Pedestrian / cycle |
Road safety improvements outside school along Richmond Terrace including plateau for safer pedestrian movement. Cycling provision to be determined. |
C56 |
Carmarthen |
Short Term |
Pedestrian |
Footpath link from Richmond Terrace to St Peters car park. Upgrades as part of Safe Routes |
C57 |
Carmarthen |
Short Term |
Pedestrian |
Footpath link improvement from Richmond Terrace to Richmond School Car Park. Upgrades as part of Safe Routes |
C58 |
Carmarthen |
Aspirational |
Pedestrian |
Footway creation and link to Wellfield Road |
C59 |
Carmarthen |
Short Term |
Pedestrian |
Remove barriers at southern end of route |
C60 |
Carmarthen |
Short Term |
Pedestrian |
Park Hall to Oak Terrace. Provide footway where missing and adequate lighting along link |
C61 |
Carmarthen |
Short Term |
Pedestrian |
Belvedere Av to Park Hall. Remove steps which restrict access |
C62 |
Carmarthen |
Medium Term |
Pedestrian |
Belvedere Av to Ross Av. Remove steps which restrict access and maintain overgrown vegetation |
C63 |
Carmarthen |
Medium Term |
Pedestrian |
Cwm-Oernant - Resurface route to enable access for all users. Maintain overgrown vegetation and provide adequate lighting |
C64 |
Carmarthen |
Aspirational |
Pedestrian |
Footway provision along North Parade |
7.19 / C65 |
Carmarthen |
Short Term |
Shared Use |
ERM Pedestrian route 7.19, INM shared use route. Provide cycle signage |
C66 |
Carmarthen |
Aspirational |
Cycle |
Aspirational shared use path linking with Bronwydd |
C67 |
Carmarthen |
Aspirational |
Pedestrian |
Footway extension on Castell Pigyn Road |
C68 |
Carmarthen |
Aspirational |
Cycle |
Aspirational shared used extension towards Towy Valley Path via Abergwili |
C69 |
Carmarthen |
Aspirational |
Pedestrian / Cycle |
Road safety measures along Gyfre Gardens and 20 mph zone – improved provision for pedestrians and cyclists |
C70 |
Carmarthen |
Aspirational |
Pedestrian |
Footway at the entrance to Wellfield road leading towards Merlins Hill |
C75 |
Carmarthen |
Short Term |
Pedestrian |
Improvements to pedestrian permeability along section between Wellfield Road and Bryn Myrddin |
C77 |
Carmarthen |
Short Term |
Pedestrian |
Remove steps restricting access and provide lighting. Provide crossings at each end of link |
C78 |
Carmarthen |
Aspirational |
Pedestrian |
Penmorfa Lane - traffic order on Keep Clear Zig Zag markings – improved pedestrian safety. Create footway where missing |
C79 |
Carmarthen |
Short Term |
Pedestrian |
Rhiw Babell - Widening of footway at 'Lockerly' |
C82 |
Carmarthen |
Aspirational |
Pedestrian |
Heol Login to Heol Llangynnwr - Existing walking route currently across fields. Requires upgrading. |
C83 |
Carmarthen |
Short Term |
Shared Use |
New cycleway/shared use path linking to new Police HQ |
C85 |
Carmarthen |
Short Term |
Pedestrian |
Footway linking Springfield Road to Capel Evan Rd |
C86 |
Carmarthen |
Short Term |
Pedestrian |
Footway linking Abbey Mead to Towy Valley Path |
7.20 / C87 |
Carmarthen |
Aspirational |
Pedestrian |
Footway linking Abergwili Road to Pigyn Road |
C88 |
Carmarthen |
Aspirational |
Cycle |
On road cycle improvements along Abergwili Road linking to Towy Valley Path |
C89 |
Carmarthen |
Aspirational |
Pedestrian |
Footway linking Towy Valley path to Abergwili Road |
C90 |
Carmarthen |
Aspirational |
Pedestrian |
Cillefwr footpath requires improvements |
C91 |
Carmarthen |
Aspirational |
Cycle |
South Johnstown extention of cycleway the will connect with a new development. Tie into existing infrastructure by the leisure centre |
CH1 |
Cross Hands |
Aspirational |
Pedestrian |
Footway alignment and widening works along Capel Seion Road and Heol Cwmbach |
CH2 |
Cross Hands |
Short Term |
Pedestrian |
Heol Cwmmawr existing footway - Requires upgrading. Provide pedestrian refuge or crossing near school. Restrict footway parking |
CH3 |
Cross Hands |
Aspirational |
Pedestrian |
Plateau crossing to access school over Heol Blaenhirwaun |
CH4 |
Cross Hands |
Aspirational |
Cycle |
Extended off-road section of cycleway linking Cwm Mawr with Cross Hands |
CH5 |
Cross Hands |
Aspirational |
Pedestrian |
Additional footway sections along Bethesda Road |
7.3 / CH6 |
Cross Hands |
Short Term |
Pedestrian |
ERM Route 7.3 - Footpath requires surface upgrade |
CH7 |
Cross Hands |
Aspirational |
Cycle |
Tyisha Rd to Darren Las - Additional section of cycleway linking to the existing main cycle route |
5.2b / CH8 |
Cross Hands |
Medium Term |
Cycle |
ERM Route 5.2b - Heol Y Foel cycle route on road – need to improve provision and enforce on street parking. Details for this scheme to be confirmed subject to discussions with Welsh Government. |
5.2a / CH9 |
Cross Hands |
Medium Term |
Cycle |
ERM Route 5.2a- Cycle route on road – need to improve provision and enforce on street parking |
CH10 |
Cross Hands |
Aspirational |
Cycle |
Mynydd Mawr Woodland Park link. Cycle link away from road |
CH11 |
Cross Hands |
Medium Term |
Cycle |
Cycle link to existing cycle network and route. Repair surface defects and provide continuous route. Remove End of Route signage |
1.2 / CH12 |
Cross Hands |
Short Term |
Cycle |
ERM Route 1.2- Define access |
CH13 |
Cross Hands |
Short Term |
Shared Use |
Spine Road shared use under construction |
CH15 |
Cross Hands |
Aspirational |
Pedestrian |
Widening of existing footway on Carmarthen Road alongside Cross Hands Hotel |
CH16 |
Cross Hands |
Aspirational |
Cycle |
Link to existing cycle infrastructure along Meadows Rd |
CH17 |
Cross Hands |
Short Term |
Cycle |
Improvements required to existing cycle infrastructure. Details for this scheme to be confirmed subject to discussions with Welsh Government. |
CH18 |
Cross Hands |
Short Term |
Shared Use |
Existing cycle route - needs upgrading to a continuous off-road route |
CH19 |
Cross Hands |
Aspirational |
Pedestrian |
Footway link along Black Lion Road |
CH20 |
Cross Hands |
Aspirational |
Pedestrian |
Improved road safety outside school – 20mph zone |
CH21 |
Cross Hands |
Medium Term |
Shared Use |
Cross Hands Economic Link Road |
CH22 |
Cross Hands |
Aspirational |
Pedestrian |
Footway required along Llandeilo Road |
CH23 |
Cross Hands |
Aspirational |
Pedestrian |
Footway widening Penygroes to Blaunau |
CH24 |
Cross Hands |
Aspirational |
Pedestrian / Cycle |
Improved Road Safety outside school including vertical measures |
CH25 |
Cross Hands |
Aspirational |
Cycle |
Long distance aspirational route joining Cross Hands with Ammanford via Blaenau/Llandybie |
7.16 / CH26 |
Cross Hands |
Short Term |
Pedestrian |
ERM - Upgrade on existing footpath – lighting |
7.17 / CH27 |
Cross Hands |
Medium Term |
Pedestrian |
ERM - Upgrade on existing footpath – lighting and resurfacing |
CH32 |
Cross Hands |
Aspirational |
Pedestrian |
Signalise cross roads and improve pedestrian provision |
7.11 / CH33 |
Cross Hands |
Short Term |
Pedestrian |
ERM Route 7.11 - Upgrade on existing footpath – lighting |
CH34 |
Cross Hands |
Aspirational |
Pedestrian |
Upgrade existing pedestrian right of way from Cwmfferws Road to Saron Road. Complete footway links. |
CH35 |
Cross Hands |
Aspirational |
Pedestrian |
Footway from Access lane to Cruglas Farm to No. 56 Cwmfferws |
CH36 |
Cross Hands |
Aspirational |
Cycle |
B4317 Aspirational long distance cycle route to Kidwelly |
K1 |
Kidwelly |
Short Term |
Pedestrian |
Footway along Station Road. Needs upgrading |
B / C / K2 |
Kidwelly |
Short Term |
Cycle |
ERM Routes B & C - on road needs improvement. Restrict parked vehicles |
K3 |
Kidwelly |
Short Term |
Shared Use |
Provide cycle signage and lighting through park |
K5 |
Kidwelly |
Short Term |
Shared Use |
Existing shared use facilities – requires resurfacing. |
K6 |
Kidwelly |
Aspirational |
Pedestrian |
Aspirational footway provision from Awel y Mor to connect with existing |
K7 |
Kidwelly |
Short Term |
Pedestrian |
Provide formal footway |
K8 |
Kidwelly |
Aspirational |
Pedestrian |
Linking footway along sections of southern curtilage on Carmarthen Road |
K9 |
Kidwelly |
Aspirational |
Cycle |
Aspirational long distance cycle route west from Kidwelly to Ferryside |
K10 |
Kidwelly |
Aspirational |
Cycle |
Direct link from Millennium Coastal Path to Kidwelly Railway Station |
K11 |
Kidwelly |
Aspirational |
Cycle |
Aspirational Route towards Carmarthen from Ferryside |
K12 |
Kidwelly |
Aspirational |
Cycle |
link BP15 to Kidwelly along former Burry Port & Gwendraeth Valley Railway |
K13 |
Kidwelly |
Aspirational |
Cycle |
Aspirational route along A484 to Carmarthen |
K14 |
Kidwelly |
Aspirational |
cycle |
Cycle route along Ferry Road, Kidwelly |
LL1 |
Llandovery |
Short Term |
Pedestrian |
Footway links around trip generators along New Road. Restrict footway parking. Details for this scheme to be confirmed subject to discussions with Welsh Government. |
LL5 |
Llandovery |
Aspirational |
Shared Use |
Aspirational off-road cycle/shared use path. Details for this scheme to be confirmed subject to discussions with Welsh Government. |
LL6 |
Llandovery |
Aspirational |
Cycle |
Aspirational route towards Llandeilo along A4069 / A40. Details for this scheme to be confirmed subject to discussions with Welsh Government. |
L1 |
Llanelli |
Short Term |
Pedestrian / Cycle |
Upgrade path leading to Pwll School. Traffic calming to support 20mph zone. Improved crossings. Part of Safe Routes. |
L2 |
Llanelli |
Short Term |
Pedestrian |
Footway improvements along Sandy Road linking to trip attractors as part of Safe Routes |
L3 |
Llanelli |
Short Term |
Pedestrian |
Footway link along Denham Avenue to link with existing infrastructure. Upgrades as part of Safe Routes |
L4 |
Llanelli |
Aspirational |
Shared Use |
Widen paths to allow shared use. |
L5 |
Llanelli |
Aspirational |
Pedestrian |
New crossing with dropped kerbs |
L6 |
Llanelli |
Aspirational |
Pedestrian |
Kerb buildouts on Queen Victoria Road to improve Crossing visibility |
L7 |
Llanelli |
Aspirational |
Pedestrian |
Footway buildout on Old Castle Road |
L8 |
Llanelli |
Aspirational |
Pedestrian |
Crossing Plateau on Waunlanurafon |
L9 |
Llanelli |
Short Term |
Shared Use |
Route through People's Park. Upgraded Links to NCN / Millennium Coastal Path. |
L10 |
Llanelli |
Short Term |
Pedestrian |
Improved pedestrian passage and safety over railway bridge at Old Road, Furnace, Llanelli. Upgrades as part of Safe Routes bid. |
L11 |
Llanelli |
Medium Term |
Cycle |
Cycling infrastructure improvements - provide dedicated cycle route |
L12 |
Llanelli |
Short Term |
Shared Use |
Church St Proposed shared use path |
L16 |
Llanelli |
Medium Term |
Shared Use |
Station Road to Llanelli centre. Current on road cycle route and footway, proposed shared use path |
L17 |
Llanelli |
Medium Term |
Cycle |
Pottery St - Cycling infrastructure improvements - provide dedicated cycle route |
L18 |
Llanelli |
Medium Term |
Cycle |
Cycling infrastructure improvements - provide dedicated cycle route |
L19 |
Llanelli |
Aspirational |
Pedestrian |
Create new path to link to school |
L20 |
Llanelli |
Aspirational |
Pedestrian |
Provision of pedestrian tactile crossing facilities Dillwyn St |
L21 |
Llanelli |
Medium Term |
Shared Use |
Llanelli Station links provision of shared use path |
L22 |
Llanelli |
Medium Term |
Shared Use |
Proposed shared use path connecting Marine Street to Pen-y-Fan |
L23 |
Llanelli |
Medium Term |
Cycle |
Cycling infrastructure improvements - provide dedicated cycle route Ty- Isaf to Parc Trostre |
L24 |
Llanelli |
Medium Term |
Cycle |
Cycling infrastructure improvements linking to new school and Wellness Village |
L25 |
Llanelli |
Medium Term |
Cycle |
Cycling infrastructure improvements - potential to move off road and link to new school and Wellness village |
L26 |
Llanelli |
Medium Term |
Cycle |
Cycling infrastructure improvements - potential to move off road and link to new school and Wellness village |
L27 |
Llanelli |
Short Term |
Shared Use |
Existing shared use path. Short term signage improvements |
L28 |
Llanelli |
Aspirational |
Cycle |
Extend cycle route along B4304 - aspirational cycle route |
L29 |
Llanelli |
Medium Term |
Shared Use |
Proposed shared use path Morfa to Parc Trostre |
42 / L30 |
Llanelli |
Medium Term |
Cycle |
ERM Pedestrian route 42, INM cycling route including proposed crossing upgrade over existing bridge |
L34 |
Llanelli |
Aspirational |
Pedestrian |
Footway creation around Parc Trostre linking to trip attractors |
L35 |
Llanelli |
Aspirational |
Pedestrian |
Footway creation around Parc Trostre linking to trip attractors |
L36 |
Llanelli |
Medium Term |
Shared Use |
Provide off road cycle route around Parc Trostre linking to trip attractors |
L37 |
Llanelli |
Medium Term |
Pedestrian |
Footway improvements along private road to Tata Steel - Maes-ar-Ddafen Road |
L38 |
Llanelli |
Aspirational |
Shared Use |
Proposed shared use path connecting trip attractors |
L39 |
Llanelli |
Medium Term |
Shared Use |
Proposed shared use path A4138 |
L43 |
Llanelli |
Short Term |
Cycle |
Cycling infrastructure improvements A484. Provide dedicated cycle facilities |
L44 |
Llanelli |
Aspirational |
Pedestrian / Cycle |
Traffic calming measures on Walters Road, Marblehall Road and Penallt Road |
95 / L45 |
Llanelli |
Short Term |
Shared Use |
ERM Route 95 - Footpath upgrade required – maintain foliage |
L46 |
Llanelli |
Medium Term |
Shared Use |
Swansea Rd proposed shared use path |
49 / L47 |
Llanelli |
Short Term |
Shared Use |
A484 to Swansea Rd - no existing cycling infrastructure, proposed shared use path |
L48 |
Llanelli |
Medium Term |
Shared Use |
Corporation Avenue - no existing cycle infrastructure. Proposed shared use path |
L49 |
Llanelli |
Medium Term |
Cycle |
Cycling infrastructure improvements - no existing infrastructure |
L50 |
Llanelli |
Short Term |
Shared Use |
Afon Lliedi Shared use path requires upgrade - signage |
L54 |
Llanelli |
Medium Term |
Shared Use |
Heol Nant Y Felin on road cycling - Proposed shared use path |
L55 |
Llanelli |
Medium Term |
Shared Use |
Corporation Avenue to Heol Goffa Shared use path off road - upgrades required |
L56 |
Llanelli |
Medium Term |
Shared Use |
Corporation Ave North - Proposed shared use path |
L57 |
Llanelli |
Medium Term |
Shared Use |
Corporation Avenue to Gower View Proposed shared use path |
L58 |
Llanelli |
Aspirational |
Pedestrian |
Footway provision between no. 204, 208 and 210 Felinfoel Rd |
L59 |
Llanelli |
Aspirational |
Pedestrian |
Llon Y Dderwen Widen and realign road to accommodate footway. Narrow, steep gradient no footways |
66 / L60 |
Llanelli |
Short Term |
Pedestrian |
ERM Footpath Route 60 - upgrade required – maintain foliage |
L61 |
Llanelli |
Aspirational |
Pedestrian |
Footway and minor road widening at Community Centre, Tanyrhodyn leading to Rhandirfelin |
L62 |
Llanelli |
Short Term |
Shared Use |
Salem Rd / Glan Yr Afon proposed shared use path |
59 / L64 |
Llanelli |
Short Term |
Pedestrian |
ERM Footpath Route 59 upgrade required – maintain foliage |
L65 |
Llanelli |
Medium Term |
Shared Use |
Provide continuous shared use path. Part off road part on road. Penygaer Rd to Brynsiriol |
55 / L66 |
Llanelli |
Short Term |
Shared Use |
ERM Route 55 Existing Pedestrian - Proposed shared use path - improve signage |
L68 |
Llanelli |
Medium Term |
Shared Use |
Bryn Eli proposed shared use path - no existing cycle infrastructure |
L70 |
Llanelli |
Short Term |
Pedestrian |
Bryngwyn Rd - Footway improvements linking to trip attractors. Restrict footway parking and relocate traffic signs from footway |
L72 |
Llanelli |
Medium Term |
Shared Use |
Dafen Cricket Club - Proposed shared use path, no footpath currently |
L73 |
Llanelli |
Medium Term |
Shared Use |
Prince Phillip Hospital to A4138 Proposed shared use path |
L76 |
Llanelli |
Medium Term |
Shared Use |
Dafen Road to Prince Phillip hospital- no existing cycle infrastructure. Proposed shared use path. New build through field to connect to hospital. |
L79 |
Llanelli |
Medium Term |
Shared Use |
Ynyswen to Afon Lliedi Proposed shared use path - away from road. |
L81 |
Llanelli |
Aspirational |
Pedestrian / Cycle |
Heol Belli Glas / Pennant Cycling/pedestrian improvements and extend 20 mph zone to include key routes to school |
L83 |
Llanelli |
Short Term |
Shared Use |
Proposed shared use path linking residential and employment sites - not yet built |
L84 |
Llangennech |
Aspirational |
Pedestrian |
Footway and Road Safety Improvements North and south of the roundabout along Troserch Road |
L85 |
Llangennech |
Aspirational |
Cycle |
Improved safety and speed measures along Maes y Dderwen Rd / Pontarddulais Rd plus additional cycle supporting measures. |
L86 |
Llangennech |
Aspirational |
Pedestrian |
Provision of linking section footway across No. 3 Heol Y Mynydd |
L87 |
Llangennech |
Aspirational |
Pedestrian |
Footway in vicinity of Ty Ddraig Gwyrdd and along Genwen Road |
L88 |
Llanelli |
Aspirational |
Pedestrian / Cycle |
20mph limit on Cwmfelin Road near junction with School. Improved links along Tanygraig Rd |
L89 |
Llanelli |
Aspirational |
Pedestrian |
Improved footway and widening of footway where road narrows along Berwick Road |
L90 |
Llanelli |
Medium Term |
Cycle / Pedestrian |
Crossing across B4297 |
L91 |
Llanelli |
Aspirational |
Pedestrian |
Footway on Western side of B4297 in Bynea |
C / L92 |
Llanelli |
Medium Term |
Shared Use |
ERM Route C outside of Gateway Holiday Park very poor surface needs upgrading |
C / L93 |
Llanelli |
Medium Term |
Shared Use |
ERM along (NCN4) Machynys Peninsula very poor surface needs upgrading |
L94 |
Llanelli |
Aspirational |
Shared Use |
Build a cycle/pedestrian lane, put in lights across the A484, this would link up the two cycle parts of Penyfan with the new route recently built on the A4138, whilst avoiding Trostre Roundabout completely. |
L95 |
Llanelli |
Aspirational |
Shared Use |
Furnace School aspirational links to NCN |
L96 |
Llanelli |
Short Term |
Pedestrian |
Footway creation to south of Furnace School |
L97 |
Llanelli |
Short Term |
Shared Use |
Shared use path creation linking the community centre with the rugby club and NCN |
L98 |
Llanelli |
Aspirational |
Pedestrian |
Footway improvements over Old Road bridge and link to NCN |
L99 |
Llanelli |
Aspirational |
Shared Use |
New shared use link to North Dock as an alternative to link L4 |
L100 |
Llanelli |
Aspirational |
Pedestrian |
Off road footpath improvements to link to Glascoed and School |
L101 |
Llanelli |
Aspirational |
Pedestrian |
Aspirational shared use to connect to back of school |
L102 |
Llanelli |
Short Term |
Shared Use |
Replacement of existing steps to link estate to Sandy Water Park |
L103 |
Llanelli |
Short Term |
Shared Use |
Replacement of small bridge to complete route |
H1 |
Hendy |
Aspirational |
Pedestrian |
Footway/Road Safety improvements along Heol Y Parc between Heol Llynbedw and Clos Y Wern. |
H2 |
Hendy |
Aspirational |
Pedestrian |
Footway link improvements on Bronallt Road |
H3 |
Hendy |
Aspirational |
Pedestrian |
Footway provision improvements along Carmarthen Road |
H4 |
Hendy |
Aspirational |
Pedestrian / Cycle |
Improved cycle/pedestrian facilities along Iscoed Road especially outside the school including crossing facilities. |
H6 |
Hendy |
Aspirational |
Shared Use |
Route connecting Hendy and Llangennech |
SC1 |
St Clears |
Aspirational |
Pedestrian |
Provide footway along Bethlehem Road |
SC2 |
St Clears |
Short Term |
Cycle |
Existing Cycleway. Better visibility leading up to path under the underpass and surface of path into St Clears Car Park. Better surface on path between St Clears and Church leading down to the river. Details for this scheme to be confirmed subject to discussions with Welsh Government. |
SC3 |
St Clears |
Medium Term |
Pedestrian |
Pedestrian footway improvements along Station Road |
SC4 |
St Clears |
Short Term |
Cycle |
A40 - Existing cycleway. Details for this scheme to be confirmed subject to discussions with Welsh Government. |
SC5 |
St Clears |
Aspirational |
Cycle |
Aspirational cycleway to link to SC4 and East to Carmarthen Details for this scheme to be confirmed subject to discussions with Welsh Government. |
SC6 |
St Clears |
Aspirational |
Cycle |
Aspirational cycleway to link to SC4 and East to Carmarthen |
SC7 |
St Clears |
Aspirational |
Cycle |
Aspirational cycleway to link to SC4 and East to Carmarthen |
SC8 |
St Clears |
Aspirational |
Shared Use |
Footpath/Cycle route from St Clears Boat Club through to existing cycle route alongside river |
SC9 |
St Clears |
Aspirational |
Shared Use |
Aspirational shared use path connecting Pwll Trap to St Clears |
SC10 |
St Clears |
Aspirational |
Shared Use |
Aspirational shared use path along Tenby Rd |