Strategic
Policy - SP1: Strategic
Growth
|
SO3, SO10
SA1, SA10, SA15
|
SP1
SP3
HOM1 HOM2 HOM3
|
|
Indicator Required by Legislation:
Number of net additional open market dwellings and
affordable homes built in the Plan area.
|
To deliver 8,835 dwellings in total during the Plan
period - based on an annual completion rate of 589
units and 100 affordable units per year.
|
Delivery of below the Plan's annual build rate /
target for at least two consecutive years.
|
Local Planning Authority
Developers
Infrastructure Providers
Local Housing Authority
|
JHLAS
|
SO3, SO12
SA10, SA14
|
SP1
|
|
Local Indicator:
Job creation.
Monitored for information purposes.
|
No target.
|
No trigger.
|
Carmarthenshire County Council
Developers/ Employers
|
Carmarthenshire County Council
|
SO1, SO2, SO3, SO13
SA1, SA2, SA12, SA14
|
SP1
SG3
|
|
Local Indicator:
Production of SPG on The Pembrey Peninsula.
|
Adopt SPG by December 2022.
|
Failure to progress in accordance with the
timetable set.
|
Carmarthenshire County Council
|
|
Strategic
Policy – SP 2: Retail and Town Centres
|
SO4
SA1, SA6, SA14
|
SP2
|
|
Vacant Retail Units of commercial properties
|
Vacancy rates of commercial properties within
defined town centre boundary.
|
Vacancy levels increase
|
Businesses
Carmarthenshire County Council
|
Retail and Town Centre Audit
|
Strategic
Policy – SP 3: A Sustainable Approach to Providing
New Homes
|
SO10
SA1, SA10, SA15
|
SP1
SP3
|
|
Indicator required by Legislation:
The housing
land supply, taken from current
JHLAS measured in years' supply.
|
Housing Land Supply of 5 or more years.
|
The housing land supply falls below 5 years as
determined through the annual JHLAS.
|
Local Planning Authority
|
JHLAS*
|
SO10
SA10, SA15
|
SP1
SP3
HOM1
|
|
Key Indicator:
The level of housing completions (private and
affordable) monitored against the housing
requirement.
|
Annual completions as per the housing trajectory.
|
Annual completion levels falling below the levels
set out in the housing trajectory for at least two
consecutive years.
|
Local Planning Authority
Local Housing Authority
Developers
|
JHLAS*
|
SO6, SO10
SA10, SA15
|
SP3
HOM1
|
|
Local Indicator:
Number of dwellings delivered on Housing
Allocations.
|
To deliver 6,986 dwellings on allocated sites.
|
The overall number of new housing units built on
allocated sites which fall below the annual
requirement for 2 consecutive years.
|
Local Planning Authority
Local Housing Authority
Developers
|
JHLAS*
|
SO6, SO10
SA10, SA15
|
SP3
HOM2
|
|
Local Indicator:
Small Sites (less than 5 units) Allowance – Number
of dwellings delivered in tiers 1 - 3.
|
Monitored for information
|
20% +/- 88.5 dwellings permitted annually on small
sites in tiers 1 - 3.
|
Local Planning Authority
Local Housing Authority
Developers
|
JHLAS*
|
SO10
SA10, SA15
|
SP3
|
|
Local Indicator:
Windfall Allowance – number of dwellings delivered
on windfall sites (excluding small sites
allowance).
|
Monitored for information
|
20% +/- 89.5 dwellings permitted annually on
windfall sites (+5 no.).
|
Local Planning Authority
Local Housing Authority
Developers
|
JHLAS*
|
SO10
SA1, SA10, SA11, SA15
|
SP3
HOM3
|
|
Local Indicator:
Net increase in number of new homes in Rural
Villages (tier 4).
|
The number of open market homes within each Rural
Village should not exceed the 20% cap above the
number of existing homes in the settlement, as at
the LDP base date.
|
The net increase of open market homes within a
Rural Village exceeds the 20% cap above the number
of existing homes in the settlement, as at the LDP
base date.
|
Local Planning Authority
|
JHLAS*
Carmarthenshire County Council Planning
Applications Register
|
SO10
SA1, SA10, SA11, SA15
|
SP3
HOM3
|
|
Local Indicator:
Production of SPG on Homes in Rural Villages
|
Adopt SPG concurrently with the Plan.
|
Failure to progress in accordance with the
timetable set.
|
Carmarthenshire County Council
|
|
Strategic
Policy – SP 4: Affordable Homes Strategy
|
SO10
SA6, SA10, SA12, SA15
|
SP4
HOM4 AHOM1 AHOM2
|
|
Key Indicator:
The level of affordable homes completions.
|
To deliver 1,500 affordable homes in total by 2033.
|
Delivery falls below the Plan's annual build rate /
target for at least two consecutive years
|
Local Planning Authority
Local Housing Authority
Developers
Infrastructure Providers
|
JHLAS*
|
SO10
SA6, SA10, SA12, SA15
|
SP4
HOM4 AHOM1 AHOM2
|
|
Key Indicator:
Tenure of affordable housing completions.
|
Tenure split (social rented and intermediate) in
line with need identified in the LHMA.
|
Non delivery of the identified tenure split over at
least 2 consecutive years.
|
Local Planning Authority
Local Housing Authority
Developers
|
Carmarthenshire County Council
JHLAS*
|
SO10
SA6, SA10, SA12, SA15
|
SP4
AHOM1 AHOM2
|
|
Key Indicator:
Trends in key determinants of market conditions and
viability such as, house prices, land values, build
costs.
|
Viability reflective of the prevalent economic
circumstances.
|
Should average house prices increase or decrease by
5% above the base levels sustained over 1 year.
|
Carmarthenshire County Council
|
Council Valuers
|
SO10
SA6, SA10, SA12, SA15
|
SP4
AHOM1 AHOM2
|
|
Local Indicator:
Production of SPG on Affordable Housing.
|
Adopt SPG concurrently with the Plan.
|
Failure to progress in accordance with the
timetable set.
|
Carmarthenshire County Council.
|
|
Strategic
Policy – SP 5: Strategic Sites
|
SO3, SO12
SA12, SA13, SA14
|
SP3
SP5
SP6
|
|
Key Indicator:
Life Science and Well-being Village – Delivery of
housing element of the site.
Delivery of the non-residential component of the
site.
|
Annual completions as per the housing trajectory.
Granting of permission for the non-housing
component site during the Plan period
|
Annual completion levels falling below the levels
set out in the housing trajectory.
Permission for the non-residential component not
secured prior to the first review of the Plan.
|
Carmarthenshire County Council
City Deal
Developers
|
JHLAS*
Carmarthenshire County Council
|
SO3, SO12
SA11, SA12, SA13, SA14
|
SP5
SP6
|
|
Key Indicator:
Delivery of Yr Egin development.
|
Granting of permission for the site during the Plan
period.
|
Permission not secured prior to the first review of
the Plan.
|
Carmarthenshire County Council
City Deal
Developers
|
Carmarthenshire County Council
|
Strategic
Policy – SP 6: Employment and the Economy
|
SO3, SO12
SA10, SA14
|
SP1
SP5
SP6
SG1
|
|
Key Indicator:
Take up of employment allocations.
|
Employment land permitted (Ha) on allocated
employment sites.
|
No permissions on employment land allocations for
at least two consecutive years
|
Carmarthenshire County Council
Developers
|
Carmarthenshire County Council
|
SO3, SO12
SA10, SA14
|
EME1
|
|
Local Indicator:
Employment land lost to other land uses (includes
identified existing and/or proposed employment
sites)
|
No loss to other uses unless it can be justified
through LDP policy.
|
Permission granted for non-employment uses not in
accordance with LDP policy
|
Carmarthenshire County Council
|
Carmarthenshire County Council
|
SO3, SO12
SA14
|
EME4
|
|
Local Indicator:
Planning permissions for employment uses outside of
identified existing or proposed employment sites
where they are contrary to the provisions of Policy
EME4
|
Ensure that employment uses outside of proposed
and/or identified existing employment sites are in
accordance with Policy EME4
|
Planning permission for employment uses on land
outside of proposed and/or identified existing
employment sites where they are contrary to Policy
EME4
|
Carmarthenshire County Council
|
Carmarthenshire County Council
|
Strategic
Policy – SP 7: Welsh Language and Culture
|
SO11
SA1, SA11
|
SP7
WL1
|
|
Local Indicator:
Production of SPG on Welsh Language and New
Developments.
|
Adopt SPG concurrently with the Plan.
|
Failure to progress in accordance with the
timetable set.
|
Carmarthenshire County Council
|
|
SO11
SA11
|
SP7
WL1
|
|
Local Indicator:
Planning applications supported by Welsh Language
Action Plans or Welsh Language Impact Assessments
|
Planning Applications to be supported by relevant
documentation in accordance with Policy WL1
|
Planning applications not supported by relevant
documentation in accordance with Policy WL1
|
Carmarthenshire County Council
|
Carmarthenshire County Council Planning
Applications Register
|
SO11
SA11
|
SP7
WL1
|
|
Local Indicator:
Welsh speaking % in the County
|
Increase the proportion of Welsh speakers in the
County
|
No trigger. Monitoring for contextual information.
|
Carmarthenshire County Council
|
Census
Office of National Statistics
Welsh Government Data
|
Strategic
Policy – SP 8: Infrastructure
|
SO1, SO14
SA1, SA2, SA5
|
SP8
INF4
|
|
Local Indicator:
Production of SPG on The Burry Inlet.
|
Adopt SPG concurrently with the Plan.
|
Failure to progress in accordance with the
timetable set.
|
Carmarthenshire County Council
|
|
SO14
|
SP7
INF1
|
|
Local Indicator:
Production of SPG on Planning Obligations.
|
Adopt SPG concurrently with the Plan.
|
Failure to progress in accordance with the
timetable set.
|
Carmarthenshire County Council
|
|
SO2, SO14
SA1, SA12
|
SP7
INF2
|
|
Local Indicator:
Production of SPG on Health Impact Assessments.
|
Adopt SPG by Summer 2022.
|
Failure to progress in accordance with the
timetable set.
|
Carmarthenshire County Council
|
|
Strategic
Policy – SP 9: Gypsy and Traveller
Provision
|
SO10
SA10, SA15
|
SP9
GTP1
|
|
Key Indicator:
Gypsy and Traveller sites / pitches built on
allocated sites.
|
To provide the required pitches Identified within
the GTAA to be met in accordance with identified
need.
|
No planning permission secured on an allocated
site.
|
Local Housing Authority
|
Carmarthenshire County Council
|
SO10
SA10, SA15
|
SP9
GTP1
|
|
Local Indicator:
Gypsy and Traveller sites / pitches built on
unallocated sites
|
No target
|
The granting of any planning permission and/or
traveller site.
|
N/A
|
Carmarthenshire County Council
|
SO10
SA10, SA15
|
SP9
GTP1
|
|
Local Indicator:
The need for Gypsy and Traveller transit sites
|
No unauthorised Gypsy and Traveller site recorded
in one settlement for 3 consecutive years
|
1 unauthorised Gypsy and Traveller site recorded in
one settlement for 3 consecutive years
|
Carmarthenshire County Council
|
Carmarthenshire County Council
|
Strategic
Policy – SP 10: The Visitor Economy
|
SO13
SA1, SA14
|
SP10
VE1
VE2
VE3
VE4
|
|
Local Indicator:
Total economic impact of tourism in Carmarthenshire
|
No target
|
No trigger. Monitoring for contextual information
|
Carmarthenshire County Council.
Partner organisations and the tourism industry
|
STEAM Report prepared by GTS UK (Carmarthenshire CC
Marketing and Media Annual Report)
|
Strategic
Policy – SP 11: Placemaking and Sustainable
Places
|
SO9
SA1, SA8, SA9, SA12, SA15
|
SP11
|
|
Local Indicator:
Production of SPG on Placemaking and Sustainable
Places
|
Adopt SPG concurrently with the Plan
|
Failure to progress in accordance with the
timetable set
|
Carmarthenshire County Council.
|
|
SO9, SO11
SA1, SA11
|
SP11
PSD9
|
|
Local Indicator:
Production of SPG on advertisements (guidance on bi
lingual requirements)
|
Adopt SPG by Summer 2022
|
Failure to progress in accordance with the
timetable set.
|
Carmarthenshire County Council
|
|
SO2, SO9
SA1, SA12, SA15
|
SP11
PSD8
|
|
Local Indicator:
Production of SPG on Provision of New Open Space.
|
Adopt SPG concurrently with the Plan
|
Failure to progress in accordance with the
timetable set.
|
Carmarthenshire County Council
|
|
SO1, SO2, SO7, SO9
SA1, SA2, SA3, SA4, SA5, SA6, SA8, SA9, SA12, SA15
|
SP11
PSD3 PSD4
|
|
Local Indicator:
The provision of Green Infrastructure in the
County.
|
No target
|
No trigger. Monitor for information purposes.
|
Carmarthenshire County Council
|
|
SO2, SO4
SA1, SA9, SA12, SA15
|
SP11
PSD7
|
|
Local Indicator:
The amount of identified open space lost to
development.
|
No identified open space should be lost to
development except where in accordance with Policy
PSD7
|
Identified open space is lost contrary to the
provisions of Policy PSD7
|
Carmarthenshire County Council
|
|
Strategic
Policy – SP 12: Rural Development
|
SO5
SA1, SA8
|
SP12
RD4
|
|
Local Indicator:
Production of SPG on Conversion and reuse of rural
buildings for residential use
|
Adopt SPG concurrently with the Plan
|
Failure to progress in accordance with the
timetable set
|
Carmarthenshire County Council
|
|
Strategic
Policy – SP 13: Maintaining and Enhancing the
Natural Environment
|
SO1, SO9
SA1, SA2
|
SP13
NE4
|
|
Local Indicator:
Continue to work towards securing a minimum of 100
ha of suitable habitat for the Marsh Fritillary
Butterfly within the Caeau Mynydd Mawr SPG project
|
Increase in every AMR period in the area of managed
habitat in suitable condition
|
Decline in the area of managed habitat in suitable
condition for 4 consecutive AMR periods.
|
Carmarthenshire County Council.
Caeau Mynydd Mawr Project Steering Group.
|
Carmarthenshire County Council – Performance
Improvement Management System (PIMS).
|
SO1, SO9
SA1, SA2
|
SP13
NE4
|
|
Local Indicator:
Production of SPG on Caeau Mynydd Mawr.
|
Adopt SPG concurrently with the Plan
|
Failure to progress in accordance with the
timetable set.
|
Carmarthenshire County Council
|
|
SO1, SO9
SA1, SA2, SA9
|
SP13
PSD4
|
|
Local Indicator:
Production of SPG on Trees and planting as part of
new developments
|
Adopt SPG by December 2022.
|
Failure to progress in accordance with the
timetable set.
|
Carmarthenshire County Council
|
|
SO1, SO9
SA1, SA2
|
SP13
NE1
|
|
Local Indicator:
Production of SPG on Sites of Importance for Nature
Conservation Value (SINCs).
|
Adopt SPG concurrently with the Plan
|
Failure to progress in accordance with the
timetable set.
|
Carmarthenshire County Council
|
|
SO1, SO9
SA1, SA2
|
SP13
NE2
|
|
Local Indicator:
Production of SPG on Nature Conservation and
Biodiversity.
|
Adopt SPG concurrently with the Plan
|
Failure to progress in accordance with the
timetable set.
|
Carmarthenshire County Council
|
|
SO1, SO9
SA1, SA2
|
SP13
BHE2
|
|
Local Indicator:
Production of SPG on Landscape Character.
|
Adopt SPG by December 2022.
|
Failure to progress in accordance with the
timetable set.
|
Carmarthenshire County Council
|
|
Strategic
Policy – SP 14: Protection and Enhancement of the
Built and Historic Environment
|
SO5
SA1, SA8
|
SP14
|
|
Local Indicator:
Production of SPG on Archaeology.
|
Adopt SPG concurrently with the Plan
|
Failure to progress in accordance with the
timetable set.
|
Carmarthenshire County Council
|
|
SO5
SA1, SA8
|
SP14
|
|
Local Indicator:
Production of SPG on the Built and Historic
Environment.
|
Adopt SPG concurrently with the Plan
|
Failure to progress in accordance with the
timetable set.
|
Carmarthenshire County Council
|
|
Strategic
Policy – SP 15: Climate Change
|
SO7
SA1, SA4
|
SP15
CCH1
|
|
Local Indicator:
Production of SPG on Renewable Energy.
|
Adopt SPG by December 2022.
|
Failure to progress in accordance with the
timetable set.
|
Carmarthenshire County Council
|
|
SO7
SA1, SA4
|
SP15
CCH1
|
|
Local Indicator:
To increase the amount of energy and heat produced
in the County from renewable sources
|
Annual increase in the permitted capacity of
renewable energy and heat permitted.
|
No planning applications permitted for renewable
energy in one year.
|
Carmarthenshire County Council
|
CCC
|
Strategic
Policy – SP 16: Sustainable Distribution –
Settlement Framework
|
SO6, SO10
SA1, SA10
|
SP3
SP16
|
|
Key Indicator:
Proportion of housing permitted on allocations per
tier of the settlement hierarchy
|
The distribution of dwellings to be in accordance
with the proportions specified in the target
|
Deviation of +/- 10% from the expected distribution
of allocations within the tiers for at least two
consecutive years
|
Local Planning Authority
Local Housing Authority
Developers
|
JHLAS
|
Strategic
Policy – SP 17: Transport and
Accessibility
|
SO8
SA6
|
TRA1
|
|
Local Indicator: Progress toward
the implementation of identified road scheme
|
Implementation in accordance with the delivery
timetables
|
The road scheme identified is not delivered in
accordance with delivery timetables
|
Local Highway Authority
|
|
SO7, SO8
SA4, SA6, SA12, SA15
|
SP17
TRA2
|
|
Local Indicator: Amount of walking
and cycling infrastructure implemented as part of
planning permissions
|
Increase in the number of schemes implemented
|
No trigger. Monitoring for contextual information
|
Local Highway Authority
Local Planning Authority
|
|
SO8
SA6
|
TRA1
|
|
Local Indicator: Implementation of
Welsh Government Road Schemes – including Llandeilo
Bypass
Monitored for information purposes
|
No target
|
No trigger. Monitoring for contextual information
|
Welsh Government
|
|
Strategic
Policy – SP 18: Mineral Resources
|
SO7
SA6
|
SP18
MR1
|
|
Local Indicator:
The amount of hard rock landbank
|
Maintain a minimum aggregate landbank of 10 years
for hard rock
|
Less than 10 years hard rock landbank.
|
Operators
Planning Policy and guidance
LDP policies
Development management and decision making process.
|
|
SO7
SA6
|
SP18
MR1
|
|
Local Indicator:
The amount sand and gravel landbank
|
Maintain a minimum landbank for sand and gravel of
7 years.
|
Less than 7 years sand and gravel landbank.
|
Operators
Planning Policy and guidance
LDP policies
Development management and decision making process.
|
|
SO7
SA6
|
MR2
|
|
Local Indicator:
Sterilising developments permitted within mineral
buffer zones.
|
No permanent, sterilising development within a
mineral buffer zone.
|
5 permanent, sterilising developments permitted
within a mineral buffer zone contrary to Policy
over 3 consecutive years.
|
Planning Policy and guidance
LDP policies
Development management and decision making process.
|
|
SO7
SA6
|
MR3
|
|
Local Indicator:
Sterilising developments permitted within a mineral
safeguarding areas.
|
No permanent, sterilising development will be
permitted within a mineral safeguarding area.
|
5 permanent, sterilising developments permitted
within a mineral safeguarding area over 3
consecutive years.
|
Planning Policy and guidance
LDP policies
Development management and decision making process.
|
|
Strategic
Policy – SP 19: Waste Management
|
SO7
SA6
|
SP19
|
|
Local Indicator:
Monitor planning permissions for waste management
facilities
|
Maintain sufficient capacity to meet local need
|
Information set out within the South West Wales
Waste Planning Monitoring Report
|
Planning Policy and guidance
LDP policies
Development management and decision-making process.
|
|
* Subject to the outcome of the Delivery of
Housing Through the Planning System
consultation
|