Appendix 5: Active Travel Routes

CCC INM Route List

Scheme Number

Location

Term

Type

Detail

7.21 / A1

Ammanford

Short Term

Pedestrian

ERM 7.21 Fail - Footpath requires surface upgrade

A2

Ammanford

Aspirational

Pedestrian

Traffic management along Penygarn Road – improved footway

A3

Ammanford

Aspirational

Pedestrian

improve footway along Heol Tycroes. Construct footway on Pantyfynnon

Road & segregated pedestrian facility over level crossing.

A4

Ammanford

Aspirational

Shared Use

Route connecting Pantyffynon to Penybanc via access from the end of Mill

Terrace road in Pantyffynon

A5

Ammanford

Aspirational

Pedestrian

Place tactile and dropped kerbs at crossing points - New Road

A7

Ammanford

Aspirational

Pedestrian

Ammanford central footway link and improved pedestrian access to local trip attractors. Details for this scheme to be confirmed subject to discussions with Welsh Government.

A9

Ammanford

Aspirational

Pedestrian

Dyffryn Road footway link and improved pedestrian access to local trip attractors.

A10

Ammanford

Aspirational

Pedestrian

Footway link to Dyffryn Road and improved pedestrian access to local trip attractors.

A11

Ammanford

Aspirational

Cycle

Off Road Cycleway alongside Blaenau Road and off-road link to

Ammanford Station

A12

Ammanford

Aspirational

Pedestrian

Footway link near railway. Upgrade and widen path along Blaenau to

Llandybie including zebra crossing.

A13

Ammanford

Aspirational

Pedestrian

Creation of new footway and improved links along Kings Road

7.36 / A14

Ammanford

Short Term

Pedestrian

ERM Fail - Lighting needed along footpath. Overgrown, steep steps, narrow with bollard

A16

Ammanford

Aspirational

Pedestrian

Footway link to Parc Penrhiw

A17

Ammanford

Aspirational

Pedestrian / Cycle

Traffic calming and improved pedestrian permeability outside Bettws

School

A18

Ammanford

Aspirational

Pedestrian

Improved and new footway links along Pentwyn Road

A19

Ammanford

Aspirational

Pedestrian

Improved and new footway links along Wernolau Road

A20

Ammanford

Aspirational

Pedestrian

Creation of new footways along Maesquarre Road

1.5b / A25

Ammanford

Short Term

Cycle

ERM Route 1.5b Fail - Existing route requires maintenance

A27

Ammanford

Aspirational

Pedestrian

Creation of footway linking Hospital with Amman Valley Cycleway

A28

Ammanford

Short Term

Pedestrian

Completion of footway link along Folland Road

A29

Ammanford

Aspirational

Cycle

Route along Ammanford Road A483 from Llandybie. Details for this scheme to be confirmed subject to discussions with Welsh Government.

A30

Ammanford

Aspirational

Pedestrian / Cycle

Connection through west of Ammanford - Tir-Yr-Dail Lane

B1

Brynamman

Short Term

Cycle

Link to formalise Amman Valley Cycleway through Brynamman Rugby

Club land

B2

Brynamman

Aspirational

Pedestrian

Upgrade of crossing points on A4609 to allow for easier pedestrian movement

B3

Brynamman

Aspirational

Pedestrian / Cycle

Speed limit on New Road to allow for safer pedestrian and cycling movements. Cycling provision to be determined.

B4

Brynamman

Aspirational

Pedestrian / Cycle

Proposed 20mph on Ardwyn Rd. Cycling provision to be determined.

B5

Brynamman

Aspirational

Pedestrian / Cycle

Proposed 20mph limit on Brynceunant Rd. Cycling provision to be determined.

BP1

Burry Port

Medium Term

Cycle

Existing cycling route alongside B4311 - No cycle infrastructure, provide off road route

BP5

Burry Port

Short Term

Pedestrian / Cycle

Section of path along Old Tramway. Shared use. Improve signage and provision behind shops

BP7

Burry Port

Short Term

Shared Use

ERM cycle route upgrade to shared use - Section of path along Old

Tramway. Short term improvements

BP9

Burry Port

Medium Term

Pedestrian

Footway request at Cliff Terrace and complete loop on map as shown along Furnace Road missing footway and Gwscwm Road.

BP10

Burry Port

Aspirational

Pedestrian

Add missing footway between Ar-Y Bryn and Mumbles Head Estates.

BP11

Burry Port

Aspirational

Pedestrian

Footway link provision at junction of Maenor Helyg and Ashburnham

Road

BP12

Burry Port

Aspirational

Pedestrian

Pedestrian tactile crossing facilities at both estate junctions. Golwgfor

Estate / Dan Y Bryn Estate, Lando Road

BP15

Burry Port

Aspirational

Cycle

Aspirational cycle route Burry Port to Cross Hands

BP16

Burry Port

Aspirational

Cycle

A494 Aspirational cycle route to Kidwelly

C1 / 1.1

Carmarthen

Short Term

Cycle

ERM Route 1.1 Fail - Cycle track alongside road to provide a link onwards

– requires upgrading - maintain foliage. Details for this scheme to be confirmed subject to discussions with Welsh Government.

C2

Carmarthen

Medium Term

Cycle

Travellers' Rest On road cycle provision – requires upgrading. Provide cycle infrastructure to separate from traffic

C3

Carmarthen

Medium Term

Shared Use

Carmarthen West Link Road – 3m shared use path on either side of road facilities incorporated in plan. Not yet complete on site

C4

Carmarthen

Short Term

Cycle

Shared use path linking College Road and Trevaughan Road. Need better signs to mark the path as it crosses through a farm.

C6

Carmarthen

Medium Term

Cycle

St Clears Road -on road cycling provision – requires upgrading. Links to cycle network

5.1c / C9

Carmarthen

Short Term

Cycle

ERM Route 5.1c Fail - Existing on road cycling provision – requires surface upgrading.

C12

Carmarthen

Medium Term

Pedestrian / cycle

Llansteffan Road. Improved links to school and existing cycle network. On road cycle route

7.1 / C14

Carmarthen

Short Term

Pedestrian / Cycle

Shared Use link to existing cycle network and route. Part of route is ERM

route 7.1 - pedestrian. Proposed shared use path

C15

Carmarthen

Aspirational

Cycle

Aspirational link across river linking Johnstown with Pensarn/Pibwrlwyd

C21

Carmarthen

Short Term

Cycle

Route requires upgrading. Provide on or off-road cycle infrastructure

C23

Carmarthen

Short Term

Pedestrian

Picton Court - provide signage and footways

C25

Carmarthen

Short Term

Pedestrian / Cycle

St Catherine Street on road cycling route – requires signage

C26

Carmarthen

Short Term

Cycle

College Road - on road cycling route – requires upgrading including crossing

C28

Carmarthen

Short Term

Pedestrian

Section of footway required along access road

4.2 / C29

Carmarthen

Short Term

Cycle

ERM Route 4.2 Fail - Picton Place existing on road cycling provision –

requires upgrading – maintain foliage covering signage

1.5 / C30

Carmarthen

Short Term

Pedestrian

ERM route 1.5 – requires upgrading - lighting and surfacing

C32

Carmarthen

Short Term

Pedestrian

Existing walking route – requires upgrading. Provide tactile paving, lighting and resurface defects

C35

Carmarthen

Short Term

Pedestrian

Lime Grove Avenue link improvements and footway widening

C36

Carmarthen

Short Term

Pedestrian

Creation of a small walking link between Ysgol y Dderwen and Fountain

Hall Terrace via Llys Ffynnon

C38

Carmarthen

Short Term

Pedestrian

Existing walking route – requires upgrading, steps restrict access for all users

C41

Carmarthen

Short Term

Pedestrian

Friars Park - Needs footway along access road section

C42

Carmarthen

Short Term

Pedestrian

Lammas St to Friars Park - needs new footway along access road

C44

Carmarthen

Short Term

Pedestrian

St Catherine St to Lammas St. needs wider footway

C48

Carmarthen

Short Term

Pedestrian

Jackson's Lane - requires lighting improvements

C49

Carmarthen

Short Term

Pedestrian

King Street requires removal of bollards to increase footway width

5.4a / C52

Carmarthen

Short Term

Cycling

ERM route 5.4a - on road cycling route – requires signage upgrade and route maintenance. Contraflow to allow cyclists along The Quay

5.4b / C53

Carmarthen

Short Term

Cycling

ERM Route 5.4b - The Parade on road cycling route - Enforce on street parking restrictions

C54

Carmarthen

Short Term

Pedestrian

Off road footway between Priory St and Esplanade. Route needs signage and widening

C55

Carmarthen

Aspirational

Pedestrian / cycle

Road safety improvements outside school along Richmond Terrace

including plateau for safer pedestrian movement. Cycling provision to be determined.

C56

Carmarthen

Short Term

Pedestrian

Footpath link from Richmond Terrace to St Peters car park. Upgrades as part of Safe Routes

C57

Carmarthen

Short Term

Pedestrian

Footpath link improvement from Richmond Terrace to Richmond School

Car Park. Upgrades as part of Safe Routes

C58

Carmarthen

Aspirational

Pedestrian

Footway creation and link to Wellfield Road

C59

Carmarthen

Short Term

Pedestrian

Remove barriers at southern end of route

C60

Carmarthen

Short Term

Pedestrian

Park Hall to Oak Terrace. Provide footway where missing and adequate lighting along link

C61

Carmarthen

Short Term

Pedestrian

Belvedere Av to Park Hall. Remove steps which restrict access

C62

Carmarthen

Medium Term

Pedestrian

Belvedere Av to Ross Av. Remove steps which restrict access and maintain overgrown vegetation

C63

Carmarthen

Medium Term

Pedestrian

Cwm-Oernant - Resurface route to enable access for all users. Maintain overgrown vegetation and provide adequate lighting

C64

Carmarthen

Aspirational

Pedestrian

Footway provision along North Parade

7.19 / C65

Carmarthen

Short Term

Shared Use

ERM Pedestrian route 7.19, INM shared use route. Provide cycle signage

C66

Carmarthen

Aspirational

Cycle

Aspirational shared use path linking with Bronwydd

C67

Carmarthen

Aspirational

Pedestrian

Footway extension on Castell Pigyn Road

C68

Carmarthen

Aspirational

Cycle

Aspirational shared used extension towards Towy Valley Path via

Abergwili

C69

Carmarthen

Aspirational

Pedestrian / Cycle

Road safety measures along Gyfre Gardens and 20 mph zone – improved provision for pedestrians and cyclists

C70

Carmarthen

Aspirational

Pedestrian

Footway at the entrance to Wellfield road leading towards Merlins Hill

C75

Carmarthen

Short Term

Pedestrian

Improvements to pedestrian permeability along section between

Wellfield Road and Bryn Myrddin

C77

Carmarthen

Short Term

Pedestrian

Remove steps restricting access and provide lighting. Provide crossings at each end of link

C78

Carmarthen

Aspirational

Pedestrian

Penmorfa Lane - traffic order on Keep Clear Zig Zag markings – improved pedestrian safety. Create footway where missing

C79

Carmarthen

Short Term

Pedestrian

Rhiw Babell - Widening of footway at 'Lockerly'

C82

Carmarthen

Aspirational

Pedestrian

Heol Login to Heol Llangynnwr - Existing walking route currently across fields. Requires upgrading.

C83

Carmarthen

Short Term

Shared Use

New cycleway/shared use path linking to new Police HQ

C85

Carmarthen

Short Term

Pedestrian

Footway linking Springfield Road to Capel Evan Rd

C86

Carmarthen

Short Term

Pedestrian

Footway linking Abbey Mead to Towy Valley Path

7.20 / C87

Carmarthen

Aspirational

Pedestrian

Footway linking Abergwili Road to Pigyn Road

C88

Carmarthen

Aspirational

Cycle

On road cycle improvements along Abergwili Road linking to Towy Valley

Path

C89

Carmarthen

Aspirational

Pedestrian

Footway linking Towy Valley path to Abergwili Road

C90

Carmarthen

Aspirational

Pedestrian

Cillefwr footpath requires improvements

C91

Carmarthen

Aspirational

Cycle

South Johnstown extention of cycleway the will connect with a new development. Tie into existing infrastructure by the leisure centre

CH1

Cross Hands

Aspirational

Pedestrian

Footway alignment and widening works along Capel Seion Road and Heol

Cwmbach

CH2

Cross Hands

Short Term

Pedestrian

Heol Cwmmawr existing footway - Requires upgrading. Provide pedestrian refuge or crossing near school. Restrict footway parking

CH3

Cross Hands

Aspirational

Pedestrian

Plateau crossing to access school over Heol Blaenhirwaun

CH4

Cross Hands

Aspirational

Cycle

Extended off-road section of cycleway linking Cwm Mawr with Cross

Hands

CH5

Cross Hands

Aspirational

Pedestrian

Additional footway sections along Bethesda Road

7.3 / CH6

Cross Hands

Short Term

Pedestrian

ERM Route 7.3 - Footpath requires surface upgrade

CH7

Cross Hands

Aspirational

Cycle

Tyisha Rd to Darren Las - Additional section of cycleway linking to the existing main cycle route

5.2b / CH8

Cross Hands

Medium Term

Cycle

ERM Route 5.2b - Heol Y Foel cycle route on road – need to improve provision and enforce on street parking. Details for this scheme to be confirmed subject to discussions with Welsh Government.

5.2a / CH9

Cross Hands

Medium Term

Cycle

ERM Route 5.2a- Cycle route on road – need to improve provision and enforce on street parking

CH10

Cross Hands

Aspirational

Cycle

Mynydd Mawr Woodland Park link. Cycle link away from road

CH11

Cross Hands

Medium Term

Cycle

Cycle link to existing cycle network and route. Repair surface defects and provide continuous route. Remove End of Route signage

1.2 / CH12

Cross Hands

Short Term

Cycle

ERM Route 1.2- Define access

CH13

Cross Hands

Short Term

Shared Use

Spine Road shared use under construction

CH15

Cross Hands

Aspirational

Pedestrian

Widening of existing footway on Carmarthen Road alongside Cross Hands

Hotel

CH16

Cross Hands

Aspirational

Cycle

Link to existing cycle infrastructure along Meadows Rd

CH17

Cross Hands

Short Term

Cycle

Improvements required to existing cycle infrastructure. Details for this scheme to be confirmed subject to discussions with Welsh Government.

CH18

Cross Hands

Short Term

Shared Use

Existing cycle route - needs upgrading to a continuous off-road route

CH19

Cross Hands

Aspirational

Pedestrian

Footway link along Black Lion Road

CH20

Cross Hands

Aspirational

Pedestrian

Improved road safety outside school – 20mph zone

CH21

Cross Hands

Medium Term

Shared Use

Cross Hands Economic Link Road

CH22

Cross Hands

Aspirational

Pedestrian

Footway required along Llandeilo Road

CH23

Cross Hands

Aspirational

Pedestrian

Footway widening Penygroes to Blaunau

CH24

Cross Hands

Aspirational

Pedestrian / Cycle

Improved Road Safety outside school including vertical measures

CH25

Cross Hands

Aspirational

Cycle

Long distance aspirational route joining Cross Hands with Ammanford via

Blaenau/Llandybie

7.16 / CH26

Cross Hands

Short Term

Pedestrian

ERM - Upgrade on existing footpath – lighting

7.17 / CH27

Cross Hands

Medium Term

Pedestrian

ERM - Upgrade on existing footpath – lighting and resurfacing

CH32

Cross Hands

Aspirational

Pedestrian

Signalise cross roads and improve pedestrian provision

7.11 / CH33

Cross Hands

Short Term

Pedestrian

ERM Route 7.11 - Upgrade on existing footpath – lighting

CH34

Cross Hands

Aspirational

Pedestrian

Upgrade existing pedestrian right of way from Cwmfferws Road to Saron

Road. Complete footway links.

CH35

Cross Hands

Aspirational

Pedestrian

Footway from Access lane to Cruglas Farm to No. 56 Cwmfferws

CH36

Cross Hands

Aspirational

Cycle

B4317 Aspirational long distance cycle route to Kidwelly

K1

Kidwelly

Short Term

Pedestrian

Footway along Station Road. Needs upgrading

B / C / K2

Kidwelly

Short Term

Cycle

ERM Routes B & C - on road needs improvement. Restrict parked vehicles

K3

Kidwelly

Short Term

Shared Use

Provide cycle signage and lighting through park

K5

Kidwelly

Short Term

Shared Use

Existing shared use facilities – requires resurfacing.

K6

Kidwelly

Aspirational

Pedestrian

Aspirational footway provision from Awel y Mor to connect with existing

K7

Kidwelly

Short Term

Pedestrian

Provide formal footway

K8

Kidwelly

Aspirational

Pedestrian

Linking footway along sections of southern curtilage on Carmarthen Road

K9

Kidwelly

Aspirational

Cycle

Aspirational long distance cycle route west from Kidwelly to Ferryside

K10

Kidwelly

Aspirational

Cycle

Direct link from Millennium Coastal Path to Kidwelly Railway Station

K11

Kidwelly

Aspirational

Cycle

Aspirational Route towards Carmarthen from Ferryside

K12

Kidwelly

Aspirational

Cycle

link BP15 to Kidwelly along former Burry Port & Gwendraeth Valley

Railway

K13

Kidwelly

Aspirational

Cycle

Aspirational route along A484 to Carmarthen

K14

Kidwelly

Aspirational

cycle

Cycle route along Ferry Road, Kidwelly

LL1

Llandovery

Short Term

Pedestrian

Footway links around trip generators along New Road. Restrict footway parking. Details for this scheme to be confirmed subject to discussions with Welsh Government.

LL5

Llandovery

Aspirational

Shared Use

Aspirational off-road cycle/shared use path. Details for this scheme to be confirmed subject to discussions with Welsh Government.

LL6

Llandovery

Aspirational

Cycle

Aspirational route towards Llandeilo along A4069 / A40. Details for this scheme to be confirmed subject to discussions with Welsh Government.

L1

Llanelli

Short Term

Pedestrian / Cycle

Upgrade path leading to Pwll School. Traffic calming to support 20mph zone. Improved crossings. Part of Safe Routes.

L2

Llanelli

Short Term

Pedestrian

Footway improvements along Sandy Road linking to trip attractors as part of Safe Routes

L3

Llanelli

Short Term

Pedestrian

Footway link along Denham Avenue to link with existing infrastructure.

Upgrades as part of Safe Routes

L4

Llanelli

Aspirational

Shared Use

Widen paths to allow shared use.

L5

Llanelli

Aspirational

Pedestrian

New crossing with dropped kerbs

L6

Llanelli

Aspirational

Pedestrian

Kerb buildouts on Queen Victoria Road to improve Crossing visibility

L7

Llanelli

Aspirational

Pedestrian

Footway buildout on Old Castle Road

L8

Llanelli

Aspirational

Pedestrian

Crossing Plateau on Waunlanurafon

L9

Llanelli

Short Term

Shared Use

Route through People's Park. Upgraded Links to NCN / Millennium Coastal

Path.

L10

Llanelli

Short Term

Pedestrian

Improved pedestrian passage and safety over railway bridge at Old Road, Furnace, Llanelli. Upgrades as part of Safe Routes bid.

L11

Llanelli

Medium Term

Cycle

Cycling infrastructure improvements - provide dedicated cycle route

L12

Llanelli

Short Term

Shared Use

Church St Proposed shared use path

L16

Llanelli

Medium Term

Shared Use

Station Road to Llanelli centre. Current on road cycle route and footway, proposed shared use path

L17

Llanelli

Medium Term

Cycle

Pottery St - Cycling infrastructure improvements - provide dedicated cycle route

L18

Llanelli

Medium Term

Cycle

Cycling infrastructure improvements - provide dedicated cycle route

L19

Llanelli

Aspirational

Pedestrian

Create new path to link to school

L20

Llanelli

Aspirational

Pedestrian

Provision of pedestrian tactile crossing facilities Dillwyn St

L21

Llanelli

Medium Term

Shared Use

Llanelli Station links provision of shared use path

L22

Llanelli

Medium Term

Shared Use

Proposed shared use path connecting Marine Street to Pen-y-Fan

L23

Llanelli

Medium Term

Cycle

Cycling infrastructure improvements - provide dedicated cycle route Ty- Isaf to Parc Trostre

L24

Llanelli

Medium Term

Cycle

Cycling infrastructure improvements linking to new school and Wellness

Village

L25

Llanelli

Medium Term

Cycle

Cycling infrastructure improvements - potential to move off road and link to new school and Wellness village

L26

Llanelli

Medium Term

Cycle

Cycling infrastructure improvements - potential to move off road and link to new school and Wellness village

L27

Llanelli

Short Term

Shared Use

Existing shared use path. Short term signage improvements

L28

Llanelli

Aspirational

Cycle

Extend cycle route along B4304 - aspirational cycle route

L29

Llanelli

Medium Term

Shared Use

Proposed shared use path Morfa to Parc Trostre

42 / L30

Llanelli

Medium Term

Cycle

ERM Pedestrian route 42, INM cycling route including proposed crossing upgrade over existing bridge

L34

Llanelli

Aspirational

Pedestrian

Footway creation around Parc Trostre linking to trip attractors

L35

Llanelli

Aspirational

Pedestrian

Footway creation around Parc Trostre linking to trip attractors

L36

Llanelli

Medium Term

Shared Use

Provide off road cycle route around Parc Trostre linking to trip attractors

L37

Llanelli

Medium Term

Pedestrian

Footway improvements along private road to Tata Steel - Maes-ar-Ddafen

Road

L38

Llanelli

Aspirational

Shared Use

Proposed shared use path connecting trip attractors

L39

Llanelli

Medium Term

Shared Use

Proposed shared use path A4138

L43

Llanelli

Short Term

Cycle

Cycling infrastructure improvements A484. Provide dedicated cycle facilities

L44

Llanelli

Aspirational

Pedestrian / Cycle

Traffic calming measures on Walters Road, Marblehall Road and Penallt

Road

95 / L45

Llanelli

Short Term

Shared Use

ERM Route 95 - Footpath upgrade required – maintain foliage

L46

Llanelli

Medium Term

Shared Use

Swansea Rd proposed shared use path

49 / L47

Llanelli

Short Term

Shared Use

A484 to Swansea Rd - no existing cycling infrastructure, proposed shared use path

L48

Llanelli

Medium Term

Shared Use

Corporation Avenue - no existing cycle infrastructure. Proposed shared use path

L49

Llanelli

Medium Term

Cycle

Cycling infrastructure improvements - no existing infrastructure

L50

Llanelli

Short Term

Shared Use

Afon Lliedi Shared use path requires upgrade - signage

L54

Llanelli

Medium Term

Shared Use

Heol Nant Y Felin on road cycling - Proposed shared use path

L55

Llanelli

Medium Term

Shared Use

Corporation Avenue to Heol Goffa Shared use path off road - upgrades required

L56

Llanelli

Medium Term

Shared Use

Corporation Ave North - Proposed shared use path

L57

Llanelli

Medium Term

Shared Use

Corporation Avenue to Gower View Proposed shared use path

L58

Llanelli

Aspirational

Pedestrian

Footway provision between no. 204, 208 and 210 Felinfoel Rd

L59

Llanelli

Aspirational

Pedestrian

Llon Y Dderwen Widen and realign road to accommodate footway.

Narrow, steep gradient no footways

66 / L60

Llanelli

Short Term

Pedestrian

ERM Footpath Route 60 - upgrade required – maintain foliage

L61

Llanelli

Aspirational

Pedestrian

Footway and minor road widening at Community Centre, Tanyrhodyn leading to Rhandirfelin

L62

Llanelli

Short Term

Shared Use

Salem Rd / Glan Yr Afon proposed shared use path

59 / L64

Llanelli

Short Term

Pedestrian

ERM Footpath Route 59 upgrade required – maintain foliage

L65

Llanelli

Medium Term

Shared Use

Provide continuous shared use path. Part off road part on road. Penygaer

Rd to Brynsiriol

55 / L66

Llanelli

Short Term

Shared Use

ERM Route 55 Existing Pedestrian - Proposed shared use path - improve signage

L68

Llanelli

Medium Term

Shared Use

Bryn Eli proposed shared use path - no existing cycle infrastructure

L70

Llanelli

Short Term

Pedestrian

Bryngwyn Rd - Footway improvements linking to trip attractors. Restrict footway parking and relocate traffic signs from footway

L72

Llanelli

Medium Term

Shared Use

Dafen Cricket Club - Proposed shared use path, no footpath currently

L73

Llanelli

Medium Term

Shared Use

Prince Phillip Hospital to A4138 Proposed shared use path

L76

Llanelli

Medium Term

Shared Use

Dafen Road to Prince Phillip hospital- no existing cycle infrastructure. Proposed shared use path. New build through field to connect to hospital.

L79

Llanelli

Medium Term

Shared Use

Ynyswen to Afon Lliedi Proposed shared use path - away from road.

L81

Llanelli

Aspirational

Pedestrian / Cycle

Heol Belli Glas / Pennant Cycling/pedestrian improvements and extend 20 mph zone to include key routes to school

L83

Llanelli

Short Term

Shared Use

Proposed shared use path linking residential and employment sites - not yet built

L84

Llangennech

Aspirational

Pedestrian

Footway and Road Safety Improvements North and south of the roundabout along Troserch Road

L85

Llangennech

Aspirational

Cycle

Improved safety and speed measures along Maes y Dderwen Rd / Pontarddulais Rd plus additional cycle supporting measures.

L86

Llangennech

Aspirational

Pedestrian

Provision of linking section footway across No. 3 Heol Y Mynydd

L87

Llangennech

Aspirational

Pedestrian

Footway in vicinity of Ty Ddraig Gwyrdd and along Genwen Road

L88

Llanelli

Aspirational

Pedestrian / Cycle

20mph limit on Cwmfelin Road near junction with School. Improved links along Tanygraig Rd

L89

Llanelli

Aspirational

Pedestrian

Improved footway and widening of footway where road narrows along

Berwick Road

L90

Llanelli

Medium Term

Cycle / Pedestrian

Crossing across B4297

L91

Llanelli

Aspirational

Pedestrian

Footway on Western side of B4297 in Bynea

C / L92

Llanelli

Medium Term

Shared Use

ERM Route C outside of Gateway Holiday Park very poor surface needs upgrading

C / L93

Llanelli

Medium Term

Shared Use

ERM along (NCN4) Machynys Peninsula very poor surface needs upgrading

L94

Llanelli

Aspirational

Shared Use

Build a cycle/pedestrian lane, put in lights across the A484, this would link up the two cycle parts of Penyfan with the new route recently built on the A4138, whilst avoiding Trostre Roundabout completely.

L95

Llanelli

Aspirational

Shared Use

Furnace School aspirational links to NCN

L96

Llanelli

Short Term

Pedestrian

Footway creation to south of Furnace School

L97

Llanelli

Short Term

Shared Use

Shared use path creation linking the community centre with the rugby

club and NCN

L98

Llanelli

Aspirational

Pedestrian

Footway improvements over Old Road bridge and link to NCN

L99

Llanelli

Aspirational

Shared Use

New shared use link to North Dock as an alternative to link L4

L100

Llanelli

Aspirational

Pedestrian

Off road footpath improvements to link to Glascoed and School

L101

Llanelli

Aspirational

Pedestrian

Aspirational shared use to connect to back of school

L102

Llanelli

Short Term

Shared Use

Replacement of existing steps to link estate to Sandy Water Park

L103

Llanelli

Short Term

Shared Use

Replacement of small bridge to complete route

H1

Hendy

Aspirational

Pedestrian

Footway/Road Safety improvements along Heol Y Parc between Heol

Llynbedw and Clos Y Wern.

H2

Hendy

Aspirational

Pedestrian

Footway link improvements on Bronallt Road

H3

Hendy

Aspirational

Pedestrian

Footway provision improvements along Carmarthen Road

H4

Hendy

Aspirational

Pedestrian / Cycle

Improved cycle/pedestrian facilities along Iscoed Road especially outside the school including crossing facilities.

H6

Hendy

Aspirational

Shared Use

Route connecting Hendy and Llangennech

SC1

St Clears

Aspirational

Pedestrian

Provide footway along Bethlehem Road

SC2

St Clears

Short Term

Cycle

Existing Cycleway. Better visibility leading up to path under the underpass and surface of path into St Clears Car Park. Better surface on path between St Clears and Church leading down to the river. Details for this scheme to be confirmed subject to discussions with Welsh Government.

SC3

St Clears

Medium Term

Pedestrian

Pedestrian footway improvements along Station Road

SC4

St Clears

Short Term

Cycle

A40 - Existing cycleway. Details for this scheme to be confirmed subject to discussions with Welsh Government.

SC5

St Clears

Aspirational

Cycle

Aspirational cycleway to link to SC4 and East to Carmarthen Details for

this scheme to be confirmed subject to discussions with Welsh

Government.

SC6

St Clears

Aspirational

Cycle

Aspirational cycleway to link to SC4 and East to Carmarthen

SC7

St Clears

Aspirational

Cycle

Aspirational cycleway to link to SC4 and East to Carmarthen

SC8

St Clears

Aspirational

Shared Use

Footpath/Cycle route from St Clears Boat Club through to existing cycle

route alongside river

SC9

St Clears

Aspirational

Shared Use

Aspirational shared use path connecting Pwll Trap to St Clears

SC10

St Clears

Aspirational

Shared Use

Aspirational shared use path along Tenby Rd

For instructions on how to use the system and make comments, please see our help guide.
back to top back to top