SuV20/h1
Gwrthwynebu
Ail Gynllun Datblygu Lleol Adneuo Diwygiedig Sir Gaerfyrddin
ID sylw: 4796
Derbyniwyd: 05/04/2023
Ymatebydd: Mrs Ann Gower
Cydymffurfio â’r gyfraith? Heb nodi
Cadarn? Heb nodi
I wish to register my opposition to the inclusion of SuV20/h1(land adjacent to Llwyn Henri) in the revised LDP 2018-2033.
Remove the allocation.
Proposed development of site at Wernfraith Farm
I wish to register my opposition to the inclusion of SuV20/h1(land adjacent to Llwyn Henri) in the revised LDP 2018-2033.
Yours faithfully
A Gower
Yn anghytuno, mae dyraniad y safle o fewn y CDLl at ddibenion preswyl wedi cael ei ystyried yn llawn drwy'r fethodoleg asesu safle. Fel rhan o'r broses asesu hon paratowyd pro fforma safle manwl.
Disagree, the allocation of the site within the LDP for residential purposes has been subject to full consideration through the site assessment methodology. As part of this assessment process a detailed site pro forma has been prepared.
Gwrthwynebu
Ail Gynllun Datblygu Lleol Adneuo Diwygiedig Sir Gaerfyrddin
ID sylw: 4797
Derbyniwyd: 05/04/2023
Ymatebydd: Mr Andy Haywood
Cydymffurfio â’r gyfraith? Heb nodi
Cadarn? Heb nodi
I wish to register my opposition to the inclusion of the above proposed development in the revised LDP 2018-2033, as it would contribute to further potential problems with the ground/surface water and sewerage systems which are already under great demand.
The village of Porthyrhyd has already had significant extra demand put on these services over the years and is in a low lying area where the sustainability of these systems is very finely balanced.
Remove the allocation.
I wish to register my opposition to the inclusion of the above proposed development in the revised LDP 2018-2033, as it would contribute to further potential problems with the ground/surface water and sewerage systems which are already under great demand.
The village of Porthyrhyd has already had significant extra demand put on these services over the years and is in a low lying area where the sustainability of these systems is very finely balanced.
Yours faithfully
A. Haywood.
Yn anghytuno, mae dyraniad y safle o fewn y CDLl at ddibenion preswyl wedi cael ei ystyried yn llawn drwy'r fethodoleg asesu safle. Fel rhan o'r broses asesu hon paratowyd pro fforma safle manwl.
Disagree, the allocation of the site within the LDP for residential purposes has been subject to full consideration through the site assessment methodology. As part of this assessment process a detailed site pro forma has been prepared.
Gwrthwynebu
Ail Gynllun Datblygu Lleol Adneuo Diwygiedig Sir Gaerfyrddin
ID sylw: 4801
Derbyniwyd: 05/04/2023
Ymatebydd: Ms Karina Ratty
Cydymffurfio â’r gyfraith? Heb nodi
Cadarn? Heb nodi
I wish to register my opposition to the inclusion of SuV20/h1 (land adjacent to Llwyn Henri) in the revised LDP 2018-2033
Remove site from the Plan
Hi
I wish to register my opposition to the inclusion of SuV20/h1 (land adjacent to Llwyn Henri) in the revised LDP 2018-2033
Many thanks
Karina Ratty
Yn anghytuno, mae dyraniad y safle o fewn y CDLl at ddibenion preswyl wedi cael ei ystyried yn llawn drwy'r fethodoleg asesu safle. Fel rhan o'r broses asesu hon paratowyd pro fforma safle manwl.
Disagree, the allocation of the site within the LDP for residential purposes has been subject to full consideration through the site assessment methodology. As part of this assessment process a detailed site pro forma has been prepared.
Gwrthwynebu
Ail Gynllun Datblygu Lleol Adneuo Diwygiedig Sir Gaerfyrddin
ID sylw: 4803
Derbyniwyd: 06/04/2023
Ymatebydd: Mrs Emily Peake-Pitman
Cydymffurfio â’r gyfraith? Heb nodi
Cadarn? Heb nodi
I wish to register my opposition to the inclusion of SuV20/h1 (land adjacent to Llwyn Henri) in the revised LDP 2018- 2033
Remove the site from the Plan
Dear sir/madam
I wish to register my opposition to the inclusion of SuV20/h1 (land adjacent to Llwyn Henri) in the revised LDP 2018- 2033
Kind regards
Mrs Emily Peake-Pitman
Yn anghytuno, mae dyraniad y safle o fewn y CDLl at ddibenion preswyl wedi cael ei ystyried yn llawn drwy'r fethodoleg asesu safle. Fel rhan o'r broses asesu hon paratowyd pro fforma safle manwl.
Disagree, the allocation of the site within the LDP for residential purposes has been subject to full consideration through the site assessment methodology. As part of this assessment process a detailed site pro forma has been prepared.
Gwrthwynebu
Ail Gynllun Datblygu Lleol Adneuo Diwygiedig Sir Gaerfyrddin
ID sylw: 4804
Derbyniwyd: 06/04/2023
Ymatebydd: Mr Mark Spragg
Cydymffurfio â’r gyfraith? Heb nodi
Cadarn? Heb nodi
I wish to register my opposition to the inclusion of SuV20/h1 (land adjacent to Llywn Henri) in the revised LDP 2018-2033. It has already been determined that the field in question is entirely unsuitable for development due to the area being within flood zones, too close to the main sewerage line and already suffering from existing surface water and sewerage problems.
The implication of building on important natural drainage fields , in fact fields that had been intentionally flooded with untreated sewage by Welsh Water 77 times during 2021 as a necessity, is quite frankly dire.
Remove site from Revised LDP
I wish to register my opposition to the inclusion of SuV20/h1 (land adjacent to Lloyd Henri) in the revised LDP 2018-2033. It has already been determined that the field in question is entirely unsuitable for development due to the area being within flood zones, too close to the main sewerage line and already suffering from existing surface water and sewerage problems.
The implication of building on important natural drainage fields , in fact fields that had been intentionally flooded with untreated sewage by Welsh Water 77 times during 2021 as a necessity, is quite frankly dire.
Please re-consider this proposal.
Regards Mark Spragg.
Yn anghytuno, mae dyraniad y safle o fewn y CDLl at ddibenion preswyl wedi cael ei ystyried yn llawn drwy'r fethodoleg asesu safle. Fel rhan o'r broses asesu hon paratowyd pro fforma safle manwl.
Disagree, the allocation of the site within the LDP for residential purposes has been subject to full consideration through the site assessment methodology. As part of this assessment process a detailed site pro forma has been prepared.
Gwrthwynebu
Ail Gynllun Datblygu Lleol Adneuo Diwygiedig Sir Gaerfyrddin
ID sylw: 4805
Derbyniwyd: 05/04/2023
Ymatebydd: Lisa J Donne
Cydymffurfio â’r gyfraith? Heb nodi
Cadarn? Heb nodi
The reasons being the impact it will have on neighbouring properties and the impact of increased traffic through the village. I also have concerns regarding existing problems regarding surface water and floods due to developments due to take place on flood zones.
Remove site from Plan.
Dear Sir / Madame,
I Lisa Donne of Aweldeg, Porthyrhyd, Carmarthenshire, SA32 8PP wish to object the inclusion of SuV20/h1 in the revised LDP 2018-2033.
The reasons being the impact it will have on neighbouring properties and the impact of increased traffic through the village. I also have concerns regarding existing problems regarding surface water and floods due to developments due to take place on flood zones.
Yours faithfully,
Lisa Jane Donne
Yn anghytuno, mae dyraniad y safle o fewn y CDLl at ddibenion preswyl wedi cael ei ystyried yn llawn drwy'r fethodoleg asesu safle. Fel rhan o'r broses asesu hon paratowyd pro fforma safle manwl.
Disagree, the allocation of the site within the LDP for residential purposes has been subject to full consideration through the site assessment methodology. As part of this assessment process a detailed site pro forma has been prepared.
Gwrthwynebu
Ail Gynllun Datblygu Lleol Adneuo Diwygiedig Sir Gaerfyrddin
ID sylw: 4806
Derbyniwyd: 05/04/2023
Ymatebydd: Mr Rhodri M Donne
Cydymffurfio â’r gyfraith? Heb nodi
Cadarn? Heb nodi
The reasons being the impact it will have on neighbouring properties and the impact of increased traffic through the village. I also have concerns regarding existing problems regarding surface water and floods due to developments due to take place on flood zones.
Remove site from the Plan
Dear Sir / Madame,
I Rhodri Donne of Aweldeg, Porthyrhyd, Carmarthenshire, SA32 8PP wish to object the inclusion of SuV20/h1 in the revised LDP 2018-2033.
The reasons being the impact it will have on neighbouring properties and the impact of increased traffic through the village. I also have concerns regarding existing problems regarding surface water and floods due to developments due to take place on flood zones.
Yours faithfully,
Rhodri Marc Donne
Yn anghytuno, mae dyraniad y safle o fewn y CDLl at ddibenion preswyl wedi cael ei ystyried yn llawn drwy'r fethodoleg asesu safle. Fel rhan o'r broses asesu hon paratowyd pro fforma safle manwl.
Disagree, the allocation of the site within the LDP for residential purposes has been subject to full consideration through the site assessment methodology. As part of this assessment process a detailed site pro forma has been prepared.
Gwrthwynebu
Ail Gynllun Datblygu Lleol Adneuo Diwygiedig Sir Gaerfyrddin
ID sylw: 4807
Derbyniwyd: 05/04/2023
Ymatebydd: Enfys Davies
Cydymffurfio â’r gyfraith? Heb nodi
Cadarn? Heb nodi
Register opposition to the inclusion of SuV20/h1 (land adjacent to Llwyn Henri) to the revised LDP 2018 - 2033.
Any development in Porthyrhyd will affect me personally given the appalling conditions of the sewerage system which overflows into my garden. The pump house alongside my home needs updating desperately.
Remove site from the plan
I wish to register my opposition to the inclusion of SuV20/h1 (land adjacent to Llwyn Henri) to the revised LDP 2018 - 2033.
Any development in Porthyrhyd will affect me personally given the appalling conditions of the sewerage system which overflows into my garden. The pump house alongside my home needs updating desperately.
Thanks.
Yn anghytuno, mae dyraniad y safle o fewn y CDLl at ddibenion preswyl wedi cael ei ystyried yn llawn drwy'r fethodoleg asesu safle. Fel rhan o'r broses asesu hon paratowyd pro fforma safle manwl.
Disagree, the allocation of the site within the LDP for residential purposes has been subject to full consideration through the site assessment methodology. As part of this assessment process a detailed site pro forma has been prepared.
Gwrthwynebu
Ail Gynllun Datblygu Lleol Adneuo Diwygiedig Sir Gaerfyrddin
ID sylw: 4808
Derbyniwyd: 05/04/2023
Ymatebydd: Mr & Mrs S Lowe
Nifer y bobl: 2
Cydymffurfio â’r gyfraith? Heb nodi
Cadarn? Heb nodi
I wish to register my opposition to the inclusion of SuV20/h1 land adjacent to Llwynhenri in the revised LDP 2018-2033
Remove site from the Plan
I wish to register my opposition to the inclusion of SuV20/h land adjacent to Llwynhenri Hendri in the revised LDP 2018-2033
Mr & Mrs Lowe
Yn anghytuno, mae dyraniad y safle o fewn y CDLl at ddibenion preswyl wedi cael ei ystyried yn llawn drwy'r fethodoleg asesu safle. Fel rhan o'r broses asesu hon paratowyd pro fforma safle manwl.
Disagree, the allocation of the site within the LDP for residential purposes has been subject to full consideration through the site assessment methodology. As part of this assessment process a detailed site pro forma has been prepared.
Gwrthwynebu
Ail Gynllun Datblygu Lleol Adneuo Diwygiedig Sir Gaerfyrddin
ID sylw: 4810
Derbyniwyd: 06/04/2023
Ymatebydd: Ms Rhiannon Herridge
Cydymffurfio â’r gyfraith? Heb nodi
Cadarn? Heb nodi
Objection to the inclusion of SuV20/h1.
Exclude the site from the Plan.
To whom it may concern,
I wish to register my opposition to the inclusion of SuV20/h1 (land adjacent to Llwyn Henri) in the revised LDP 2018 - 2033.
With kind regards,
Rhiannon Herridge
Yn anghytuno, mae dyraniad y safle o fewn y CDLl at ddibenion preswyl wedi cael ei ystyried yn llawn drwy'r fethodoleg asesu safle. Fel rhan o'r broses asesu hon paratowyd pro fforma safle manwl.
Disagree, the allocation of the site within the LDP for residential purposes has been subject to full consideration through the site assessment methodology. As part of this assessment process a detailed site pro forma has been prepared.
Gwrthwynebu
Ail Gynllun Datblygu Lleol Adneuo Diwygiedig Sir Gaerfyrddin
ID sylw: 4811
Derbyniwyd: 10/04/2023
Ymatebydd: Miss Sally Hewes
Cydymffurfio â’r gyfraith? Heb nodi
Cadarn? Heb nodi
I wish to register my opposition to the inclusion is SuV20/h1 (land adjacent to Llwyn Henri) in the revised LDP 2018 - 2033.
Remove site from the Plan
Dear Sirs
I wish to register my opposition to the inclusion is SuV20/h1 (land adjacent to Llwyn Henri) in the revised LDP 2018 - 2033.
Yours faithfully
Sally Hewes
Yn anghytuno, mae dyraniad y safle o fewn y CDLl at ddibenion preswyl wedi cael ei ystyried yn llawn drwy'r fethodoleg asesu safle. Fel rhan o'r broses asesu hon paratowyd pro fforma safle manwl.
Disagree, the allocation of the site within the LDP for residential purposes has been subject to full consideration through the site assessment methodology. As part of this assessment process a detailed site pro forma has been prepared.
Gwrthwynebu
Ail Gynllun Datblygu Lleol Adneuo Diwygiedig Sir Gaerfyrddin
ID sylw: 4812
Derbyniwyd: 07/04/2023
Ymatebydd: M Raddenbury
Cydymffurfio â’r gyfraith? Heb nodi
Cadarn? Heb nodi
Objection to site SuV20/h1. Issues include floods / blockages. Toilet water level in my house rises and raw sewerage comes to the maximum level in the garden out of the manholes.
The pumping station cant cope. Originally Welsh water said a pipe had collapsed from the pumping station to the treatment works they repaired the pipe but we are still getting raw sewerage in the garden and its its still coming back in to the house .
There is no way another development will help with the problems we are already dealing with !
This is raw sewerage and it isnt going away .
Remove the site from the Plan.
Proposed development of site at Wernfraith Farm
After reading the letter posted through my door from MAP Steering group I just wanted to make you aware of the problems we face at Glenfryn ( i live at 1 Glenfryn Porthyrhyd) down the road from the proposed site.
I regularly phone Welsh Water (after EVERY heavy rain fall) the floods/blockage we get each time is appaling .To the extent it comes back in to my house.Toilet water level in my house rises and raw sewerage comes to the maximum level in the garden out of the manholes.The pumping station cant cope as Welsh Water keeps fobbing us off with each time .
Everytime this happens the engineer has to reset the pumping station or they call an outside contractor to suck the sewerage away.
Originally Welsh water said a pipe had collapsed from the pumping station to the treatment works they repaired the pipe but we are still getting raw sewerage in the garden and its its still coming back in to the house .
They do respond but it can take up to 4-8 hours each time ! This is a regular occurrence. Depending on the weather.
There is no way another development will help with the problems we are already dealing with !
This is raw sewerage and it isnt going away . I have lived at my property for 7 years and it is an absolute nuisance.
Kind regards
Michelle Raddenbury
Yn anghytuno, mae dyraniad y safle o fewn y CDLl at ddibenion preswyl wedi cael ei ystyried yn llawn drwy'r fethodoleg asesu safle. Fel rhan o'r broses asesu hon paratowyd pro fforma safle manwl.
Disagree, the allocation of the site within the LDP for residential purposes has been subject to full consideration through the site assessment methodology. As part of this assessment process a detailed site pro forma has been prepared.
Gwrthwynebu
Ail Gynllun Datblygu Lleol Adneuo Diwygiedig Sir Gaerfyrddin
ID sylw: 4861
Derbyniwyd: 06/04/2023
Ymatebydd: Ann Hunter
Cydymffurfio â’r gyfraith? Heb nodi
Cadarn? Heb nodi
I wish to register my opposition to the inclusion of SuV20/h1 (land adjacent to Lloyd Henri) in the revised LDP 2018-2033.
Remove site from the Plan
I wish to register my opposition to the inclusion of SuV20/h1 (land adjacent to Lloyd Henri) in the revised LDP 2018-2033. It has already been determined that the field in question is entirely unsuitable for development due to the area being within flood zones, too close to the main sewerage line and already suffering from existing surface water and sewerage problems.
The implication of building on important natural drainage fields , in fact fields that had been internationally flooded with untreated sewage by Welsh Water 77 times during 2021 as a necessity, is quite frankly dire.
Please re-consider this proposal.
Thank you -
kind regards, Ann
Yn anghytuno, mae dyraniad y safle o fewn y CDLl at ddibenion preswyl wedi cael ei ystyried yn llawn drwy'r fethodoleg asesu safle. Fel rhan o'r broses asesu hon paratowyd pro fforma safle manwl.
Disagree, the allocation of the site within the LDP for residential purposes has been subject to full consideration through the site assessment methodology. As part of this assessment process a detailed site pro forma has been prepared.
Gwrthwynebu
Ail Gynllun Datblygu Lleol Adneuo Diwygiedig Sir Gaerfyrddin
ID sylw: 4867
Derbyniwyd: 10/04/2023
Ymatebydd: Mr William Hunt
Nifer y bobl: 2
Cydymffurfio â’r gyfraith? Heb nodi
Cadarn? Heb nodi
I wish to register our opposition to the inclusion of
SuV20/h1{land adjacent to Llwyn Henri} in the revised LDP 2018 – 2023.
Remove site from the Plan
I wish to register our opposition to the inclusion of
SuV20/h1{land adjacent to Llwyn Henri} in the
revised LDP 2018 – 2023.
Yn anghytuno, mae dyraniad y safle o fewn y CDLl at ddibenion preswyl wedi cael ei ystyried yn llawn drwy'r fethodoleg asesu safle. Fel rhan o'r broses asesu hon paratowyd pro fforma safle manwl.
Disagree, the allocation of the site within the LDP for residential purposes has been subject to full consideration through the site assessment methodology. As part of this assessment process a detailed site pro forma has been prepared.
Cefnogi
Ail Gynllun Datblygu Lleol Adneuo Diwygiedig Sir Gaerfyrddin
ID sylw: 5033
Derbyniwyd: 09/04/2023
Ymatebydd: Mr A Yelland
Asiant : Evans Banks Planning Limited
Support the inclusion of the site within the Plan. The respondent notes that the site would represent a logical extension to the settlement and outlines the site's appropriate infrastructure.
No change to the Plan
We are instructed by Mr. A. Yelland to make a formal representation with regards to the
above land and the Second Deposit Draft of the Carmarthenshire Replacement Local
Development Plan.
Our clients made a formal Candidate Site Submission in August 2018, which was referenced
SR/139/002, seeking the allocation of their land for residential development within the
settlement limits of Porthyrhyd as part of the Replacement Local Development Plan.
The Candidate Site comprised of two adjoining undulated grazing fields which are located off
either flank of a private access driveway to Llwynhenry Farm in Porthyrhyd. The fields lie to
the rear of established residential properties which front the eastern flank of an unclassified,
no-through road. The minor road junctions off the B4310 road, some 400 metres south of
where that road underpasses the A48 trunk road, and its elevated slip roads, denoting the
northern part of the village. The southern field enclosure is much smaller than the adjoining
northern field, and has a frontage onto the B road, as well as the minor side road. The
proposals did seek inclusion of residential as a cul-de-sac of bungalows and detached
dwellinghouses stretching across both enclosures.
The land therefore clearly represented a logical extension opportunity to the existing
settlement and its extents are illustrated by the red line below at Plan A.
Following due consideration, the Council included part of southern field at Llwynhenry as a
Residential Allocation in its First Deposit Draft of the Local Development Plan, published in
January 2020. However, for reasons outlined by the Council in their current submissions, a
revised Second Deposit Local Development Plan has now been prepared and published in
January 2023. It is subject to public consultation. As part of the current consultation process
into the Second Deposit Local Development Plan, the Council have again published a “Site
Assessment Table” (January 2023), which provides details of the Council’s analysis of each
received Candidate Site submission. We note that our clients’ land was considered as part of
this process and as a result the Authority concluded as follows: “Part of the site with within
C2 flood risk zone, but a small element of it outside the flood zone will be allocated with
reference SuV20/h1.”
Plan A- Location Plan of Candidate Site
As a result of the above, Plan B represents an extract of the Deposit LDP Proposals Map for
Porthyrhyd, clearly now identifying our client’s land as a Residential Allocation (shaded
brown) within the defined settlement limits:
Plan B – Extract from part of the Proposals Map for Porthyrhyd
Our clients therefore welcome and SUPPORT the decision of the Authority to concur with the representations previously made in relation to our clients’ land.
We can also confirm that the land continues to not face any ecological, flood risk related, highway, infrastructure or land ownership constraints that would restrict its ability to be delivered during the Plan period.
We therefore fully support the decision of the Authority to allocate the land for the purposes of Residential Development as part of the Carmarthenshire Replacement Local Development Plan.
Support welcomed.
Gwrthwynebu
Ail Gynllun Datblygu Lleol Adneuo Diwygiedig Sir Gaerfyrddin
ID sylw: 5053
Derbyniwyd: 12/04/2023
Ymatebydd: B Harkin
Cydymffurfio â’r gyfraith? Heb nodi
Cadarn? Heb nodi
I wish to register my complete opposition to the inclusion of SuV20/h1 (land adjacent to Llwyn Henri) in the revised LDP 2018-2033.
I feel that this a totally unsuitable site for any sort of development.
Remove site from the Plan
I wish to register my complete opposition to the inclusion of SuV20/h1 (land adjacent to Llwyn Henri) in the revised LDP 2018-2033.
I feel that this a totally unsuitable site for any sort of development.
Sincerly,
Bethan Harkin
Resident of Porthyrhyd
Yn anghytuno, mae dyraniad y safle o fewn y CDLl at ddibenion preswyl wedi cael ei ystyried yn llawn drwy'r fethodoleg asesu safle. Fel rhan o'r broses asesu hon paratowyd pro fforma safle manwl.
Disagree, the allocation of the site within the LDP for residential purposes has been subject to full consideration through the site assessment methodology. As part of this assessment process a detailed site pro forma has been prepared.
Gwrthwynebu
Ail Gynllun Datblygu Lleol Adneuo Diwygiedig Sir Gaerfyrddin
ID sylw: 5287
Derbyniwyd: 13/04/2023
Ymatebydd: Mudiad Amddiffyn Porthyrhyd
Cydymffurfio â’r gyfraith? Heb nodi
Cadarn? Heb nodi
Mae MAP yn ymwybodol iawn bod angen datblygu er mwyn cadw pentrefi’n fyw yn ogystal a diwallu’r angen yn lleol am gartrefi fforddiadwy a chartrefi o safon i’w rhentu. Ond mae MAP yn pryderu hefyd am yr ardrawiadau a ddaw yn sgil rhai datblygiadau ac yn dadlau y dylai unrhyw ddatblygiad ym Mhorth-y-rhyd fod yn gydnaws a chymeriad y pentref ac wedi’i godi ar safle sy’n addas.
Cyflwynir tri gwrthwynebiad am y newidiadau ym Mhorth-y-rhyd. Mae’r gwrthwynebiad hwn yn ymwneud a safle preswyl SuV20/h1. Mae’r sylwadau’n nodi hanes y safle as yn nodi’r gwrthwynebiadau fel a ganlyn:.
• Tresmasu i dir agored
• Colli tir amaethyddol
• Colli ardal werdd
• Ardrawiad andwyol ar gartrefi sy’n ffinio
• Colli tir draeniad pwysig
• Parthau llifogydd
• Y bibell ddŵr
• Mynedfa
• Problemau llifogydd a dwr glaw
• Y system garthffosiaeth
___
MAP is fully aware of the need for development to keep villages alive and viable and create affordable homes and decent rental accommodation for local people. However, MAP is also committed to consider the impact of any proposed developments in Porth-y-rhyd and to ensure that any kind of development is in character with the village and is built on a site where there are no issues.
Three objections are submitted for the changes in Porthyrhyd. This objection relates to the housing site SuV20/h1. The representations sets out the history of the site and detail the objections as follows:
• Encroaching onto open land
• Loss of agricultural land
• Green areas
• Impact on neighbouring properties
• Loss of drainage field
• Flood zones
• Pipeline
• Proposed entrance
• Surface water problems
• Sewerage system
Dim byd yn cael ei ddatgan.
___
Nothing stated.
Rhagair
• Mae MAP yn ymwybodol iawn bod angen datblygu er mwyn cadw pentrefi'n 'fyw' yn ogystal â diwallu'r angen yn lleol am gartrefi fforddiadwy a chartrefi o safon i'w rhentu.
Ond mae MAP yn pryderu hefyd am yr ardrawiadau a ddaw yn sgil rhai datblygiadau ac yn dadlau y dylai unrhyw ddatblygiad ym Mhorth-y-rhyd fod yn gydnaws â chymeriad y pentref ac wedi'i godi ar safle sy'n addas.
• Yn hytrach na thrafod cais yn ynysig mae MAP wastad yn ystyried oblygiadau'r pictiwr cyflawn yn enwedig ar adegau pan fo sawl datblygiad yn y pair yr un pryd.
• Mae MAP yn llwyr ymwybodol o'r dasg heriol sydd gan swyddogion Blaen-gynllunio i'w wneud i glustnodi safleoedd ar gyfer cyrraedd targedau.
• Sylweddolwn bod brîff wedi'i roi i Adrannau Blaen-gynllunio ddosbarthu cwota i bob pentref ac nid oes gennym wrthwynebiad i'r argymhelliad hwn o gwbwl. Mae'n ddisgwyliad hollol resymegol a theg fyddai'n arwain at ddosbarthu tai dros ardal eang yn hytrach na rhoi sêl bendith i ddatblygiad mawr fyddai fel ploryn mewn pentref. Popeth yn dda os oes tir addas i'w ddatblygu ar gael. Yn anffodus, mae pentref Porth-y-rhyd yn wahanol i'r rhelyw o bentrefi eraill yn y fro. Mae'n bentref ar lawr dyffryn, y rhan helaethaf ohono o fewn Parthau Llifogydd B ac C2 a phrif bibell yn tramwyo trwyddo. Am y rhesymau uchod a'r ffaith na chaniateir datblygiadau o fewn pellter penodol i'r bibell, tasg heriol yw clustnodi safle addas ym mhentref Porth-y-rhyd.
Dyma'r argymhellion ar gyfer Porth-y-rhyd :
1. Newid y ffin o flaen Tŷ Cynheidre i ddarparu safle ar gyfer ei ddatblygu.
2. Safle SuV20/h1 Tir sy'n ffinio â Fferm Llwyn Henri
3. Wernfraith Mae'r safle wedi'i ddad-ddyrannu o'r CDLl Diwygiedig 2018 – 2033 ond yn dal yn safle wedi'i ddyrannu yn y cynllun mabwysiedig CDLl 2018 sy'n dal mewn grym nes y'i disodlir gan y fersiwn hwn.
Mae'n debygol iawn y bydd cais yn cael ei gyflwyno ar gyfer 42 o dai. Os caiff ei ddatblygu yna bydd yn cael ei gategoreiddio fel Hap-safle.
Teimlir mai dyma'r amser gorau i dynnu sylw at faterion o bwys a phryder i drigolion Porth-y-rhyd. Mae'r adroddiad yn crynhoi'r holl ddadleuon, sylwadau a barn a leisiwyd ganddynt.
Gwerthfawrogir y cyfle i fod yn rhan o'r broses ymgynghori y tro hwn eto.
SYLWADAU'R TRIGOLION
1. NEWID FFIN Y PENTREF
Sylwyd bod newid ffin i gynnwys tir o flaen Tŷ Cynheidre yn cael ei argymell yn y fersiwn diwygiedig hwn.
Rydym ar ddeall nad oes manylion am yr hyn a fwriedir parthed datblygu'r cae ar yr adeg hon yn y broses. Nid oes manylion am y math o ddatblygiad, y nifer o dai na'r math o dai fyddai'n cael eu hadeiladu ar y tir. Efallai mai adeilad arall a fwriedir? Adeilad amaethyddol?
Tynnwyd sylw at y bibell sy'n croesi'r cae. Mae'r bibell yn fwy o faint na'r arferol felly holwyd a oes angen clustogfa o unrhyw fath i ddiogelu'r bibell? Os felly, beth yw mesuriadau'r glustogfa?
A yw'r ffaith bod pibell ddŵr yn croesi'r cae yn mynd i gael unrhyw effaith ar Hyfywedd ac Ymarferoldeb y safle?
Gan nad oes rhagor o wybodaeth ar gael ar hyn o bryd mae'n anodd ymateb yn deg i'r newid hwn. Yr unig opsiwn sydd gan MAP felly ar yr adeg hon yn y broses Ymgynghoriad yw GWRTHWYNEBU.
2. Safle SuV20/h1 Rhan o SR/139/002 a CA0894 * Heb ddod ar draws y cyfeirnod hwn o'r blaen.
Nodir yn y ddogfen drafft nad oes Hanes Cynllunio Perthnasol i'r safle arfaethedig hwn ond credwn ei bod yn holl bwysig edrych yn ôl ar hanes y safle hwn.
2012 -
Cynigiwyd y cae hwn a adwaenwyd fel ALT/159/006/N yn un o saith safle amgen ar gyfer CDLl 2006 - 2018. Roedd y safle yn 0.75 hectar gyda photensial i ddarparu 15 o dai.
Dyma ddyfarniad Ymgynghorydd Cynllunio Annibynnol bryd hynny:
In summary the site is linked but does not completely adjoin an existing cluster of development to the north of the core of the settlement. However, its development would represent the extension of this cluster further into the undeveloped adjoining open countryside. With no key services located at the cluster in question, this is not considered to be the most sustainable location for further development nor would it be in character with the general existing pattern of development of the village. In addition, the level of flood risk (which could be greater than perceived by the DAM) also seriously questions its deliverability.
Gw: Adroddiad am y Safleoedd Amgen yn Llanddarog a Phorth-y-rhyd. Mai 2012.(JCR)
Alternative Site Review Report for Llanddarog and Porth-y-rhyd May 2012.(JCR)
Cyflwynodd MAP ddadleuon ar nifer o'r pwyntiau cynllunio: dwysedd, newid cymeriad y pentref, ardrawiad negyddol ar dai a thrigolion cyfagos, problemau mynedfa a diogelwch, straen ar y gwasanaethau, cynnydd mewn cymudo, colli tir amaethyddol, colli cae draeniad naturiol a allai arwain at broblemau dwys dŵr glaw. Prif bryder MAP oedd y parthau llifogydd C2 a B a'r ffaith bod y brif beipen yn 'anghyfforddus o agos' at y safle.
Mae MAP yn dal i aros am ateb i gwestiwn a holwyd bryd hynny:
Faint o le sydd angen ei gadw'n glir i greu clustogfa ar gyfer gwarchod y bibell?
Cyflwynwyd tystiolaeth amrywiol yn cynnwys Deiseb a arwyddwyd gan dros 300 o bobl.
Cynhaliwyd Profion Methodoleg Asesu'r Safle, Asesiad Cynaliadwyedd, Asesiad Amgylcheddol Strategol a rhestrwyd nifer o resymau Cynllunio cadarn dros wrthod y safle a pheidio â'i gynnwys o fewn y Ffin Datblygu. Yn dilyn Gwrandawiad (HS19) gydag Arolygydd Annibynnol gwrthodwyd y safle:-
The site has been through the Site Assessment Methodology and the consideration of the site has been included within the Assessment of Site paper. It is considered that the site failed Phase 2b of that methodology for the following reasons:
• Development of the site would have a detrimental impact on the character and setting of the settlement or its features (including views and glimpses both into and out of the settlement.)
• In order for this development to take place, it would mean a considerable amount of new vehicular traffic on the minor road which leads to the site. Similar the Council's response during the UDP examination the carriageway would need to be widened to facilitate the development of the land for housing. As a result the land is both unnecessary and unsuitable for allocation.
Yn 2012 roedd y Cae Uchaf yn cael ei gynnig fel safle amgen ar wahân ALT/159/007/N.
Safle 1.2 hectar oedd hwn gyda photensial i ddarparu 24 o dai.
Gwrthodwyd y cae hwn hefyd oherwydd problemau parthed y mynediad ac fel y dywedodd yr Ymgynghorydd Cynllunio:
'In summary, its development would extend the aforesaid cluster in a manner that would alter the current pattern of development and be of a scale that would represent an unsympathetic encroachment into the open countryside. In addition, clear access constraints question its deliverability.'
Argymhellodd yr Adran Blaen-gynllunio wrthod y safle ar sail nifer o ddadleuon cynllunio a dyna oedd dyfarniad yr Arolygydd Annibynnol yn y Gwrandawiad. (Ebrill 2014)
Yn ddiweddarach, cadarnhaodd y Cyngor iddynt wrthod cynnwys y safle yn y CDLl 'yn seiliedig ar broses cadarn a rhesymegol'.
2018 - SR/159/002
Yn 2018 cyfunwyd y cae gwaelod (ALT 159/006/N sef SuV20/h1) a'r cae uchaf (ALT/159/007/N) i greu un safle – y cae gwaelod yn 0.7 h. a'r cae uchaf yn 1.1h. Roedd y cynllun ar gyfer 32 o dai. Argymhellwyd creu mynedfa newydd ar waelod yr hen heol - ymgais i ddatrys y problemau dwys mynediad a fu'n rhannol gyfrifol am iddo gael ei wrthod yn 2014. Golygai fwy na dyblu niferoedd y tai.
Gweler: Adroddiad i Gefnogi'r Safle Dyddiedig Gorffennaf 2018 (JCR)
Bu gwrthwynebiad chwyrn i'r cynllun a rhyddhad pan gafodd ei wrthod.
2020
Yn 2020 penderfynodd yr Adran Blaen-gynllunio ar y canlynol:
• Gwrthod cynnwys y cae uchaf i'r gogledd-ddwyrain fel rhan o'r safle.
• Hepgor ardal de-orllewinol y cae gwaelod sy'n ffinio â'r B4310.
• Argymell codi 6 o dai yn unig ar y cae.
* Ni fydd y nifer tai yn bendant nes y cyflwynir cais cynllunio manwl.
Roedd hepgor y cae uchaf yn gyfangwbl a'r ffaith na fyddai adeiladu ar dir o fewn y parthau llifogydd yn newyddion i'w groesawu. Rhaid cydnabod hefyd bod 6 o dai yn fwy synhwyrol fel datblygiad i bentref o faint Porth-y-rhyd.
Rhaid pwysleisio NAD yw MAP yn gwrthwynebu datblygu ond mae'n gwrthwynebu adeiladu ar safleoedd anaddas all arwain at ardrawiadau negyddol yn enwedig o ran problemau dŵr glaw a'r system garthffosiaeth.
Er yr addasiadau teimlai'r trigolion bod raid gwrthwynebu y tro hwn eto oblegid mai dyma'r union gae a ddyfarnwyd yn safle anaddas ar gyfer ei ddatblygu yn 2014 a bod y rhesymau dilys dros ei wrthod bryd hynny yn dal dŵr o hyd!
2023 - SuV20/h1
Ar hyn o bryd nid oes manylion pellach ar gael parthed cynllun y safle, y fynedfa arfaethedig, y math o gartrefi y bwriedir eu darparu nac ychwaith y nifer o dai. Yr unig beth a wneir yw cadarnhau bod lle i godi 5+ o dai. Gall hynny olygu 6? / 10? / 14?
Ymddengys bod yr Ymgeisydd wedi cyflwyno tystiolaeth parthed Hyfywedd ac Ymarferoldeb y safle (Gw. Pwynt 28 Hyfywedd ac Ymarferoldeb) ond nad yw'r wybodaeth honno ar gael i'r cyhoedd.
Mae teimlad cryf yn y pentref mai dyma'r union gae a wrthodwyd am resymau cynllunio cadarn yn y gorffennol. Mynegwyd pryder hefyd am yr amwysedd a'r ansicrwydd parthed nifer tai.
Cytunwyd felly i gyflwyno dadleuon a thystiolaeth cyn y dyddiad cau gan hyderu y cawn gyfle eto i ymateb yn llawnach i'r cynllun unwaith y bydd gwybodaeth bellach parthed SuV20/h1 ar gael i'r cyhoedd.
Cytunwyd bod MAP yn datgan GWRTHWYNEBIAD i gynnwys safle SuV20/h1 yn y CDLl Diwygiedig 2018 – 2033 ar sail y dadleuon canlynol..
1. Tresmasu i dir agored
Byddai datblygiad ar y safle hwn yn tresmasu i dir agored. Dyna un o'r rhesymau pam y'i gwrthodwyd yn 2014. Ni fyddai'n estyniad naturiol.
'Its development would represent the extension of this cluster further into the undeveloped adjoining open countryside'.
Dyfyniad o adroddiad Ymgynghorydd Cynllunio yn 2014
2. Colli tir amaethyddol
Yn yr adran sy'n ystyried Ystyriaethau Amgylcheddol noda bwynt rhif 21 nad yw'r safle'n cynnwys tir amaethyddol o ansawdd uchel (gradd 1,2,3a) ond prydera'r trigolion lleol am ddiflaniad cae arall ellid ei ddefnyddio i'r dyfodol fel cae amaethyddol. Mae cymaint o sôn yn dilyn Brexit am bwysigrwydd ffermio a chynhyrchu bwyd yn lleol.
Onid oes angen dwys ystyried pa ddewis sydd orau. Ai defnyddio'r cae ar gyfer adeiladu tai arno a choncritio tir draeniad pwysig neu'i ddiogelu ar gyfer ei amaethu am flynyddoedd i ddod a dal gafael mewn cae pwysig o ran ei rôl yn draenio dŵr glaw?
3. Colli ardal werdd
Mae cymaint o sôn am bwysigrwydd yr amgylchedd ac ardaloedd gwyrdd o ran lles ac iechyd trigolion ac mae Deddf Llesiant Cenedlaethau'r Dyfodol (Cymru) 2015 yn hyrwyddo gwarchod ein hamgylchedd hardd er lles trigolion.
Mae Cwm Gwendraeth yn hen ardal ddiwydiannol ac mae digon o safleoedd brown o fewn tafliad carreg i'r safle hwn. Pam na ellir datblygu'r rheiny cyn troi golygon at dir gwyrdd?
Beth am yr holl siopau ac adeiladau gwag yn ein trefi – Rhydaman, Llanelli a Chaerfyrddin?
Does bosib bod digon o safleoedd addas wedi'u dotio led led y Sir – safleoedd y gellid eu datblygu'n ddidrafferth a di-wrthwynebiad er mwyn darparu cartrefi yn gyflym i gwrdd â'r galw yn lleol.
Arwyddodd drigolion y pentref Ddeiseb yng Ngwanwyn 2019 yn gofyn yn garedig am i chwi wneud hynny.
4. Ardrawiad andwyol ar gartrefi sy'n ffinio
Dau fyngalo yn unig sydd yn ffinio â'r cae hwn. Mae'r tai eraill cyfagos yn dilyn patrwm llinellol o boptu'r hen heol. Nid colli golygfa, preifatrwydd neu olau yn unig all ddigwydd i drigolion y byngalos ond gall eu tai – eu heiddo a'u buddsoddiad - ddibrisio dros nos unwaith yr adeiledir tai yn union o'u blaenau.
Mae Polisi GP1 y CDLl yn pwysleisio pwysigrwydd ystyried a yw datblygiad yn gweddu i'r hyn sydd o'i gwmpas 'o ran graddfa ac uchder …. ac na ddylai gael effaith andwyol o ran ardrawiad gweledol, golau, preifatrwydd.'
'the importance that developments are compatible with their surroundings in terms of scale, height, massing, and general topography of locality.... must not adversely affect local amenity in terms of
visual impact, loss of light and privacy, disturbance and traffic movement....'
Mae’r safle hwn ar lechwedd gyda lefel y tir yn codi'n sylweddol o'r ffordd (B4310) islaw.
Oni fydd hyn yn achosi problemau? Tybed pa fath o dai a ganiateir ? Ai byngalos neu dai?
A fydd toi y tai newydd yn tyrru uwchben y cartrefi cyfagos?
Sylwer ar sylwadau'r Adran Gynllunio pan wrthodwyd y safle yn 2014.
• Development of the site would have a detrimental impact on the character and setting of the settlement or its features (including views and glimpses both into and out of the settlement.)
Beth sydd wedi newid?
5. Colli tir draeniad pwysig
Ni colli tir glas yn unig fyddai canlyniad datblygu'r cae hwn. Byddai concritio'r cae yn golygu colli cae draeniad naturiol pwysig arall a fyddai yn ei dro yn arwain at ddwysáu'r problemau dŵr glaw sy'n bodoli'n barod yn y rhan hon o'r pentref.
Ar hyn o bryd mae'r holl ddŵr glaw yn llifo o'r llethrau cyfagos i ddraenio yn y cae hwn.
Yn aml gwelir pyllau ar y cae a phan fydd yn ddyfrlawn llifa'r dŵr ar draws y B4310.
Hoffai MAP dynnu sylw at y ffaith nad argymell peidio ag adeiladu ar Barthau Llifogydd yn unig a wneir erbyn hyn ond i beidio ag adeiladu ar dir sy'n ffinio â Pharthau Llifogydd hefyd.
Mae'r neges yn glir. Dyma'r caeau pwysig o ran draeniad.
6. Parthau Llifogydd
Yn y Gwrandawiad (HS19) Ebrill 2014 gofynnodd yr Arolygydd Annibynnol i'r Awdurdod Cynllunio Lleol gadarnhau a oedd y cae hwn o fewn Parth Llifogydd B ac C2 fel yr honnai MAP ai peidio.
LPA to confirm whether alternative site ALT/159/006/N 'Land east of Llwyn Henry Farm' is within a TAN 15 DAM Flood Zone.
The map in Appendix 3 indicates the TAN 15 DAM Flood Zone maps for ALT/159/006/N
The southern and western sections of the site lie within Zone B, with a part of the site within Zone C2'
Does dim wedi newid. Mae rhan isaf y cae yn dal o fewn Parthu Llifogydd C2 a B.
7. Y Bibell Ddŵr
Gofid arall i'r trigolion yw bod y safle arfaethedig hwn yn 'anghyfforddus o agos' at y bibell sy'n cludo dŵr o Orsaf Bwmpio Nantgaredig i Felindre.
Cytunai'r Ymgynghorydd Cynllunio yn 2014 : 'the pipeline skirts the site'.
Rhaid cadw llain o dir yn glir o boptu'r bibell i greu clustogfa neu Goridor Diogelwch.
A oes unrhyw ran o safle SuV20/h1 yn tarfu ar y Coridor Diogelwch hwn?
8. Mynedfa:
Ceisiwyd datrys problemau'r fynedfa i'r safle drwy argymell creu agoriad newydd yn agos at y gyffordd ar waelod y lôn. Byddai hyn yn arbed i yrwyr y safle ddefnyddio'r lôn gul, un trac, 10 -12 troedfedd o led mewn mannau.
Nid yw'r lleoliad hwn yn addas o gwbwl ar gyfer mynedfa. Mae'r B4310 yn ffordd brysur yn enwedig yn ystod yr oriau brig ac nid yw'r gwelediad i'r ddau gyfeiriad yn dda o gwbwl. Ffordd gul droellog yw'r B4310 o Glenfryn draw at sgwar y pentref. Oherwydd nad oes gan y teras o dai ar y chwith garej na lle i barcio'r ceir does dim dewis ganddynt ond parcio ar y ffordd.
Rhaid ystyried hefyd yr holl drafnidiaeth ychwanegol fydd yn teithio heibio'r safle arfaethedig hwn pan fydd SWTRA yn cau cyffordd Foelgastell i'r ddau gyfeiriad a chyffordd Llanddarog i gyfeiriad Crosshands. Golyga hyn y bydd holl gymudwyr pentrefi Llanddarog, Llangyndeyrn, Cwm Mawr, Mynydd Cerrig, Foelgastell a Drefach yn defnyddio'r B4310 heibio'r safle hwn ddwywaith y dydd.
Dyma ddyfyniad o lythyr SWTRA :
'the closure of, or modifications to existing junctions will clearly result in traffic having to divert along minor roads and the implications of this needs to be fully taken into account.'
Bob tro y mae digwyddiad ar y ffordd ddeuol A40 rhwng Crosshands a Chaerfyrddin dargyfeirir y cerbydau drwy bentref Porth-y-rhyd. Digwydd hyn yn bur gyson.
Teimla'r trigolion nad yw'r ffaith bod modd cael mynedfa arall i'r cae yn datrys yr holl broblemau dwys eraill.
9. Problemau llifogydd a dŵr glaw.
Un o brif ofidiau'r trigolion yw'r problemau dŵr glaw a ddaw yn sgil datblygu safleoedd anaddas.
Mae hanesion am lifogydd yn y pentref yn dyddio'n ôl flynyddoedd lawer. Adroddodd un o'r trigolion, a oedd yn ei nawdegau ar y pryd, ei hatgofion am lifogydd pan oedd hi'n blentyn. Disgrifiodd yr holl ddŵr yn llifo fel afon o'r llethrau ac i mewn i'r tai.
Yn fuan wedi i'r gwaith ar ddatblygiad Clôs y Wennol ddechrau ffurfiodd llyn mawr o amgylch dau o fyngalos tai'r henoed – Cwm Cati – wedi glaw trwm. Wrth bwmpio'r dŵr dywedodd swyddog y Frigad Dân ei bod yn 'gwbl amlwg nad oes unman i'r dŵr fynd iddo.' Nid dyna'r unig dro. Galwodd yr henoed sawl gwaith dros y blynyddoedd am gymorth cymdogion i fopio, glanhau a diogelu eu heiddo.
Bob tro yn dilyn glaw trwm gwelir 'llynnoedd' yn ymddangos ar gaeau yn y pentref – y cae hwn a chae Wernfraith.
Adeiladwyd ar Barth Llifogydd ac ar gae draeniad allweddol bwysig yng nghanol y pentref. Concritiwyd y cae hwn oedd arfer delio â'r holl ddŵr a lifai o'r llechweddau gan ei atal rhag achosi problemau ar y sgwar ac i dai cyfagos dros y ffordd.
Rhyddhad yn wir oedd gweld bod yr Adran Blaen- gynllunio wedi gwrthod safle amgen arall yng nghalon y pentref yn 2019 – safle sydd ar barth llifogydd ac a fyddai wedi creu problemau dwys i'r cartrefi cyfagos.
Edrychwch ar y lluniau o'r llifogydd yn 2009 a'r casgliad o ffotograffau sydd yn yr atodiad.
Mae problemau dŵr glaw yn ardal y safle hwn ger Llwyn Henri. Llifa'r holl ddŵr glaw o'r bryn ac o ddatblygiad yr hen heol fach i'r cae gwaelod hwn sydd â rhan ohono o fewn parth llifogydd C2 a B. Mae'r cae yn aml yn ddyfrlawn a phwll yn ffurfio ar y gwaelod bob tro y cawn law trwm.
Gweler y ffotograff a dynnwyd ar Ebrill 11eg 2023 wedi pedair awr o law trwm.
Mae angen dwys ystyried i ble fydd yr holl ddŵr glaw yn llifo pe concritir y cae hwn?
Ychydig draw o'r safle hwn mae ardal arall gyda phroblemau dŵr glaw oherwydd i'r ceuffosydd a'r gwteri gael eu blocio pan godwyd y tai newydd.
Blerwch, diffyg cynllunio a diffyg monitro achosodd yr hunllef hwn i'r trigolion sy'n byw ger y datblygiad anorffenedig.
Mae gennym ffeil o ohebiaeth sy'n croniclo dros 20 mlynedd o ddiflastod trigolion.
Yng ngeiriau un o'r trigolion yn ddiweddar “er bod datblygwr yn honni y gall ddatrys problem dŵr glaw ar y safle nid dyna'r realiti a gadewir trigolion i ddelio â chanlyniadau ardrawiad negyddol y datblygiad ar eu liwt eu hunain! '
10. Y system garthffosiaeth
Bu cryn gyhoeddusrwydd yn ddiweddar am ollwng carthion heb eu trin i'r afonydd. Achosir y broblem oherwydd bod system dŵr glaw a'r system garthffosiaeth yn un system gyfunol.
Yn ôl ystadegau 2021 Dŵr Cymru digwyddodd hyn 77 gwaith yn yr Orsaf Bwmpio ym Mhontfaen. Nid yw'r ffigwr hwn yn cynnwys yr holl adegau y llifodd carthion yn 'ddamweiniol' ar gaeau a gerddi.
• Mae Pwmp Pontfaen sy'n pwmpio'r gwastraff i Orsaf Cwmisfael wedi dyddio ac er iddo gael ei uwchraddio flynyddoedd yn ôl nid yw'n ymdopi'n effeithiol. Nid yw hynny'n syndod gan na fwriadwyd i'r pwmp hwn ddelio â gwastraff cymaint yn fwy o dai yn ogystal â'r dŵr glaw ychwanegol sy'n llifo o gaeau a goncritiwyd.
• Adeiladwyd dros 40 o dai yn y pentref ers c 2000 - cynnydd o 43%.
• Adeiladwyd yr holl gartrefi ychwanegol ond ni fu unrhyw waith uwchraddio ar y system.
• Sut mae disgwyl i'r system ymdopi os bydd mwy o ddatblygu eto yn y pentref ac yn Llanddarog gan mai'r UN system sy'n gwasanaethu'r ddau bentref.
• Gwerthfawrogwn bod yr Adran Gynllunio yn ystyried pob cais yn unigol gan wneud hynny'n gwbwl deg a phroffesiynol ond mae'n hanfodol edrych ar y pictiwr llawn.
• Ar hyn o bryd mae cynllun i godi 42 o dai ar safle Wernfraith. Does dim amheuaeth y byddai caniatáu'r datblygiad hwn yn achosi ardrawiad trychinebus o ran y system garthffosiaeth a dŵr glaw yn y pentref.
• Clwstwr bach o dai a argymhellir ar y safle hwn a ger Tŷ Cynheidre (o bosib) OND mae'n bwysig rhifo'r tai i gyd i sylweddoli faint o straen ychwanegol fydd ar y system.
Porth-y-rhyd Wernfraith 42
SuV20/h1 6 6? 10? 14?
Cynheidre 5 ?
Llanddarog SuV19/h1 16 (0.903 hectar)
SuV19/h2 15 ( 0.863 hectar)
Hap safleoedd eraill - Amhosib dyfalu nifer!
Mae'r cyfanswm isaf posib yn 84 o dai ond gallai fod yn llawer uwch.
Dychmygwch y straen anferthol ar system ddiffygiol gyda'r holl dai ychwanegol.
Rhaid cofio bod Porth-y-rhyd wedi bod dan fygythiad yn 1963 pan oedd Corfforaeth Ddŵr Abertawe am foddi'r pentref. A oes perygl iddo gael ei foddi yn 2023!
Cysylltodd MAP â Dŵr Cymru a chadarnhawyd ganddynt bod angen uwchraddio systemau pentrefi cefn gwlad Cymru ac NA fydd cyllid i gyflawni'r gwaith yn y dyfodol agos o gwbwl.
Beth fydd y sefyllfa yn y cyfamser ?
Gwaethygu fydd y tywydd i'r dyfodol a byddwn ni, a'r cenedlaethau fydd yn ein dilyn yn gorfod delio gyda'r canlyniadau.
Bydd yn rhy hwyr i wyrdroi'r sefyllfa unwaith y bydd cae wedi diflannu dan goncrid.
Mae'r argymhellion gan yr arbenigwyr yn nodi'n glir ei bod yn annoeth adeiladu ar gaeau nesaf at barth llifogydd gan mai'r rhain yw'r caeau draenio holl bwysig.
Mae'r neges yn glir yn llythyr Julie James AS Y Gweinidog Newid Hinsawdd (Tachwedd 23ain 2021).
Given the immediate and serious challenges posed by the climate emergency, a ’business as usual’ approach ... is no longer a viable option. Taking meaningful action to address climate change will mean taking difficult and sometimes unpopular decisions. The planning system is at the forefront of responding to the climate emergency and ensuring the well-being of current and future generations.
The decisions local planning authorities make today will have a profound effect on how we adapt to climate change now and in the future. It is particularly important that we protect homes from flooding, when we know the devastating impact it can have on health and well-being.
Gwerthfawrogwn barodrwydd yr Ymgeisydd i addasu'r safle sawl gwaith.
Gwerthfawrogwn benderfyniadau'r Adran Blaen-gynllunio a'u hargymhellion diweddaraf.
OND
• er bod y cae uchaf wedi'i hepgor,
• er bod y safle wedi'i docio fel nad yw o fewn Parth Llifogydd
• ac er bod y nifer tai a argymhellir bellach yn fwy rhesymol (5+ ?)
mae'r pryder parthed problemau dŵr glaw a'r system garthffosiaeth yn gorbwyso hyn oll.
3. WERNFRAITH
Mae MAP wedi astudio'n fanwl gynlluniau'r datblygwyr POBOL Group a JONES (Henllan).
Bydd yr ardrawiad yn hunllefus.
Bwriedir GWRTHWYNEBU unwaith y cyflwyna'r datblygwyr gais cynllunio.
Yn y cyfamser ymatebodd trigolion y pentref i'r Ymgynghoriad Cyn Ymgeisio a drefnwyd gan yr Asiant Evans Banks. Cyflwynwyd 165 llythyr yn datgan GWRTHWYNEBIAD a nifer fawr o ebyst.
Bwriedir brwydro yn erbyn y datblygiad arfaethedig hwn.
• MAP is fully aware of the need for development to keep villages 'alive and viable' and create affordable homes and decent rental accomodation for local people. However, MAP is also committed to consider the impact of any proposed developments in Porth-y-rhyd and to ensure that any kind of development is in character with the village and is built on a site where there are no issues.
• Although MAP debates applications individually when they are submitted, it also looks at the broader picture and tries to determine the true impact all developments combined (if granted permission) would have on the village.
• MAP appreciates the challenge facing Forward Planning Officers to identify suitable sites for developments in order to reach targets set.
• MAP realises that Forward Planning has been given a brief to ensure that all villages are allocated a quota - a reasonable argument to be commended as it would avoid the danger of a massive 'carbuncle' of a development being forced on one village. In theory this is all well and good provided that there are suitable sites available. That unfortunately is not the case in Porth-y-rhyd – a village on the valley floor, within designated Flood Zones and with a pipeline traversing across it. It is, therefore, a far more challenging task.
These are the recommendations for Porth-y-rhyd:
• Change of boundary to include land near Tŷ Cynheidre for development.
• Site SuV20/h1 Land adjacent to Llwyn Henri
• Wernfraith Although this site has been de-allocated in the Revised LDP 2018 – 2033
it remains an allocated site in the current LDP 2006-2018. Our understanding is that when the Revised LDP will come into force Wernfraith will be classified as a Windfall Site.
Residents are of the opinion that this is the time to draw the attention of the Planning Authority to important issues and concerns. It was decided to compile a report on their behalf summarizing all concerns, comments and opinions expressed by the deadline of April 14th and hopefully have the opportunity to respond to specific details relating to SuV20/h1 and the change of boundary once information is available to the public.
MAP appreciates the opportunity to participate in this Consultation.
1. CHANGE OF BOUNDARY
It appears that a change of boundary is recommended to include a field below Tŷ Cynheidre.
We understand that no information is available at this stage in the process as to the kind of development intended, the number of dwellings or the type of homes. It is therefore difficult to respond to this change in boundary without having all the relevant details. Perhaps a different type of building will be proposed – a farm building?
MAP's attention was drawn to the fact that another pipeline crosses this field.
This pipeline is wider than the usual water supply pipes. Is there a need to ensure a buffer zone on either side of the pipeline? If so, what measurements would that entail?
Will the fact that a pipeline crosses this field affect the Viability and Deliverability?
As there is no information available at this stage in the process to enable MAP to respond in a fair and proffesional way there is only one option open to us which is to OPPOSE.
2. Candidate Site SuV20/h1 Part of SR/139/002
CA0894*Have not seen this refernce before.
It is stated in the draft that there is no Relevant Planning History to this proposed site but the residents believe it is vitally important to look back on the planning history of this site.
2012
This field referred to as ALT/159/006/N was submitted at the Deposit LDP stage as one of seven alternative sites to be included in the Local Development Plan 2006 - 2018 (adopted in 2014). The site was 0.75 hectares with a proposed potential capacity for 15 units.
This was the conclusion reached at that time by an independent Planning Consultant:
In summary the site is linked but does not completely adjoin an existing cluster of development to the north of the core of the settlement. However, its development would represent the extension of this cluster further into the undeveloped adjoining open countryside. With no key services located at the cluster in question, this is not considered to be the most sustainable location for further development nor would it be in character with the general existing pattern of development of the village. In addition, the level of flood risk (which could be greater than perceived by the DAM) also seriously questions its deliverability.
See: Alternative Site Review Report for Llanddarog and Porth-y-rhyd May 2012.
The action group MAP acted on behalf of the residents presenting evidence on planning issues such as density, the change in character of the village, negative impact on neighbouring properties, problems with the then proposed entrance and increase in vehicles using the narrow winding old lane, strain on services, school had reached it's capacity, increase in commuting, loss of agricultural land, and loss of drainage field that would lead to more problems relating to surface water.
MAP's main concern was the fact that areas of the field were within flood zones B and C2 and that the main pipeline from Nantgaredig to Felindre skirted the site.
MAP still awaits an answer to a question asked in 2012:
What area needs to be kept clear of developments in order to create a buffer zone or corridor of protection?
Evidence was presented at the time including a Petition signed by over 300 residents (95% of the residents).
Site Assessment Methodology, Sustainability Appraisal / Strategic Environmental Assessment etc were carried out and following a robust and rational site selection process the boundary was drawn to exclude the site. At the Hearing it was confirmed by the LPA that alternative site ALT 159/006/N 'Land east of Llwyn Henry' is within a TAN 15 DAM Flood Zone as argued by MAP. Following the Hearing chaired by an Independent Planning Inspector the site was turned down.
The site has been through the Site Assessment Methodology and the consideration of the site has been included within the Assessment of Site paper. It is considered that the site failed Phase 2b of that methodology for the following reasons:
• Development of the site would have a detrimental impact on the character and setting of the settlement or its features (including views and glimpses both into and out of the settlement.)
• In order for this development to take place, it would mean a considerable amount of new vehicular traffic on the minor road which leads to the site. Similar the Council's response during the UDP examination the carriageway would need to be widened to facilitate the development of the land for housing. As a result the land is both unnecessary and unsuitable for allocation.
The upper field was also submitted for consideration as an alternative site in 2012 - ALT/159/007/N. The site size of 1.2 hectares had a potential capacity for 24+ units.
The Independent Planning Consultant stated: 'In summary, its development would extend the aforesaid cluster in a manner that would alter the current pattern of development and be of a scale that would represent an unsympathetic encroachment into the open countryside. In addition, clear access constraints question its deliverability.'
Forward Planning Dept. proposed the site be refused based on numerous planning issues and that was also the decision of the Independent planning Inspector at the Hearing. (April 2014)
The Council confirmed that the site had been refused based on a robust and rational process.
2018 – SR/159/002
A new proposal was submitted in 2018 – 2019 . The lower field (ALT/ 159/006/N now SuV20/h1 ) was combined with the upper field (ALT/159/007/N) to create one large site – the lower field of 0.7 hectares and the larger upper field of 1.1 h. The proposal was for 32 houses. Access would now be at the bottom of the lane, thus avoiding the use of existing narrow lane. It also meant that the number of dwellings would more than double.
See: Candidate Site Supporting Statement dated July 2018 (JCR)
There was overwhelming opposition to this proposal and relief when it was REFUSED.
2020
• The north-eastern upper field enclosure is no longer included. in the Revised Local Development Plan 2028 - 2033
• A portion of the lower south - western field that extends along the B4310 has also been excluded. Only part of the lower field is allocated for housing.
• Forward-Planning Dept. has identified 6 dwellings as being indicative for the site.
(Exact housing figures for the site will be determined when a detailed planning application is submitted).
The fact that the upper field has been excluded is welcomed as is the fact that there will be no building on the flood zone areas. A development of six dwellings also seems far more reasonable in a village the size of Porth-y-rhyd. We must stress that MAP is not opposed to developments but is concerned when developments are proposed on unsuitable sites where the impact will have a detrimental effect especially regarding surface water and sewerage problems.
However, as this is the exact same field that was categorically refused in 2014 following a Public Hearing and regarded as an unsuitable site for development, MAP objected.
2023 - SuV20/h1
It is impossible for MAP to respond as we would have wished to SuV20/h1 as no detailed information is available to date regarding the plan of the site, the proposed entrance, the type of houses or the exact number of dwellings. It is confirmed that the site can accommodate 5 or more dwellings. What exactly does this mean? 6 / 10 / or more?
The Applicant has provided 'sufficient evidence to show that the development is deliverable and financially viable' (See Point 28. Viability and Deliverability) and that was all the requirement at the current stage in the process. This document is not in the public domain.
It was agreed that MAP would compile a report summarizing the arguments and evidence of the residents and respond again to the detailed information available once that is in the public domain. .
1. Encroaching onto open land.
This proposed development would be encroaching onto open land. It is not a 'natural extension'.
That was one of the main arguments in 2014 that led to it's refusal.
'Its development would represent the extension of this cluster further into the undeveloped adjoining open countryside'.
Report of the Planning Consultant in 2014 (JCR)
2. Loss of agricultural land
In the section dealing with Environmental Consideration it is stated in Point 20 that the site does not contain high quality agricultural land (Grade 1, 2 or 3a.) but the local residents fear that yet another agricultural field will disappear under concrete – a field that would be of agricultural value to future generations. There has been so much discussion since Brexit of the importance of farming and producing food locally. Should we not pause to consider which is the best option? To build on this field and lose a drainage field in the process or to preserve it for agricultural use for years to come and retain an important natural surface water drainage field?
3. Green areas
There is so much talk today about the importance of green areas to support people's physical and mental well-being. Well-being of Future Gebnerations (Wales) Act 2015 .
Should we not be protecting our green areas?
The Gwendraeth Valley was an industrial area and there is an abundance of brown-field sites within a short distance from this site which could accommodate the council's targets for housing. Why not concentrate on all these available areas before setting sights on the green fields? Not only is it unsustainable but it's unacceptable that agricultural land is sacrificed.
What about all those empty buildings and shops in Rhydaman, Llanelli and Caerfyrddin?
Surely there are more suitable options for development across Carmarthenshire as a whole.
4. Impact on neighbouring properties
This proposed development would have an impact on the neighbouring properties.
Policy GP1 / LDP stresses the importance that a development is compatible to its surroundings:
'the importance that developments are compatible with their surroundings in terms of scale, height, massing, and general topography of locality.... must not adversely affect local amenity in terms of visual impact, loss of light and privacy, disturbance and traffic movement....'
This particular field is on a steep slope – the land rising suddenly from the level of the B4310 road below. What type of dwellings will be built there? Will they be bungalows or three storey houses? Will the roofs of the new properties tower over existing properties?
• Development of the site would have a detrimental impact on the character and setting of the settlement or its features (including views and glimpses both into and out of the settlement.)
Forward Planning statement in 2014.
Two bungalows are sited adjacent to the site. Those living there are presently able to enjoy the view of the open countryside. However, it would not only be a case of loss of vista, privacy and light. There is a possibility that the propoerties could devalue overnight once dwellings are built directly in front of them.
All other properties on the old lane are of a linear pattern.
5. Loss of drainage field
Not only will developing this field be a loss of agricultural land but also mean that yet another important drainage field will be lost. This would exacerbate existing serious problems with surface water in this part of the village.
All surface water flows from the developed area along the old lane and from surrounding area into this field. Very often large pools will appear on the field and once the field is saturated that surface water floods onto the B4310. Enclosed photos show this field after 4 hours of heavy rainfal on April 11th 2023.
The recommendation today is to refrain from developing not only sites within Flood Zones but land adjacent to Flood Zones.
The message is loud and clear. These fields are the important natural drainage areas and without them surface water problems will intensify.
We undrstand that a developer is expected to deal with surface water on site but from past experiences in this village that is definitely not the case!
6. Flood Zones
At the Public Hearing (HS19) in April 2014 the Independent Planning Inspector requested that the Planning Authority confirm whether or not this particular field was within designated Flood Zones
as MAP argued.
LPA to confirm whether alternative site ALT/159/006/N 'Land east of Llwyn Henry Farm' is within a TAN 15 DAM Flood Zone. This was done.
The map in Appendix 3 indicates the TAN 15 DAM Flood Zone maps for ALT/159/006/N
The southern and western sections of the site lie within Zone B, with a part of the site within Zone C2.
Nothing has changed. The lower section of the field lies within designated Flood Zones B and C2.
Although this portion of the field is not included in this revised site, MAP hopes that consideration will be given to the argument presented.
7. Pipeline
MAP is concerned about the proximity of this proposed allocation to the strategic main water pipeline from Nantgaredig Pumping Station to Felindre Water Treatment Works.
The Planning Consultant agreed back in 2014 that the pipeline 'skirts the site'.
MAP is aware that there should be a defined area of land on either side of the pipeline as a Buffer Zone or Corridor of Protection to protect the pipeline from damage.
Is it your opinion that the development of site SuV20/h1 would impinge on said Protection Corridor?
8. Proposed Entrance:
Minor adjustments have been made to try and overcome some of the hurdles faced last time e.g. a new entrance proposed. It is now suggested that an opening be created to access the proposed site from the initial section of the lane near the junction thus avoiding site vehicles utilising the narrow one-track lane which is 10 – 12 feet in places.
This plan may have solved the issue regarding said lane to some extent, however, proposing a new access at this location raises further concerns.
A different entrance definitely does not erase all the other serious issues.
This is not an ideal location for an entrance. The B4310 is a busy road especially twice daily during peak times and visibility in both directions is poor.
The road from Glenfryn/ Derwen Deg towards the village square is narrow and winding with a sharp bend to cross the bridge. As a terrace of properties to the right hand side of the road towards the A40 junction have no off road parking spaces or garages, there is no option but to park cars on the roadside.
It is important to be aware of other possible developments (as well as housing developments) that would have an impact on traffic in the future. Should funding become available SWTRA will review Phase 2 of the plan to close or adapt junctions between Crosshands and Caerfyrddin – the Foelgastell Junction in both directions and the Llanddarog Junction from the direction of Caerfyrddin - resulting in a massive increase in vehicles travelling through Porth-y-rhyd. All commuters from the neighbouring villages of Llanddarog, Llangyndeyrn, Cwm Mawr, Mynydd Cerrig, Foelgastell and Drefach will be using the B4310.
This is a quotation from a letter received from SWTRA.
'the closure of, or modifications to existing junctions will clearly result in traffic having to divert along minor roads and the implications of this needs to be fully taken into account.'
It is also important to keep in mind that each time an incident occurs on the A40 between Caerfyrddin and Crosshands traffic is diverted through Porth-y-rhyd. This occurs often.
9. Surface water problems
One of the main concerns regarding developments on unsuitable sites in the village is the impact on existing surface water problems.
There is a history of flooding in the village dating back many years. An elderly resident in her 90's used to describe an incident that happened in her childhood . Her recollection was vivid - of a river flowing towards the square and how the residents in those properties had to open the back door for the water to flow through as there was no other option.
Shortly after work began on the development known as Clôs y Wennol a 'lake' appeared surrounding two of the dwellings in Cwm Cati. The Fire Brigade officer exclaimed that there was absolutely nowhere the water could flow to. That was not the only time problems occurred as a result of surface water. Elderly residents in Cwm Cati had to call on their neighbours on numerous occassions following heavy rainfall to help them mop up, clean and protect their properties.
Some fields are prone to ponding and large ponds appear following heavy rainfall on both this field and the Wernfraith proposed site.
Enclosed photos testify to the result of building on a Flood Zone and on a natural drainage field in the centre of the village. Other photos show the flooding that happened in 2009.
Residents are so fortunate that another site on a flood plain was turned down as an allocation for the LDP in 2019 as serious issues would have ensued. It was such a relief!
Surface water problems have existed in the area of this proposed development for years. All surface water flows from the sloped area behind and from the development along the old lane into this field which lies within flood zones. A portion to the southern side lies within zone C2 and an extensive area within zone B. Anecdotal evidence will confirm that this field is often saturated with a pond forming in the lower corner.
Where will all the surface water flow to once the field is under concrete?
Further along the road by the A40 junction to Caerfyrddin there is another development that has caused severe surface water problems. This nightmare for neighbouring householders came as the result of negligence and the lack of planning and monitoring as culverts and ditches were blocked and built on.
MAP has a file of correspondence recording twenty years of misery as this development which began in the 1990's is still ongoing and has not been adopted by the County Council.
As one resident noted : “It is true that a developer will claim to be able to sort out the problems on site but, as history has proven, in reality this is not the case and residents are left to their own devices to cope with the negative impact and consequences”
10. Sewerage System
There has been a lot of publicity recently about discharging raw sewerage into rivers. According to Welsh Water data this occurred at Pontfaen 77 times in 2021. This number of course does not include those incidences when raw sewerage seeped accidentally onto fields and gardens as seen in the photos.
• The Pump at Pontfaen which pumps the waste to the treatment plant in Cwmisfael is unable to cope with the extra capacity although it was upgraded a few years ago. That is not surprising when one considers the increase in dwellings and the increase in volume of surface water flowing off concreted fields post developments.
• 40 dwellings have been built in the village since c.2000 – an increase of 43%
• All these properties were built but no upgraded work carried out to improve the system.
• How is the system expected to cope with further developments in Porth-y-rhyd and Llanddarog?
It must be remembered that both villages are on the same system!
• We appreciate that the Planning Authority carefully assess each individual application. However, it is felt that there is a need to view the wider picture.
• There is a plan to devlop a site of 42 dwellings at Wernfraith - an alternative site allocated in the LDP 2006 – 2018. If this plan goes ahead there will be catastrophic impacts to the village in terms of the sewerage system and surface water.
• A small cluster of dwellings is now proposed for site SuV20/h1 and possibly for a site near Tŷ Cynheidre. It's imperative to count all proposed numbers of dwellings in order to fully appreciate the strain that will be on the present system – a system that is NOT coping at present.
Porth-y-rhyd Wernfraith 42
SuV20/h1 6 6? 10? 14?
Cynheidre 5 ?
Llanddarog SuV19/h1 16 (0.903 hectar)
SuV19/h2 15 ( 0.863 hectar)
The total (minimum) is 84 dwellings but could be far higher.
Imagine the strain on an already ineffective system.
And what about Windfall Sites? It's imopossible to even hazard a guess at this stage!
Do you recall Porth-y-rhyd under threat sixty years ago back in 1963 when the Swansea Water Corporation wanted to drown the village?
Is there not a danger that the village will be drowned in 2023?
MAP contacted Welsh Water and as anticipated it was confirmed that upgrading work was required in most Welsh rural areas. Unfortunately there is no funding to carry out the improvements in the near future.
What will the situation be in the meantime?
Weather patterns are changing and will become more extreme in the future. We and future generations will have to cope with the impact. It will be too late to change things once fields have disappeared under concrete.
The experts are in agreement that it is unwise to build on land adjacent to Flood Zones as these are of vital importance with drainage.
The message is crystal clear in the letter sent to all Planning Authorities in Wales by Julie James AS
(November 23rd 2021)
Given the immediate and serious challenges posed by the climate emergency, a ’business as usual’ approach ... is no longer a viable option. Taking meaningful action to address climate change will mean taking difficult and sometimes unpopular decisions. The planning system is at the forefront of responding to the climate emergency and ensuring the well-being of current and future generations.
The decisions local planning authorities make today will have a profound effect on how we adapt to climate change now and in the future. It is particularly important that we protect homes from flooding, when we know the devastating impact it can have on health and well-being.
MAP appreciates the willingness of the Applicant to change and adapt plans.
MAP appreciates the decisions and recommendations made by Forward Planning officers .
HOWEVER
• despite the fact that the upper field has now been excluded
despite the fact that an attempt has been made to avoid the designated flood zone area
• and although the number of dwellings now proposed is more in line with what would be expected in a village the residents' concerns regarding the surface water and sewerage system OUTWEIGH the above ammendments.
• There is a strong feeling of opposition in the village as this field has been REFUSED in the past based on sound planning arguments and following a robust and rational site selection process.
• It was agreed that MAP register an OBJECTION to the inclusion of candidate site SuV20/h1 and kindly request that a representative / representatives be present at a Hearing Session during the Public Examination when this proposed site is discussed.
3. WERNFRAITH
In the Additional Comments section it is stated: This site is one of few opportunities in Porth-y-rhyd for new development, particularly with the de-allocation of the existing LDP allocation.
It was so ironic to read this knowing full well that an application will shortly be submitted by the developers POBOL Group and Jones Henllan to build 42 dwellings on this site at Wernfraith Farm.
MAP has scrutinized the developers' plans for this site.
The impact will be horrendous!
In the meantime the residents participated in the Pre Application Consultation (PAC).
165 letters of OBJECTION were handed in to Evans Banks in addition to several emails sent.
It is the intention of the residents to OPPOSE this proposed development once a planning application is submitted.
Yn anghytuno, mae dyraniad y safle o fewn y CDLl at ddibenion preswyl wedi cael ei ystyried yn llawn drwy'r fethodoleg asesu safle. Fel rhan o'r broses asesu hon paratowyd pro fforma safle manwl.
Disagree, the allocation of the site within the LDP for residential purposes has been subject to full consideration through the site assessment methodology. As part of this assessment process a detailed site pro forma has been prepared.
Gwrthwynebu
Ail Gynllun Datblygu Lleol Adneuo Diwygiedig Sir Gaerfyrddin
ID sylw: 5294
Derbyniwyd: 13/04/2023
Ymatebydd: Ann Gruffydd Rhys
Cydymffurfio â’r gyfraith? Heb nodi
Cadarn? Heb nodi
SuV20/h1
Gofrestru fy ngwrthwynebiad llwyr i gynnwys y safle a enwir SuV20/h1
Objects to the allocation of SuV20/h1
Di-ddyrannu'r safle o'r Cynllun
De-allocated the site from the Plan
Annwyl gyfaill,
Ysgrifennaf atoch i gofrestru fy ngwrthwynebiad llwyr i gynnwys y safle a enwir SuV20/h1 (sef y tir sydd ar y ffin â fferm Llwyn Henri, Porth-y-rhyd) yn y CDLl 2018-2033, safle a wrthodwyd eisoes gan yr Adran Blaen-gynllunio nôl yn 2014 "yn dilyn asesiadau trylwyr".
Yr eiddoch yn gywir,
Ann Gruffydd Rhys
Yn anghytuno, mae dyraniad y safle o fewn y CDLl at ddibenion preswyl wedi cael ei ystyried yn llawn drwy'r fethodoleg asesu safle. Fel rhan o'r broses asesu hon paratowyd pro fforma safle manwl.
Disagree, the allocation of the site within the LDP for residential purposes has been subject to full consideration through the site assessment methodology. As part of this assessment process a detailed site pro forma has been prepared.
Gwrthwynebu
Ail Gynllun Datblygu Lleol Adneuo Diwygiedig Sir Gaerfyrddin
ID sylw: 5307
Derbyniwyd: 14/04/2023
Ymatebydd: Mr Rhodri Lewis
Cydymffurfio â’r gyfraith? Heb nodi
Cadarn? Heb nodi
I wish to register my opposition to the inclusion of SuV20/h1 on the revised LDP 2018 - 2033 and the change of boundary to include the field near Ty Cynheidre. I’m worried that the inclusion of both of these will eventually result in further development within the village and will have a detrimental impact on the valley floor and will further impact the current sewerage and surface water problems. Problems that we have experienced directly over the past 10 years.
Remove site from Plan
Dear Planning Manager
I wish to register my opposition to the inclusion of SuV20/h1 on the revised LDP 2018 - 2033 and the change of boundary to include the field near Ty Cynheidre. I’m worried that the inclusion of both of these will eventually result in further development within the village and will have a detrimental impact on the valley floor and will further impact the current sewerage and surface water problems. Problems that we have experienced directly over the past 10 years.
The expected planning at Wernfraith Farm is also of great concern to us as our property is currently effected by the surface water on this field and the inclusion on any development will surely add to this problem unless the current drainage system is fully re-planned and re-routed and not just ‘updated’. These concerns have been highlighted to our councillor Ann Davies and to Ben Kathrens B.Sc (Hons) MCIWEM MInstLM - Flood Defence and Coastal Protection Manager in the past when the flood water has reached a level that has flooded around/inside our property. Details of which should be on your flooding database.
Yn anghytuno, mae dyraniad y safle o fewn y CDLl at ddibenion preswyl wedi cael ei ystyried yn llawn drwy'r fethodoleg asesu safle. Fel rhan o'r broses asesu hon paratowyd pro fforma safle manwl.
Disagree, the allocation of the site within the LDP for residential purposes has been subject to full consideration through the site assessment methodology. As part of this assessment process a detailed site pro forma has been prepared.
Gwrthwynebu
Ail Gynllun Datblygu Lleol Adneuo Diwygiedig Sir Gaerfyrddin
ID sylw: 5310
Derbyniwyd: 14/04/2023
Ymatebydd: Mr Gerwyn Rhys
Cydymffurfio â’r gyfraith? Heb nodi
Cadarn? Heb nodi
Ysgrifennaf i gofrestru fy ngwrthwynebiad llwyr i gynnwys Safle SuV20/h1 yn y CDLl. Roedd gwrthwynebiad chwyrn i’r safle hwn gan bobl y pentref nôl yn 2014. Bryd hynny cafodd y safle ei wrthod yn unfrydol gan Ymgynghorydd Cynllunio Annibynnol ac Arolygydd Cynllunio Annibynnol. Cafodd y safle hefyd ei wrthod gan Adain Blaen-gynllunio’r Cyngor ar ôl gwneud ‘asesiadau trylwyr’. Roedd y pryderon ynghylch y safle ar y pryd yn cynnwys y ffaith bod rhan o’r safle ar barth llifogydd a bod yna eisoes broblemau’n ymwneud â llif dŵr glaw ar y safle a chapasiti’r system garthffosiaeth. Nid yw’r problemau hyn wedi diflannu nac wedi newid. Po fwyaf o ddatblygu fydd yn digwydd yn y pentref, y mwyaf o straen fydd ar y seilwaith carthffosiaeth a dŵr glaw, sydd eisoes yn methu ymdopi. Yn 2021 cafodd carthion heb eu trin eu rhyddhau i afon Gwendraeth Fach 77 o weithiau, gan Dŵr Cymru, o’r bibell ym Mhontfaen – dim ond un enghraifft yw hyn. Mae’r safle ger Llwyn Henri yn aml yn ddirlawn ar ôl glaw trwm ac yn aml gwelir llynnoedd o ddŵr yn sefyll arno, ac mae dŵr hefyd yn llifo i lawr y ffordd fach sy’n mynd heibio i fynedfa Llwyn Henri (hen heol Gelli-ddu Fach) – byddai unrhyw ddatblygu ar y safle hwn yn golygu colli amsugfa ddŵr naturiol a gwerthfawr a byddai’n anochel yn arwain at waethygu problemau llifogydd a charthffosiaeth yn y pentref.
I object to the inclusion of the SuV20/h1 Site in the LDP. There was vehement opposition to this site from the people of the village back in 2014. At that time the site was unanimously rejected by an Independent Planning Consultant and an Independent Planning Inspector. The site was also rejected by the Council's Forward Planning Section after 'thorough assessments' were made. Concerns about the site at the time included the fact that part of the site was on a flood zone and that there were already issues with rainwater flow at the site and sewerage system capacity. These problems have not gone away or changed. The more development takes place in the village, the more strain there will be on the sewerage and rainwater infrastructure, which is already unable to cope. In 2021 untreated sewage was discharged into the River Gwendraeth Fach 77 times, by Welsh Water, from the pipeline at Pontfaen – this is just one example. The site near Llwyn Henri is often devastated after heavy rains and lakes of water are often seen standing on it, and water also flows down the minor road passing the entrance to Llwyn Henri (the former Gelli-ddu Fach road) – any development on this site would mean the loss of a valuable natural water absorber and would inevitably lead to exacerbation of flooding and sewerage problems in the village.
Tynnu'r dyraniad a'r safle o'r terfynau datblygu
Remove the allocation and the site from the development limits.
Annwyl Syr/Fadam,
Parthed: Safle SuV20/h1 (tir ger fferm Llwyn Henri)
Ysgrifennaf i gofrestru fy ngwrthwynebiad llwyr i gynnwys Safle SuV20/h1 yng Nghynllun Datblygu Lleol Diwygiedig Sir Gaerfyrddin 2018 – 2033. Roedd gwrthwynebiad chwyrn i’r safle hwn gan bobl y pentref nôl yn 2014. Bryd hynny cafodd y safle ei wrthod yn unfrydol gan Ymgynghorydd Cynllunio Annibynnol ac Arolygydd Cynllunio Annibynnol. Cafodd y safle hefyd ei wrthod gan Adain Blaen-gynllunio’r Cyngor ar ôl gwneud ‘asesiadau trylwyr’. Roedd y pryderon ynghylch y safle ar y pryd yn cynnwys y ffaith bod rhan o’r safle ar barth llifogydd a bod yna eisoes broblemau’n ymwneud â llif dŵr glaw ar y safle a chapasiti’r system garthffosiaeth. Nid yw’r problemau hyn wedi diflannu nac wedi newid. Po fwyaf o ddatblygu fydd yn digwydd yn y pentref, y mwyaf o straen fydd ar y seilwaith carthffosiaeth a dŵr glaw, sydd eisoes yn methu ymdopi. Yn 2021 cafodd carthion heb eu trin eu rhyddhau i afon Gwendraeth Fach 77 o weithiau, gan Dŵr Cymru, o’r bibell ym Mhontfaen – dim ond un enghraifft yw hyn. Mae’r safle ger Llwyn Henri yn aml yn ddirlawn ar ôl glaw trwm ac yn aml gwelir llynnoedd o ddŵr yn sefyll arno, ac mae dŵr hefyd yn llifo i lawr y ffordd fach sy’n mynd heibio i fynedfa Llwyn Henri (hen heol Gelli-ddu Fach) – byddai unrhyw ddatblygu ar y safle hwn yn golygu colli amsugfa ddŵr naturiol a gwerthfawr a byddai’n anochel yn arwain at waethygu problemau llifogydd a charthffosiaeth yn y pentref.
Yn ychwanegol, mae’r map yn dangos newid yn ffin y pentref ar hyd ffordd y B4310. Yn ôl y map mae ffin ddeheuol y pentref wedi symud ymhellach i’r De – lle’r oedd yn gorffen gydag Awelfryn mae’r map newydd yn cynnwys darn o’r cae o flaen Tŷ Cynheidre. Beth yw’r rheswm am hyn a beth allai’r goblygiadau fod o ran y math o ddatblygu a allai gael ei ganiatáu yma?
Yn gywir
Yn anghytuno, mae dyraniad y safle o fewn y CDLl at ddibenion preswyl wedi cael ei ystyried yn llawn drwy'r fethodoleg asesu safle. Fel rhan o'r broses asesu hon paratowyd pro fforma safle manwl.
Disagree, the allocation of the site within the LDP for residential purposes has been subject to full consideration through the site assessment methodology. As part of this assessment process a detailed site pro forma has been prepared.
Gwrthwynebu
Ail Gynllun Datblygu Lleol Adneuo Diwygiedig Sir Gaerfyrddin
ID sylw: 5347
Derbyniwyd: 14/04/2023
Ymatebydd: Mrs Miriam Biddle
Cydymffurfio â’r gyfraith? Heb nodi
Cadarn? Heb nodi
Objection to the allocated site
Remove site from Plan
Re: Carmarthenshire Revised Local development Plan.
Please be advised I wish to register my opposition to the inclusion of SuV20/h1 (land adjacent to Llwyn Henri) to the revised LDP 2018-2033.
Yn anghytuno, mae dyraniad y safle o fewn y CDLl at ddibenion preswyl wedi cael ei ystyried yn llawn drwy'r fethodoleg asesu safle. Fel rhan o'r broses asesu hon paratowyd pro fforma safle manwl.
Disagree, the allocation of the site within the LDP for residential purposes has been subject to full consideration through the site assessment methodology. As part of this assessment process a detailed site pro forma has been prepared.
Gwrthwynebu
Ail Gynllun Datblygu Lleol Adneuo Diwygiedig Sir Gaerfyrddin
ID sylw: 5408
Derbyniwyd: 10/04/2023
Ymatebydd: Gwenda Griffiths
Cydymffurfio â’r gyfraith? Heb nodi
Cadarn? Heb nodi
I would like to register my opposition to the inclusion of SuV20/h1 (land adjacent to Llwyn Henri) Porthyrhyd
Remove from the Plan.
I would like to register my opposition to the inclusion of SuV20/h1 (land adjacent to Llwyn Henri) in revised LDP 2018-2033.
Yn anghytuno, mae dyraniad y safle o fewn y CDLl at ddibenion preswyl wedi cael ei ystyried yn llawn drwy'r fethodoleg asesu safle. Fel rhan o'r broses asesu hon paratowyd pro fforma safle manwl.
Disagree, the allocation of the site within the LDP for residential purposes has been subject to full consideration through the site assessment methodology. As part of this assessment process a detailed site pro forma has been prepared.
Gwrthwynebu
Ail Gynllun Datblygu Lleol Adneuo Diwygiedig Sir Gaerfyrddin
ID sylw: 5409
Derbyniwyd: 06/04/2023
Ymatebydd: Christopher Short
Cydymffurfio â’r gyfraith? Heb nodi
Cadarn? Heb nodi
I wish to register my opposition to the inclusion of SuV20/h1 (land adjacent to Llwyn Henri) in the revised LDP. Reasons for the opposition include adding to the already existing sewerage and surface water problems, and an increase in traffic levels.
Remove from the Plan.
I wish to register my opposition to the inclusion of SuV20/h1 (land adjacent to Lllwyn Henri)
in the revised LDP2018 - 2033.
Porthyrhyd is a small village on the valley floor, within flood zones and with already existing
sewerage and surface water problems. Any developments will further exacerbate this
situation. I do not believe the waterlsewerage system will cope with the extra housing.
The current level of trafiic through the village is already causing untold damage to the road
surface. which is dangerous in itself. Further development with more regular traffic and the
extra volume will make this situation even worse. The resulting cost of repairs to the roads
will cause a further strain on council finances and ultimately the local ratepayers.
Yn anghytuno, mae dyraniad y safle o fewn y CDLl at ddibenion preswyl wedi cael ei ystyried yn llawn drwy'r fethodoleg asesu safle. Fel rhan o'r broses asesu hon paratowyd pro fforma safle manwl.
Disagree, the allocation of the site within the LDP for residential purposes has been subject to full consideration through the site assessment methodology. As part of this assessment process a detailed site pro forma has been prepared.
Gwrthwynebu
Ail Gynllun Datblygu Lleol Adneuo Diwygiedig Sir Gaerfyrddin
ID sylw: 5410
Derbyniwyd: 06/04/2023
Ymatebydd: Marian Short
Cydymffurfio â’r gyfraith? Heb nodi
Cadarn? Heb nodi
I wish to register my opposition to the inclusion of SuV20/h1 (land adjacent to Llwyn Henri) in the revised LDP. Porthyrhyd is a small village on the valley floor, within flood zones and with already existing sewerage and surface water problems. Any developments will further exacerbate this situation. Concern is also had to an increase in traffic levels in the village.
Remove from the Plan.
I wish to register my opposition to the inclusion of SuV20/h1 (land adjacent to Lllwyn Henri)
in the revised LDP2018 - 2033.
Porthyrhyd is a small village on the valley floor, within flood zones and with already existing
sewerage and surface water problems. Any developments will further exacerbate this
situation. i do not believe the water/sewerage system will cope with the extra housing.
The current level of traffic through the village is already causing untold damage to the road
surface. which is dangerous in itsetf. Further development with more regular traffic and the
extra volume will make this situation even worse. The resulting cost of repairs to the roads
will cause a further strain on council finances and ultimately the local ratepayers.
Yn anghytuno, mae dyraniad y safle o fewn y CDLl at ddibenion preswyl wedi cael ei ystyried yn llawn drwy'r fethodoleg asesu safle. Fel rhan o'r broses asesu hon paratowyd pro fforma safle manwl.
Disagree, the allocation of the site within the LDP for residential purposes has been subject to full consideration through the site assessment methodology. As part of this assessment process a detailed site pro forma has been prepared.
Gwrthwynebu
Ail Gynllun Datblygu Lleol Adneuo Diwygiedig Sir Gaerfyrddin
ID sylw: 5411
Derbyniwyd: 11/04/2023
Ymatebydd: Amanda Jones
Cydymffurfio â’r gyfraith? Heb nodi
Cadarn? Heb nodi
I wish to register my opposition to the inclusion of SuV20/h1 in the revised LDP.
Remove from the Plan.
I wish to register my opposition to the inclusion of SuV20/h1 in the revised LDP 2018-2033.
Yn anghytuno, mae dyraniad y safle o fewn y CDLl at ddibenion preswyl wedi cael ei ystyried yn llawn drwy'r fethodoleg asesu safle. Fel rhan o'r broses asesu hon paratowyd pro fforma safle manwl.
Disagree, the allocation of the site within the LDP for residential purposes has been subject to full consideration through the site assessment methodology. As part of this assessment process a detailed site pro forma has been prepared.
Gwrthwynebu
Ail Gynllun Datblygu Lleol Adneuo Diwygiedig Sir Gaerfyrddin
ID sylw: 5416
Derbyniwyd: 14/04/2023
Ymatebydd: M M Jones
Cydymffurfio â’r gyfraith? Heb nodi
Cadarn? Heb nodi
Hoffwn gofrestru fy ngwrthwynebiad i gynnwys SuV20/h1 yn y CDLI.
I would like to register my objection to including SuV20/h1 in the LDP.
Tynnu oddi ar y cynllun.
Remove from the Plan.
Hoffwn gofrestru fy ngwrthwynebiad i gynnwys SuV20/h1 un y CDLI 2018-2033
I would like to register my objection to content.
Yn anghytuno, mae dyraniad y safle o fewn y CDLl at ddibenion preswyl wedi cael ei ystyried yn llawn drwy'r fethodoleg asesu safle. Fel rhan o'r broses asesu hon paratowyd pro fforma safle manwl.
Disagree, the allocation of the site within the LDP for residential purposes has been subject to full consideration through the site assessment methodology. As part of this assessment process a detailed site pro forma has been prepared.
Gwrthwynebu
Ail Gynllun Datblygu Lleol Adneuo Diwygiedig Sir Gaerfyrddin
ID sylw: 5429
Derbyniwyd: 14/04/2023
Ymatebydd: Mr Gerwyn Rhys
Cydymffurfio â’r gyfraith? Heb nodi
Cadarn? Heb nodi
Ysgrifennaf i gofrestru fy ngwrthwynebiad llwyr i gynnwys Safle SuV20/h1 yng CDLl. Roedd gwrthwynebiad chwyrn i’r safle hwn gan bobl y pentref nôl yn 2014. Bryd hynny cafodd y safle ei wrthod yn unfrydol gan Ymgynghorydd Cynllunio Annibynnol ac Arolygydd Cynllunio Annibynnol. Cafodd y safle hefyd ei wrthod gan Adain Blaen-gynllunio’r Cyngor ar ôl gwneud ‘asesiadau trylwyr’. Roedd y pryderon ynghylch y safle ar y pryd yn cynnwys y ffaith bod rhan o’r safle ar barth llifogydd a bod yna eisoes broblemau’n ymwneud â llif dŵr glaw ar y safle a chapasiti’r system garthffosiaeth. Nid yw’r problemau hyn wedi diflannu nac wedi newid. Po fwyaf o ddatblygu fydd yn digwydd yn y pentref, y mwyaf o straen fydd ar y seilwaith carthffosiaeth a dŵr glaw, sydd eisoes yn methu ymdopi. Yn 2021 cafodd carthion heb eu trin eu rhyddhau i afon Gwendraeth Fach 77 o weithiau, gan Dŵr Cymru, o’r bibell ym Mhontfaen – dim ond un enghraifft yw hyn. Mae’r safle ger Llwyn Henri yn aml yn ddirlawn ar ôl glaw trwm ac yn aml gwelir llynnoedd o ddŵr yn sefyll arno, ac mae dŵr hefyd yn llifo i lawr y ffordd fach sy’n mynd heibio i fynedfa Llwyn Henri (hen heol Gelli-ddu Fach) – byddai unrhyw ddatblygu ar y safle hwn yn golygu colli amsugfa ddŵr naturiol a gwerthfawr a byddai’n anochel yn arwain at waethygu problemau llifogydd a charthffosiaeth yn y pentref.
I write to register my absolute opposition to the inclusion of the SuV20/h1 Site in the LDP. There was vehement opposition to this site from the people of the village back in 2014. At that time the site was unanimously rejected by an Independent Planning Consultant, an Independent Planning Inspector and the Forward Planning Section after 'thorough assessments' were made. Concerns about the site at the time included the fact that part of the site was on a flood zone and that there were already issues with rainwater flow at the site and sewerage system capacity. These problems have not gone away or changed. The more development takes place in the village, the more strain there will be on the sewerage and rainwater infrastructure, which is already unable to cope. In 2021 untreated sewage was discharged into the River Gwendraeth Fach 77 times, by Welsh Water, from the pipeline at Pontfaen – this is just one example. The site near Llwyn Henri is often devastated after heavy rains and lakes of water are often seen standing on it, and water also flows down the minor road passing the entrance to Llwyn Henri (the former Gelli-ddu Fach road) – any development on this site would mean the loss of a valuable natural water absorber and would inevitably lead to exacerbation of flooding and sewerage problems in the village.
Tynnu oddi ar y cynllun.
Remove from the Plan.
Annwyl Syr/Fadam,
Parthed: Safle SuV20/h1 (tir ger fferm Llwyn Henri)
Ysgrifennaf i gofrestru fy ngwrthwynebiad llwyr i gynnwys Safle SuV20/h1 yng Nghynllun Datblygu Lleol Diwygiedig Sir Gaerfyrddin 2018 – 2033. Roedd gwrthwynebiad chwyrn i’r safle hwn gan bobl y pentref nôl yn 2014. Bryd hynny cafodd y safle ei wrthod yn unfrydol gan Ymgynghorydd Cynllunio Annibynnol ac Arolygydd Cynllunio Annibynnol. Cafodd y safle hefyd ei wrthod gan Adain Blaen-gynllunio’r Cyngor ar ôl gwneud ‘asesiadau trylwyr’. Roedd y pryderon ynghylch y safle ar y pryd yn cynnwys y ffaith bod rhan o’r safle ar barth llifogydd a bod yna eisoes broblemau’n ymwneud â llif dŵr glaw ar y safle a chapasiti’r system garthffosiaeth. Nid yw’r problemau hyn wedi diflannu nac wedi newid. Po fwyaf o ddatblygu fydd yn digwydd yn y pentref, y mwyaf o straen fydd ar y seilwaith carthffosiaeth a dŵr glaw, sydd eisoes yn methu ymdopi. Yn 2021 cafodd carthion heb eu trin eu rhyddhau i afon Gwendraeth Fach 77 o weithiau, gan Dŵr Cymru, o’r bibell ym Mhontfaen – dim ond un enghraifft yw hyn. Mae’r safle ger Llwyn Henri yn aml yn ddirlawn ar ôl glaw trwm ac yn aml gwelir llynnoedd o ddŵr yn sefyll arno, ac mae dŵr hefyd yn llifo i lawr y ffordd fach sy’n mynd heibio i fynedfa Llwyn Henri (hen heol Gelli-ddu Fach) – byddai unrhyw ddatblygu ar y safle hwn yn golygu colli amsugfa ddŵr naturiol a gwerthfawr a byddai’n anochel yn arwain at waethygu problemau llifogydd a charthffosiaeth yn y pentref.
Yn ychwanegol, mae’r map yn dangos newid yn ffin y pentref ar hyd ffordd y B4310. Yn ôl y map mae ffin ddeheuol y pentref wedi symud ymhellach i’r De – lle’r oedd yn gorffen gydag Awelfryn mae’r map newydd yn cynnwys darn o’r cae o flaen Tŷ Cynheidre. Beth yw’r rheswm am hyn a beth allai’r goblygiadau fod o ran y math o ddatblygu a allai gael ei ganiatáu yma?
Yn gywir
Yn anghytuno, mae dyraniad y safle o fewn y CDLl at ddibenion preswyl wedi cael ei ystyried yn llawn drwy'r fethodoleg asesu safle. Fel rhan o'r broses asesu hon paratowyd pro fforma safle manwl.
Disagree, the allocation of the site within the LDP for residential purposes has been subject to full consideration through the site assessment methodology. As part of this assessment process a detailed site pro forma has been prepared.
Gwrthwynebu
Ail Gynllun Datblygu Lleol Adneuo Diwygiedig Sir Gaerfyrddin
ID sylw: 5474
Derbyniwyd: 13/04/2023
Ymatebydd: Mair Evans
Cydymffurfio â’r gyfraith? Heb nodi
Cadarn? Heb nodi
Gwrthwynebiad i SuV20/h1
Rwy'n gwrthwynebu am y rhesymau canlynol:
Nid oes manylion ar gael i‘r cyhoedd ar yr adeg hon yn y broses parthed y math o ddatblygiad nac ychwaith nifer y tai. Mae'r 5+ braidd yn amwys a gwyddom o'r gorau sut
all y niferoedd chwyddo. (e.e. Lovells 32 - 52 a safle arfaethedig Wernfraith 27 - 42 ).
Gwrthodwyd y safle hwn yn y gorffennol yn dilyn misoedd lawer o gynnal profion ac asesiadau gwahanol, o ymgynghori gyda‘r asiantaethau perthnasol ac o goladu ffeiliau o dystiolaeth o amrywiol ffynonellau.
Gwrthod oedd barn yr Ymgynghorydd Cynllunjo annibynnol ar y pryd. Gwrthod oedd argymhelliad yr Adran Blaen-gynllunio. Gwrthod oedd dyfarniad yr Arolygydd Annibynnol yn dilyn Gwrandawiad Cyhoeddus a dyna oedd‘penderfyniad y Cyngor Sir yn seiliedig ar broses cadarn a rhesymegol.
Rwy‘n llwyr barchu hawl yr Ymgeisydd i ail gyflwyno'r safle ond er i'r cae gael ei docio y tro hwn mac rhannau ohono yn dal o fewn Parthau Llifogydd C2 a B ac njd yw newid
lleoliad mynedfa yn cael gwared o’r holl rwystrau ac ardrawiadau dwys eraill.
Mae prif bibell ddwr yn agos i‘r cae. Hyd yma ni dderbyniais ateb i gwestiwn syml:
Faint o le sydd angen ei gadw‘n glir o boptu'r bibell fel clustogfa neu Goridor Diogelwch rhag datblygiad?
Mae llawer o broblemau dwys dwr glaw a'r system garthffosiaeth. Teimlaf yn aml bod y drol
yn cael ei roi o flaen y ceffyl. Oni ddylid uwchraddio'r isadeiledd cyn caniatau datblygiadau.
Fel arall gall yr ardrawiad fod yn hunllefus fel y gwelwyd eisoes yn y pentref hwn.
Objecting to SuV20/h1
I am objecting for the following reasons:
- there are no details available to the public at this point un the process of the type of development nor the number of houses. The 5+ is a bit vague and we know from the best how the numbers can increase (eg Lovells – 32 – 52 and the Deposit site Wernffraith 27-42).
- the site was rejected in the past following months of tests and different assessments, from consultation with the relevant agents and and of collating files of evidence from various sources. The Independent Planning consultant’s opinion was to reject at the time. The Forward Planning Section was to reject. The independent Planning Inspector’s decision to reject following the Public Examination, and that was the County Council’s decision based on a firm and reasonable process.
- I fully respect the right of the applicant to re-submit the site but although the field was cropped this time parts of it are still within Flood Zones C2 and B and changing the location of an entrance does not remove all other strong obstructions and setbacks.
- The main water pipe is close to the field. Up until now, I haven’t received an answer to my simple question: How much room is required to keep clear of the pipe as a buffer or safety corridor from development?
There are many problems of surface water and sewerage system. I often feel that the cart is being put before the horse. Shouldn't the infrastructure be upgraded before development is permitted. Otherwise, the impact can be disastrous as has already been seen in this village.
Tynnu dyraniad tai SuV20/h1 o'r Cynllun.
Remove housing allocation SuV20/h1 from the Plan.
Annwyl Reolwr,
Mae 2 argymhelliad ar gyfer pentref Porth—y-rhyd ac ymatebaf yn gryno iddynt isod.
1. Newid y ffin i gynnwys y tir ger Ty Cynheidre ar gyfer ei ddatblygu.
Yn anfiodus, nid oes manylion ar gael ar yr adeg hon yn y broses parthed y math o ddatblygiad, ei faint, nifer tai, math o dai ayyb.
O ganlyniad nid oes dewis gennyf ond GWRTHWYNEBU. Gofynnaf yn garedig am gael cyfle i ymateb eto unwaith y bydd manylion ar gael i'r cyhoedd am y cynlluniau ar gyfer y
tir hwn.
2. SuV20/h1 — tir ger Fferm Llwyn Henri
Rwy'n gwrthwynebu am y rhesymau canlynol:
Nid oes manylion ar gael i‘r cyhoedd ar yr adeg hon yn y broses parthed y math o ddatblygiad nac ychwaith nifer y tai. Mae'r 5+ braidd yn amwys a gwyddom o'r gorau sut
all y niferoedd chwyddo. (e.e. Lovells 32 - 52 a safle arfaethedig Wernfraith 27 - 42 ).
Gwrthodwyd y safle hwn yn y gorffennol yn dilyn misoedd lawer o gynnal profion ac asesiadau gwahanol, o ymgynghori gyda‘r asiantaethau perthnasol ac o goladu ffeiliau o dystiolaeth o amrywiol ffynonellau.
Gwrthod oedd barn yr Ymgynghorydd Cynllunjo annibynnol ar y pryd. Gwrthod oedd argymhelliad yr Adran Blaen-gynllunio. Gwrthod oedd dyfarniad yr Arolygydd Annibynnol yn dilyn Gwrandawiad Cyhoeddus a dyna oedd‘penderfyniad y Cyngor Sir yn seiliedig ar broses cadarn a rhesymegol.
Rwy‘n llwyr barchu hawl yr Ymgeisydd i ail gyflwyno'r safle ond er i'r cae gael ei docio y tro hwn mac rhannau ohono yn dal o fewn Parthau Llifogydd C2 a B ac njd yw newid
lleoliad mynedfa yn cael gwared o’r holl rwystrau ac ardrawiadau dwys eraill.
Mae prif bibell ddwr yn agos i‘r cae. Hyd yma ni dderbyniais ateb i gwestiwn syml:
Faint o le sydd angen ei gadw‘n glir o boptu'r bibell fel clustogfa neu Goridor Diogelwch rhag datblygiad?
Mae llawer o broblemau dwys dwr glaw a'r system garthffosiaeth. Teimlaf yn aml bod y drol
yn cael ei roi o flaen y ceffyl. Oni ddylid uwchraddio'r isadeiledd cyn caniatau datblygiadau.
Fel arall gall yr ardrawiad fod yn hunllefus fel y gwelwyd eisoes yn y pentref hwn.
Cofrestraf fy ngwrthwynebiad i ddyrannu'r cae hwn yn y Cynllun Datblygu Lleol Diwygiedig 2018-2033 a dymunaf siarad yn Gymraeg mewn sesiwn gwrandawiad yr
Archwiliad Cyhoeddus.
3. SAFLE WERNFRAITH
Rhyddhad yn wir oedd gweld bod y safle hwn wedi cael ei ddad-ddyrannu ac na fydd yn cael ei gynnwys yn y fersiwn diwygiedig o'r CDLI 2018 - 2033.
Yn anffodus, mae risg y caiff ei goncritio gyda datblygiad o 42 o anheddau ymhell cyn i'r CCDLI hwn ddod i rym ac y bydd yn cael ei gategoreiddio fel un o'r Hap-safleoedd.
Rhyfedd o fyd!
Yn gywir,
Mair Evans
Dear Manager,
There are 2 recommendations for the village of Porth-y-rhyd to which I will respond briefly below.
1. Change the boundary to include the land adjacent to Tŷ Cynheidre for development.
Unfortunately, no details are available at this point in the process regarding the type of development, its size, number of houses, type of houses etc.
As a result, I have no option but to OBJECT. I kindly ask for an opportunity to respond again once details are made available to the public concerning the plans for this land.
2. SuV20/h1 — land adjacent to Llwynhenry Farm
I object for the following reasons:
There are no details available to the public at this point in the process regarding the type of development nor the number of houses. 5+ is rather vague and we know full well how the numbers can increase (e.g. Lovells 32 - 52 and the proposed Wernfraith site 27 - 42 ).
This site has been rejected in the past following many months of conducting different tests and assessments, consulting the relevant agencies and collating files of evidence from various sources.
The opinion of the independent Planning Consultant at the time was to Object. The recommendation of the Forward Planning Department was to Object. The Independent Inspector's ruling following a Public Hearing was to Object, and that was the County Council's decision based on a sound and rational process.
I fully respect the Applicant's right to resubmit the site but although the field was made smaller this time parts of it are still within Flood Zones C2 and B and changing the location of an entrance does not remove all the other serious obstructions and impacts.
There is a water main close to the field. Thus far I have not received an answer to a simple question:
How much space needs to be kept clear around the pipe as a buffer zone or Safety Corridor from development?
There are many serious problems in terms of rainwater and the sewerage system. I often feel that the cart is being put before the horse. Should not the infrastructure be upgraded before development is allowed.
Otherwise, the impact can be terrible as already seen in this village.
I register my opposition to the allocation of this field in the Revised Local Development Plan 2018-2033 and wish to speak in Welsh at a Public Examination hearing session.
3. WERNFRAITH SITE
What a relief to see that this site has been de-allocated and that it will not be included in the revised version of the LDP 2018 - 2033.
Unfortunately, there is a risk that it will be concreted over with a development of 42 dwellings long before this LDP comes into force and that it will be categorised as one of the windfall sites.
Strange indeed!
Regards,
Mair Evans
Yn anghytuno, mae dyraniad y safle o fewn y CDLl at ddibenion preswyl wedi cael ei ystyried yn llawn drwy'r fethodoleg asesu safle. Fel rhan o'r broses asesu hon paratowyd pro fforma safle manwl.
Disagree, the allocation of the site within the LDP for residential purposes has been subject to full consideration through the site assessment methodology. As part of this assessment process a detailed site pro forma has been prepared.
Gwrthwynebu
Ail Gynllun Datblygu Lleol Adneuo Diwygiedig Sir Gaerfyrddin
ID sylw: 5477
Derbyniwyd: 07/04/2023
Ymatebydd: Glanville & Anne Evans
Nifer y bobl: 2
Cydymffurfio â’r gyfraith? Heb nodi
Cadarn? Heb nodi
Wewish to register our opposition to the inclusion of SuV20/h1 in the revised LDP.. The main reason for our opposition to this inclusion is that we are concerned by the detrimental impact that any developments will have on our village of Porthyrhyd, which already has existing sewage and surface water problems.
Remove the site from the Plan.
We, Glanville and Anne Evans, of the above address wish to register our opposition to the inclusion of SuV20/h1 in the revised LDP 2018-2033.
The main reason for our opposition to this inclusion is that we are concerned by the detrimental impact that any developments will have on our village of Porthyrhyd, which already has existing sewage and surface water problems.
Yn anghytuno, mae dyraniad y safle o fewn y CDLl at ddibenion preswyl wedi cael ei ystyried yn llawn drwy'r fethodoleg asesu safle. Fel rhan o'r broses asesu hon paratowyd pro fforma safle manwl.
Disagree, the allocation of the site within the LDP for residential purposes has been subject to full consideration through the site assessment methodology. As part of this assessment process a detailed site pro forma has been prepared.
Gwrthwynebu
Ail Gynllun Datblygu Lleol Adneuo Diwygiedig Sir Gaerfyrddin
ID sylw: 5478
Derbyniwyd: 13/04/2023
Ymatebydd: Glan Davies
Cydymffurfio â’r gyfraith? Heb nodi
Cadarn? Heb nodi
Rwyf am ddatgan fy ngwrthwynebiad i gynnwys Safle SuV20/h1 — y cae ger Llwyn Henri. Fel ffermwr dydw i ddim am weld colli cae amaethyddol arall. Mae'n bwysig cadw caeau ar gyfer y dyfodol. Mae hefyd yn braf medru edrych allan drwy‘r ffenest ar gaeau gwyrdd. Mae'n dda i'r iechyd.
Mae'r cae yma hefyd yn bwysig ar gyfer draenio'r dwr glaw sy'n llifo o'r tir uwch y tu ol iddo. Os bydd hwn yn diflannu bydd mwy mwy eto o broblemau i'r bobl sy'n byw yma.
I want to express my objection to the inclusion of Site SuV20/h1 - the field near Llwyn Henri, Porth-y-rhyd. As a farmer I don't want to see another agricultural field being lost. It is important to keep fields for the future. It's also nice to be able to look out of the window at green fields. It's good for someone's health.
This field is also important for draining the rainwater that flows from the higher ground behind it. If this disappears there will be even more problems for the people who live here.
Tynnu'r safle o'r Cynllun
Remove the site from the Plan
Annwyl Syr / Fadam,
Rwyf am ddatgan fy ngwrthwynebiad i gynnwys Safle
SuV20/h1 — y cae ger Llwyn Henri, Porth-y-rhyd - yn safle i'w ddatblygu yn y Cynllun Datblygu Lleol Diwygiedig Adneuo.
Rydw i wedi ffermio ar hyd fy oes gan ymddeol i un o'r byngalos ar yr Hen Heel. Fel ffermwr dydw i ddim am weld colli cae amaethyddol arall. Mae'n bwysig cadw
caeau ar gyfer y dyfodol. Mae hefyd yn braf medru edrych allan drwy‘r ffenest ar gaeau gwyrdd. Mae'n dda i'r iechyd.
Mae'r cae yma hefyd yn bwysig ar gyfer draenio'r dwr glaw sy'n llifo o'r tir uwch y tu ol iddo. Os bydd hwn yn diflannu bydd mwy mwy eto o broblemau i'r bobl sy'n byw yma.
Dear Sir/Madam,
I want to express my objection to the inclusion of Site SuV20/h1 - the field near Llwyn Henri, Porth-y-rhyd - as a site to be developed in the Deposit Revised Local Development Plan.
I have farmed all my life and retired to one of the bungalows on the Old Road. As a farmer I don't want to see another agricultural field being lost. It is important to keep fields for the future. It's also nice to be able to look out of the window at green fields. It's good for someone's health.
This field is also important for draining the rainwater that flows from the higher ground behind it. If this disappears there will be even more problems for the people who live here.
Yn anghytuno, mae dyraniad y safle o fewn y CDLl at ddibenion preswyl wedi cael ei ystyried yn llawn drwy'r fethodoleg asesu safle. Fel rhan o'r broses asesu hon paratowyd pro fforma safle manwl.
Disagree, the allocation of the site within the LDP for residential purposes has been subject to full consideration through the site assessment methodology. As part of this assessment process a detailed site pro forma has been prepared.