Gwrthwynebu
Ail Gynllun Datblygu Lleol Adneuo Diwygiedig Sir Gaerfyrddin
ID sylw: 4812
Derbyniwyd: 07/04/2023
Respondent ID: 5582
Ymatebydd: M Raddenbury
Cydymffurfio â’r gyfraith? Heb nodi
Cadarn? Heb nodi
Objection to site SuV20/h1. Issues include floods / blockages. Toilet water level in my house rises and raw sewerage comes to the maximum level in the garden out of the manholes.
The pumping station cant cope. Originally Welsh water said a pipe had collapsed from the pumping station to the treatment works they repaired the pipe but we are still getting raw sewerage in the garden and its its still coming back in to the house .
There is no way another development will help with the problems we are already dealing with !
This is raw sewerage and it isnt going away .
Yn anghytuno, mae dyraniad y safle o fewn y CDLl at ddibenion preswyl wedi cael ei ystyried yn llawn drwy'r fethodoleg asesu safle. Fel rhan o'r broses asesu hon paratowyd pro fforma safle manwl.
Disagree, the allocation of the site within the LDP for residential purposes has been subject to full consideration through the site assessment methodology. As part of this assessment process a detailed site pro forma has been prepared.