Gwrthwynebu

Ail Gynllun Datblygu Lleol Adneuo Diwygiedig Sir Gaerfyrddin

ID sylw: 4797

Derbyniwyd: 05/04/2023

Ymatebydd: Mr Andy Haywood

Cydymffurfio â’r gyfraith? Heb nodi

Cadarn? Heb nodi

Crynodeb o'r Gynrychiolaeth:

I wish to register my opposition to the inclusion of the above proposed development in the revised LDP 2018-2033, as it would contribute to further potential problems with the ground/surface water and sewerage systems which are already under great demand.
The village of Porthyrhyd has already had significant extra demand put on these services over the years and is in a low lying area where the sustainability of these systems is very finely balanced.

Newid wedi’i awgrymu gan ymatebydd:

Remove the allocation.

Testun llawn:

I wish to register my opposition to the inclusion of the above proposed development in the revised LDP 2018-2033, as it would contribute to further potential problems with the ground/surface water and sewerage systems which are already under great demand.
The village of Porthyrhyd has already had significant extra demand put on these services over the years and is in a low lying area where the sustainability of these systems is very finely balanced.

Yours faithfully
A. Haywood.


Ein hymateb:

Yn anghytuno, mae dyraniad y safle o fewn y CDLl at ddibenion preswyl wedi cael ei ystyried yn llawn drwy'r fethodoleg asesu safle. Fel rhan o'r broses asesu hon paratowyd pro fforma safle manwl.

Disagree, the allocation of the site within the LDP for residential purposes has been subject to full consideration through the site assessment methodology. As part of this assessment process a detailed site pro forma has been prepared.