Gwrthwynebu

Ail Gynllun Datblygu Lleol Adneuo Diwygiedig Sir Gaerfyrddin

ID sylw: 5443

Derbyniwyd: 13/04/2023

Respondent ID: 5621

Ymatebydd: Mr Colum Carty

Asiant : Lightwater TPC (Adrian Thompson)

Cydymffurfio â’r gyfraith? Heb nodi

Cadarn? Nac Ydi

Crynodeb o'r Gynrychiolaeth:

Objection to Policy SD1, in regard to the new development limits boundary at the Former Emlyn Brickworks site in Penygroes:
The extent of the site allocation as shown on the Deposit Plan Proposals map should be amended to include all of the coloured areas as shown on the Initial Masterplan drawing (PED - PrC3-MU1 - 2023-04-13 [2] - Parc Emlyn Initial Masterplan) accompanying the statement by Lightwater TPC and or the settlement boundary line should remain as shown on the current Local Plan policies map.
Site ref. AS2/132/006


Ein hymateb:

The assessment of the site has been undertaken in accordance with national guidance and the Site Assessment Methodology and background/topic papers and the supporting evidence. Part of the site has been allocated for mixed use development under reference PrC3/MU1 and the development limits have been amended accordingly. The remaining part of the former LDP allocation has been removed as there are concerns that the site in its entirety cannot be delivered within the lifetime of the Revised LDP. This can be discussed further at Examination.