Crynodeb o'r Gynrychiolaeth:

The housing requirement of 8822 homes is a reduction of around 6,375 homes compared to the current adopted plan (15,197 homes). The housing requirement is 4,450 homes above the 2018 principal projection. The Council has concluded that all three variants of the 2018 WG projections are not appropriate and would adversely impact upon the Councils strategic ambitions from both an economic and social perspective with the principal projection being significantly lower (-42%) lower than historic build rates. However, it should be explicitly acknowledged by the Council that high levels of growth through in migration may not be consistent with policy SP8.
(Category B objection)

Atodiadau:


Ein hymateb:

Further evidential work has been prepared which considers the best available data including 2021 Census data. This builds upon the WLIA prepared in the support of the Deposit Plan and re-evaluates the outcomes of the WLIA in consideration of the most recent data. Further consideration can be given to the matter at Examination.