Gwrthwynebu

Ail Gynllun Datblygu Lleol Adneuo Diwygiedig Sir Gaerfyrddin

ID sylw: 5441

Derbyniwyd: 13/04/2023

Respondent ID: 5621

Ymatebydd: Mr Colum Carty

Asiant : Lightwater TPC (Adrian Thompson)

Cydymffurfio â’r gyfraith? Heb nodi

Cadarn? Nac Ydi

Crynodeb o'r Gynrychiolaeth:

Objection to Policy SG1, seeking a larger site area to be identified for the mixed use allocation at the Former Emlyn Brickworks site in Penygroes:
The extent of the site allocation as shown on the Deposit Plan Proposals map should be amended to include all of the coloured areas as shown on the Initial Masterplan drawing (PED - PrC3-MU1 - 2023-04-13 [2] - Parc Emlyn Initial Masterplan) accompanying the statement by Lightwater TPC and or the settlement boundary line should remain as shown on the current Local Plan policies map.


Ein hymateb:

Disagree. The sites has been duly considered in the formulation and preparation of the LDP with the reasons for the non-inclusion of the elements noted in this objection set out within the Site Assessment Table and site proforma. The assessment of the site was undertaken in accordance with national guidance and the site assessment methodology and background/topic papers and the supporting evidence.