Gwrthwynebu
Ail Gynllun Datblygu Lleol Adneuo Diwygiedig Sir Gaerfyrddin
ID sylw: 5405
Derbyniwyd: 12/04/2023
Ymatebydd: Mair Merchant
Cydymffurfio â’r gyfraith? Heb nodi
Cadarn? Nac Ydi
Objection to housing allocation PrC3/h28 for the following reasons:
1. Too much traffic already. People often have to walk on the road.
2. Sewer and drainage not adequate.
3. Unsuitable for heavy traffic as large lorries already use the road.
4. Concern over asbestos still on site.
5. Habitat already destroyed by contractor.
6. Already dangerous for young children.
Remove allocation.
1. Too much traffic already. People often have to walk on the road using a walker.
2. Sewer and drainage not adequate.
3. Unsuitable for heavy traffic as large lorries already use the road.
4. Concern over asbestos still on site.
5.[ILLEGIBLE] already destroyed by contractor
6. Already dangerous for young children, why this road.
Yn anghytuno, mae dyraniad y safle o fewn y CDLl at ddibenion preswyl wedi cael ei ystyried yn llawn drwy'r fethodoleg asesu safle. Fel rhan o'r broses asesu hon paratowyd pro fforma safle manwl.
Disagree, the allocation of the site within the LDP for residential purposes has been subject to full consideration through the site assessment methodology. As part of this assessment process a detailed site pro forma has been prepared.