Gwrthwynebu

Ail Gynllun Datblygu Lleol Adneuo Diwygiedig Sir Gaerfyrddin

ID sylw: 5283

Derbyniwyd: 14/04/2023

Respondent ID: 4980

Ymatebydd: Mr & Mrs I. & S. Howell & James

Nifer y bobl: 2

Asiant : JCR Planning Ltd

Cydymffurfio â’r gyfraith? Heb nodi

Cadarn? Nac Ydi

Crynodeb o'r Gynrychiolaeth:

This representation objects to the exclusion of this site from the development limits for Pembrey (SR/016/006). It should be emphasised that the accompanying illustrative scheme could readily be developed in phases and includes areas of landscaping and communal greenspace in order to enhance local biodiversity and to offer open areas to residents to support physical and mental well-being. Offering these positive community benefits is a key part of the scheme’s overall ethos.
The site layout encompasses a high proportion of affordable dwellings (both social and low cost home ownership).

Atodiadau:


Ein hymateb:

The sites have been duly considered in the formulation and preparation of the LDP with the reasons for their non-inclusion set out within the Site Assessment Table. The representations raise no additional points which justify inclusion of the suggested sites. The assessment of sites was undertaken in accordance with national guidance and the site assessment methodology and background/topic papers and the supporting evidence.