Gwrthwynebu

Ail Gynllun Datblygu Lleol Adneuo Diwygiedig Sir Gaerfyrddin

ID sylw: 5262

Derbyniwyd: 12/04/2023

Respondent ID: 4688

Ymatebydd: Mr C Hurley

Asiant : Evans Banks Planning Limited

Cydymffurfio â’r gyfraith? Heb nodi

Cadarn? Nac Ydi

Crynodeb o'r Gynrychiolaeth:

Objection to site at Cwm y nant (Prc2/h22)

Cwm-y-Nant (PrC2/h22) and Dafen East Gateway (h/23) were both sites allocated within the Carmarthenshire Unitary Development Plan (2006) and as mentioned above, within the Local Development Plan (2014) as sites GA2/h27 and h/30 & h/31. They have a combined total of 352 dwellings, although neither site has been the subject of any detailed planning application, let alone market interest.

The locality is riddled with historic coal mining activity, with low lying coal seams, together with multiple mine entries across all Dafen sites. Clearly, any residential development upon either site will have to overcome ground remediation to stabilise the ground for residential foundations. The abnormal costs of which are likely to be significant, and hence present the development costs as leading to unviable and undeliverable sites.


Ein hymateb:

Disagree, the allocation of the site within the LDP for residential purposes has been subject to full consideration through the site assessment methodology. As part of this assessment process a detailed site pro forma has been prepared.