Gwrthwynebu

Ail Gynllun Datblygu Lleol Adneuo Diwygiedig Sir Gaerfyrddin

ID sylw: 5075

Derbyniwyd: 11/04/2023

Ymatebydd: Omnicorp Ltd

Asiant : Evans Banks Planning Limited

Cydymffurfio â’r gyfraith? Heb nodi

Cadarn? Nac Ydi

Crynodeb o'r Gynrychiolaeth:

Objection to Policy HOM1 (AS2/021/001) in regard to the non allocation of a site in Carmarthen:
The Alternative Site forms a logical extension to an existing settlement, being well related to it and being positioned at a location within the wider landscape to not form a prominent or logical part of the surrounding open countryside. In addition, the site lies within close proximity and walking distance of the existing community services and local facilities of the adjoining settlement, which will ensure it makes a positive contribution to both national and local sustainable development objectives. From a wider sense, the Site will also benefit from well served excellent public transport links to the adjoining larger town of Carmarthen, together with other locations within and adjoining the County.

Newid wedi’i awgrymu gan ymatebydd:

Allocate the above site for housing within the RLDP.

Testun llawn:

1.0 INTRODUCTION
1.1 Evans Banks Planning Ltd. has been instructed by Omnicorp Ltd to prepare and
submit an Alternative Allocation Report for the allocation of land off Parc y Delyn,
Carmarthen for the purposes of residential development in the forthcoming
replacement Carmarthenshire Local Development Plan (LDP).
1.2 This statement has been prepared in line with the Authority’s published site
assessment and selection documents. The contents of this Statement therefore
address each point raised within these documents as well as ensuring that it
complies with regards to the guidance and requirements of Planning Policy Wales
(Edition 11) when it comes to the preparation of development plans and the allocation
of land for residential purposes as part of them.
1.3 The contents of this Statement therefore provide a comprehensive case for the
allocation of the land for residential development purposes, and it should also be
read in conjunction with the accompanying information and indicative drawing
package, as well as a sustainability assessment undertaken in-line with the
Authority’s requirements.
Alternative Allocation Report April 2023
Land off Parc y Dleyn, Carmarthen

2.0 SITE CONTEXT
2.1 THE SITE AND CURRENT CONTEXT
2.1.1 The Alternative Allocation relates to the parcel of land edged red on the plan and
image below.
Plan A
Photograph 1
Alternative Allocation Report April 2023
Land off Parc y Dleyn, Carmarthen
2.1.2 The majority of the Site is made up of a single field enclosure that is dominated by
semi-improved grassland (see photograph below) with large areas of scrub and
slopes downwards in a north to south direction:
Photograph 1
2.1.3 The boundaries of the Site are well defined by a mix of hedgerows, trees and stock
proof fencing. Further trees of varying states of health can be found throughout a
number of areas of the application site, as detailed in the accompanying Tree Survey
Report.
2.1.4 The remaining elements of the Site then relate to small strips of land (all in the control
of the Applicant or forming part of the public highway) along the eastern edge of
Penlan Road, which will be utilised as part of the proposed development to widen the
exiting carriageway and improve pedestrian linkages. Pedestrian access to the
application site is at present via Parc y Delyn through informal vegetation. The access
is identified by the red arrow on the aerial image below:
Alternative Allocation Report April 2023
Land off Parc y Dleyn, Carmarthen
Photograph 2
2.1.5 Although this is the existing access to the site, a new vehicular and pedestrian access
is proposed as part of this development along Penlan Road.
2.1.6 Under the provisions of the current Carmarthenshire LDP, the core of the Site is
currently allocated for residential development, as illustrated by Plan B below.
Plan B
Alternative Allocation Report April 2023
Land off Parc y Dleyn, Carmarthen
2.1.7 In response to the above allocation, a planning application for 20 units is currently
being finalised to be submitted to the LPA for its consideration and determination in
due course. However, as will be noted, the total area of the proposed Alternative
Allocation is greater than the above allocation to allow for highway improvements and
biodiversity mitigation and gain measures.
2.2 THE ADJOINING SETTLEMENT
2.2.1 In the immediate sense, the land to the north of the site currently forms part of a wider
enclosure that includes the application site. The land to the south and west is then
dominated by existing residential development, forming part of the greater urban area
of Carmarthen.
2.2.2 As detailed above, the Alternative Allocation forms part of the greater urban area of
Carmarthen with its associated community facilities and local services. The
application site is within walking distance from the town centre. The strong
sustainable position of the Alternative Allocation should therefore be given full
consideration when considering potential future growth options.
2.2.3 In terms of planned growth, the proposed Alternative Site forms part of one of the 3
identified Principal Centres within the 2nd Deposit LDP Within these areas, the
majority of the County’s growth (particularly with regards to housing) is expected to
be accommodated within the Plan period. However, having undertaken a
comprehensive review of the proposed allocations put forward by the 2nd Deposit LDP
for the Principal Centre in question, it has been identified that a number have
significant questions over their ability to be delivered within the Plan period, including
the following:
Alternative Allocation Report April 2023
Land off Parc y Dleyn, Carmarthen
Ref. No. Site Name Units
PrC1/h4 Land off Parc y Delyn 17
PrC1/MU1 West Carmarthen 700
PrC1/MU2 Pibwrlwyd 247
SeC1/h4 Cae Canfas, Heol Llanelli, Pontyates 8
SuV4/h1 Adjacent Fron Heulog, Cynwyl Elfed 6
SuV12/h1 Adj. Gwyn Villa, Llanpumpsaint 20
Table 1
2.2.4 As a result of the above, separate objections have been made in relation to the above
allocations and it is therefore important that alternative more deliverable sites should
be identified, to ensure the Plan can be regarded as being ‘sound’.
Alternative Allocation Report April 2023
Land off Parc y Dleyn, Carmarthen

3.0 THE PROPOSAL
3.0.1 As part of the requirements for the promotion of sites for residential development, this
Statement is accompanied by a layout for the residential scheme that will be part of
the soon to be submitted planning application. The scheme has been full yworked up
and takes account of all the Site’s assets and constraints, as well as current Authority
design guidance. As a result, it demonstrates that the Site is capable of delivering 20
units in a deliverable and sustainable manner. The following information therefore
expands on this principle.
3.1 DEVELOPMENT OVERVIEW
3.1.1 It is proposed that the Alternative Allocation be allocated in the forthcoming
replacement LDP for the purposes of 20 residential units. As detailed above, the
accompanying layout (reproduced below) demonstrates that the site is capable of
accommodating this number in a deliverable and sustainable manner.
Plan C
3.1.2 As illustrated above, the site is capable of accommodating a mix of unit sizes and
types, with the associated density – 20 units – having therefore taken into
consideration this potential mix, as well as striking a balance of being reflective of the
Alternative Allocation Report April 2023
Land off Parc y Dleyn, Carmarthen
existing form and density of residential development in the immediate locality. The
positioning of the proposed units has also taken into account the topography of the
site.
3.1.3 With regards then to access, the Alternative Site will be served by a new point of
access via its western boundary, via Penlan Road where a new estate road is
proposed. All new units will then be positioned around a principle new adoptable
estate road with each dwelling gaining access either directly off this or via short
private shared drives. Each unit will then be served by generous private rear gardens,
with smaller grass forecourts to their front. New rear boundaries serving each unit will
then be defined by fencing or hedgerows.
3.1.4 In addition to the above, off-site improvements to the existing adjoining public
highway (Penlan Road), as set out in the accompanying Transport Statement, would
also be delivered as part of the development of the Alternative Allocation. This will
include localised road widening and new footways to improve access and pedestrian
linkage to the application site.
3.1.5 Any development would also give full regard to current biodiversity levels on the site
and so land has been included within the Alternative Allocation to satisfy the
recommendations of the accompanying ecological survey reports.
3.1.6 It is recognised and supported that an element of the proposed units would be
affordable in nature, with the level of provision forming part of the review of the
current LDP.
3.2 INFRASTRUCTURE CONSIDERATIONS
3.2.1 Any development of the Alternative Allocation for residential units would be served by
mains water, public sewer and electricity, connections to which we understand lie
within or in close proximity to the Site.
Alternative Allocation Report April 2023
Land off Parc y Dleyn, Carmarthen
3.2.2 With regards then to surface water, it is considered that as a result of on-site
features, there would be a number of options available to any development of the site
in terms of its disposal, ensuring its development adheres to current regulatory
requirements.
Alternative Allocation Report April 2023
Land off Parc y Dleyn, Carmarthen

4.0 ENVIRONMENTAL CONSIDERATIONS
4.1 ECOLOGICAL ATTRIBUTES
4.1.1 As detailed above, a series of ecological surveys of the Site have been undertaken
and have heavily influenced the form of the proposed development. Therefore, any
biodiversity assets the Site may include have been given full consideration with
regards to exploring its potential for residential development. This has included the
proposed retention and management of existing site boundary features, the creation
of new boundary features and areas for enhancement.
4.1.2 The Alternative Site has been assessed against data held on the “Magic” website
which details statutory and non-statutory National and Local sites of ecological
importance. Plan D below provides an extract of those records applied to the
Carmarthen locality. The red star denotes the position of the Alternative Site.
Plan D
4.1.3 As can be seen from the above, the Alternative Site does not form part of and neither
is it near any national or local designations. The nearest designation is the River Tywi
SSSI/SAC, but due to the intervening distance and topography, the development of
the Alternative Site will not have any detrimental impact on this feature.
Alternative Allocation Report April 2023
Land off Parc y Dleyn, Carmarthen
4.2 HISTORICAL ASSETS
4.2.1 Below is an extract from the ‘Archwilio’ website that represents a resource for the
Historic Environment Records of Wales, with the Alternative Site indicated by a red
star.
Plan E
4.2.2 As can be seen, neither the Alternative Allocation nor immediately adjoining element
of the settlement includes any Scheduled Ancient Monuments, Listed Buildings or
Conservation Area’s. As a result, the development of the Site would not have any
detrimental impact on the setting or interest of any nearby historical asset.
4.3 ENVIRONMENTAL CONSTRAINTS
4.3.1 The Candidate Site is not categorised as being at risk of flooding in terms of the
Development Advice Maps or those produced by Natural Resources Wales, as
illustrated by the plans below (Alternative Site indicated by the red star).
Alternative Allocation Report April 2023
Land off Parc y Dleyn, Carmarthen
Plan F
(Development Advice Maps)
Plan G
(Flood Maps for Planning)
4.3.2 Due to its greenfield nature, the Candidate Site has no ground contamination related
constraints.
Alternative Allocation Report April 2023
Land off Parc y Dleyn, Carmarthen

5.0 VIABILITY
5.0.1 As part of the preparation of any development plan, it is vital to ensure that
allocations within it are both viable and deliverable. To not make efforts to explore
both these aspects is to then risk that the Plan may be unsound and so in turn fail to
meet its own targets or objectives.
5.0.2 Although detailed viability appraisals are difficult to prepare at this stage of the Plan’s
preparation due to the absence of, for example, such things as full engineering
details, it is possible to undertake such appraisals at a strategic or in-principle level.
The following therefore represents such a process and is fit-for-purpose in providing
confidence with regards to both the viability and deliverability of the Candidate Site at
this stage, but it should be noted, that more detailed analysis at a planning
application stage may result in some variance.
5.1 VIABILITY APPRAISAL
5.1.1 The following provides an indication of the viability of delivering the proposed 20 units
on the Alternative Site in question. It is based very much on its greenfield status and
uses figures and costings previously accepted by the local authority through its
determination of planning applications and other works. The following appraisal is
therefore based on the assumptions set out below in order to provide a residual value
for the scheme, prior to ascertaining an indicative land value.
Costs
 Dwelling construction costs are based on £1,250 per metre (to allow for
ground levels).
 Adoptable road construction cost based on £1200 per metre
 Connections for all utilities include water, foul water and electric
 Developer’s Profit based on RICS guidelines (18%)
 Professional Fees include planning application fee, associated professional
fees, estate agency fees (1%) and LABC Warranty fee.
Alternative Allocation Report April 2023
Land off Parc y Dleyn, Carmarthen
Sales
 Sale Prices based on LPAs Affordable Housing SPG, market research and
ACG figures where relevant.
5.1.2 Using the above, the following represents a strategic viability appraisal for the
proposed 20 units, with 3 units being made available on an affordable basis (based
on 3 three bed units).
Costs Cost Per Unit/Metre No. Units/Metres Total
4 Bed Det. (145 sq m) 181259 13 2356367
3 Ded Det. (120sq m) 150000 7 1050000
Road Construction +
Off Site 100000
Utility Connections 5000 20 100000
Professional Fees - 113698
Sprinklers 3500 20 70000
Parks and Education
Cont. 5000 20 100000
Total 3890065
Sales
3 Bed Det. (120 sqm)
(Aff.) 78286 3 234858
3 Ded Det. (120sq m) 265000 3 795000
4 Bed Det. (145 sq m) 330000 14 4620000
Total 5649858
Developers Profit Total 1016974.44
Residual Land Value 742818.56
Table 2
5.1.3 Although the above figures have not been able to take into account any future
changes to construction costs as a result of other external factors (e.g. changes to
Building Regulations), it is considered that in-principle, the development of the site
would be financially viable.
Alternative Allocation Report April 2023
Land off Parc y Dleyn, Carmarthen

5.2 DELIVERABILITY
5.2.1 In terms of deliverability, it should be firstly noted, as illustrated above, that the site is
financially and physically viable, with no environmental, geo-physical or technical
constraints prohibiting immediate development. Furthermore, there are no ownership
or third-party interests preventing the Ssite’s delivery.
5.2.2 In terms of a delivery timescale, it is envisaged that the site could be capable of being
completed within 2 years from the adoption of the Replacement Local Development
Plan. Parc y Delyn and its immediate environs remains an attractive part of
Carmarthen given its panoramic views over the surrounding landscape and good
access to nearby schools, shops, services and community facilities.
Alternative Allocation Report April 2023
Land off Parc y Dleyn, Carmarthen

6.0 NATIONAL PLANNING POLICY CONSIDERATIONS
6.0.1 In the preparation of any development plan, consideration must be given to national
policy and guidance. At present, this takes the form of Planning Policy Wales (PPW)
(Edition 11) and a series of Technical Advice Notes (TAN) that deal with a range of
topic areas.
6.1 HOUSING SUPPLY
6.1.1 With regards to the provision of housing, Paragraph 4.2.2 of PPW gives the following
requirements the planning system must fulfil:
 Identify a supply of land to support the delivery of the housing requirement to
meet the differing needs of communities across all tenures;
 Enable the provision of a range of well designed, energy efficient, good quality
market and affordable housing that will contribute to the creations of sustainable
places; and
 Focus on the delivery of the identified housing requirement and the related land
supply
6.1.2 In addition to the above, Paragraph 4.2.10 of PPW states “the supply of land to meet
the housing requirement proposed in a development plan must be deliverable”. As
detailed previously, it is considered that the LPA has to date failed to accomplish this
requirement under the provisions of the current LDP and will continue to do so under
the provisions of the proposed allocations of the 2nd Deposit LDP.
6.1.3 In order therefore to re-dress this deficiency in provision, and provide a more robust
approach to housing provision through a mixed site-scale approach, there is an
urgent need to identify alternative deliverable housing allocations in the replacement
Plan. Based on the accompanying information, it is clear that the Alternative Site
represents one such example.
Alternative Allocation Report April 2023
Land off Parc y Dleyn, Carmarthen

7.0 CONCLUSION
7.1 Although currently undeveloped, the Alternative Site forms a logical extension to an
existing settlement, being well related to it and being positioned at a location within
the wider landscape to not form a prominent or logical part of the surrounding open
countryside.
7.2 In addition to the above, the site lies within close proximity and walking distance of
the existing community services and local facilities of the adjoining settlement, which
will ensure it makes a positive contribution to both national and local sustainable
development objectives.
7.3 From a wider sense, the Site will also benefit from well served excellent public
transport links to the adjoining larger town of Carmarthen, together with other
locations within and adjoining the County, further increasing the facilities and services
available to future residents of the Site via sustainable transport means.
7.4 In tandem to the above, the development of the Site will in turn ensure a viable and
so deliverable source of future housing for the Principal Centre is forms part of, which
has seen a dangerous level of under supply prior to and since the adoption of the
current LDP. The development of the Site will help to redress this imbalance and it is
strongly suggested that the Authority closely scrutinises those sites currently
allocated in the LDP in terms of their suitability and deliverability if it is to continue to
allocate them. National planning policy however would suggest that in view of the
uncertainty in relation to their delivery, such sites should not form part of the
replacement LDP.
7.5 With the Alternative Site having no access, ground condition, flood risk, hydrological,
ecological, archaeological or land ownership related constraints, its delivery if
allocated is assured. Combined therefore with its locational characteristics, the Site in
question represents a sustainable candidate for future housing development.
Alternative Allocation Report April 2023
Land off Parc y Dleyn, Carmarthen
7.6 In view of the above and information provided in this Statement, it is respectfully
requested that the Alternative Site in question be designated for residential
development.


Ein hymateb:

There is sufficient and more appropriate land available for residential use within the settlement to accommodate its housing need.