Gwrthwynebu

Ail Gynllun Datblygu Lleol Adneuo Diwygiedig Sir Gaerfyrddin

ID sylw: 4992

Derbyniwyd: 06/04/2023

Ymatebydd: Mrs Wendy Evans

Cydymffurfio â’r gyfraith? Heb nodi

Cadarn? Nac Ydi

Crynodeb o'r Gynrychiolaeth:

Objection to Policy SD1 Development Limits for the following reasons:
Site reference AS2/159/003. There is an error in the current LDP proposals map, the two strips of land identified in the attachments (off Heol Brown, Tycroes) formed part of the original conveyance of 1988 from the Coal Board. These two parcels of land need to be placed outside the development limits and included as being protected from development. The land registry document attached confirms the registration of these two strips as being part of the main parkland; they therefore need to be protected from development.

Newid wedi’i awgrymu gan ymatebydd:

Remove the two strips of land in question from development limits and protect as part of the original conveyance from the Coal Board.

Testun llawn:

In the 2018 LDP sites map, the whole of the land conveyed by the coal board was confirmed as being protected from development, and a 700+ residents petition delivered to Mr Ian R Llewelyn at the Carmarthenshire council offices confirmed the community support for this protection.

It is still necessary to include as protected from development the area bordered in red on

Attachment 2

There is an error in the current ldp map development outline ,

the two strips of land identified in

Attachment 3

formed part of the original conveyance of 1988 see

Attachment 4

these two parcels of land need to be placed outside the development limits and
included as being protected from development

Attachment 5

is an extract supplied by the coal board estates dept with a red hatched area clearly
showing the areas bordering Heol Brown, including the two strips of land referred to
above, as being included in the conveyance and hence covered by the relevant
covenant

Attachment 6

This land registry document confirms the registration of these two strips as being
part of the main parkland contained in the conveyance, and need to be registered as
protected from development along with the previously explained section within the
main green park area.

This needs to be confirmed as being the intention to comply with the perpetuity
period stipulated by the coal board to 2068 to safeguard from development this much
used and enjoyed open green space.

Atodiadau:


Ein hymateb:

Disagree. Matter to be further considered at Examination.