Gwrthwynebu
Ail Gynllun Datblygu Lleol Adneuo Diwygiedig Sir Gaerfyrddin
ID sylw: 4934
Derbyniwyd: 13/04/2023
Ymatebydd: Ms Sophie Hancock
Cydymffurfio â’r gyfraith? Nac Ydi
Cadarn? Nac Ydi
The attached petition is signed by 34 concerned citizens who strongly OBJECT to the developmental limit change on the Plan (see map).
Our objection comes under Policy SD1 relating to developmental limits.
We believe that the Plan is unsound and should be changed because it does not conform to the test of soundness with regards to Procedural Requirements, i.e. the way in which the Plan has been prepared and consulted on because it has been done without public consultation. We believe that the Procedural Requirements have not been met for the same reason.
We want the developmental boundary line as shown on the map attached to the petition Appendix A to be put back to how it was previously, as shown by the black line in Map 1 in Appendix A and in the “Deposit Revised Carmarthenshire Local Development Plan 2018 – 2033 Proposals”.
The attached petition is signed by 34 concerned citizens who strongly OBJECT to the developmental limit change on the Plan (see map).
Our objection comes under Policy SD1 relating to developmental limits.
We believe that the Plan is unsound and should be changed because it does not conform to the test of soundness with regards to Procedural Requirements, i.e. the way in which the Plan has been prepared and consulted on because it has been done without public consultation. We believe that the Procedural Requirements have not been met for the same reason.
This assessment of the site has been undertaken in accordance with national guidance and the Site Assessment Methodology and background/topic papers and the supporting evidence.