Second Deposit LDP

Search representations

Results for Parc Emlyn Developments Limited search

New search New search

Object

Second Deposit LDP

PrC3/MU1

Representation ID: 4930

Received: 13/04/2023

Respondent: Parc Emlyn Developments Limited

Agent: Lightwater TPC (Adrian Thompson)

Legally compliant? Yes

Sound? No

Representation Summary:

See statement by Lightwater TPC (13 April 2023). In summary, the Deposit Plan as currently set out does not meet the second test of soundness. It is not appropriate because
• the rationale behind the plan’s policy has not been demonstrated
• real alternatives have not been properly considered, and
• it is not logical and reasonable.

Change suggested by respondent:

The extent of the site allocation as shown on the Deposit Plan Proposals map should be amended to include all of the coloured areas as shown on the Initial Masterplan drawing (PED - PrC3-MU1 - 2023-04-13 [2] - Parc Emlyn Initial Masterplan) accompanying the statement by Lightwater TPC and or the settlement boundary line should remain as shown on the current Local Plan policies map.

Full text:

See statement by Lightwater TPC (13 April 2023). In summary, the Deposit Plan as currently set out does not meet the second test of soundness. It is not appropriate because
• the rationale behind the plan’s policy has not been demonstrated
• real alternatives have not been properly considered, and
• it is not logical and reasonable.


Our response:

Disagree, the allocation of the site within the LDP for residential purposes has been subject to full consideration through the site assessment methodology. As part of this assessment process a detailed site pro forma has been prepared.

For instructions on how to use the system and make comments, please see our help guide.