Ail Gynllun Datblygu Lleol Adneuo Diwygiedig Sir Gaerfyrddin
Chwilio sylwadau
Canlyniadau chwilio Parc Emlyn Developments Limited
Chwilio o’r newyddGwrthwynebu
Ail Gynllun Datblygu Lleol Adneuo Diwygiedig Sir Gaerfyrddin
PrC3/MU1
ID sylw: 4930
Derbyniwyd: 13/04/2023
Ymatebydd: Parc Emlyn Developments Limited
Asiant : Lightwater TPC (Adrian Thompson)
Cydymffurfio â’r gyfraith? Ydi
Cadarn? Nac Ydi
See statement by Lightwater TPC (13 April 2023). In summary, the Deposit Plan as currently set out does not meet the second test of soundness. It is not appropriate because
• the rationale behind the plan’s policy has not been demonstrated
• real alternatives have not been properly considered, and
• it is not logical and reasonable.
The extent of the site allocation as shown on the Deposit Plan Proposals map should be amended to include all of the coloured areas as shown on the Initial Masterplan drawing (PED - PrC3-MU1 - 2023-04-13 [2] - Parc Emlyn Initial Masterplan) accompanying the statement by Lightwater TPC and or the settlement boundary line should remain as shown on the current Local Plan policies map.
See statement by Lightwater TPC (13 April 2023). In summary, the Deposit Plan as currently set out does not meet the second test of soundness. It is not appropriate because
• the rationale behind the plan’s policy has not been demonstrated
• real alternatives have not been properly considered, and
• it is not logical and reasonable.
Disagree, the allocation of the site within the LDP for residential purposes has been subject to full consideration through the site assessment methodology. As part of this assessment process a detailed site pro forma has been prepared.