Object

Safleoedd Ymgeisio a Gyflwynwyd / Candidate Site Submissions

Representation ID: 639

Received: 05/02/2019

Respondent: Mr Matthew Bowden

Representation Summary:

*Part of site is at risk of flooding (see attached). Floodwater already runs down from these fields. A reduction of land capable of absorbing water will compound the issues and impact existing properties.
*The implications increased level of traffic passing over the level crossing which at current levels already brings the town to a standstill.
*Site outside of town boundary and is a green field site. Brown field sites exist within the town which should be developed first.
*Sewerage network is at/near to capacity. Adding additional volume to the network would require upgrade or risk environmental damage in the area.