Object
Safleoedd Ymgeisio a Gyflwynwyd / Candidate Site Submissions
Representation ID: 1298
Received: 07/02/2019
Respondent: Llanelli Constituency
Representation Summary:
Already problems disposing of surface water and sewage.
Flood risk to properties down in Bynea.
Lack of road infrastructure many more additional cars using Station Road, , Genwen Road, the Penygraig area, and Heol y Mynydd and further traffic congestion problems in Bynea, Llangennech, Bryn, Pemberton and Llwynhendy.
Planning application at Gwndwm Mawr, Station Road, Bynea turned down by the Planning Committee saying "generates an unacceptable level of traffic on the surrounding road network which would reduce highway safety on the network or reduce the amenity of residents along the route,"