SeC14/h2

Yn dangos sylwadau a ffurflenni 1 i 3 o 3

Gwrthwynebu

Ail Gynllun Datblygu Lleol Adneuo Diwygiedig Sir Gaerfyrddin

ID sylw: 5189

Derbyniwyd: 12/04/2023

Respondent ID: 4967

Ymatebydd: Evans Banks Planning Limited

Cydymffurfio â’r gyfraith? Heb nodi

Cadarn? Nac Ydi

Crynodeb o'r Gynrychiolaeth:

We object to the inclusion of the allocation and that its inclusion within the Plan would result in the document being ‘unsound’. Despite having almost 10 years of support for the principle of residential development at the historic allocation from the Council, not a single housing unit has been delivered to date.

We therefore respectfully request that this Representation be given careful examination, and that the allocation be removed to ensure that the document passes all the relevant tests of soundness.


Ein hymateb:

Disagree, the allocation of the site within the LDP for residential purposes has been subject to full consideration through the site assessment methodology. As part of this assessment process a detailed site pro forma has been prepared.

Cefnogi

Ail Gynllun Datblygu Lleol Adneuo Diwygiedig Sir Gaerfyrddin

ID sylw: 5655

Derbyniwyd: 23/05/2023

Respondent ID: 5826

Ymatebydd: Dwr Cymru/Welsh Water

Crynodeb o'r Gynrychiolaeth:

Water Supply: No issues; offsite mains required
Public Sewerage: No issues; offsite mains required
WwTW: Pencader – no issues

Atodiadau:


Ein hymateb:

Information welcomed.

Gwrthwynebu

Ail Gynllun Datblygu Lleol Adneuo Diwygiedig Sir Gaerfyrddin

ID sylw: 5823

Derbyniwyd: 14/04/2023

Respondent ID: 3885

Ymatebydd: Ffos Las Ltd

Asiant : Carney Sweeney

Cydymffurfio â’r gyfraith? Heb nodi

Cadarn? Nac Ydi

Crynodeb o'r Gynrychiolaeth:

The 2nd Deposit Plan’s evidence base includes a Nutrient Mitigation Options Technical Review report prepared by Ricardo (June 2022). The report notes that the Pencader Sewage Treatment Works and Llandovery Waste Water Treatment works have the highest number of planning applications constrained by phosphorus (page iv of the report). Therefore, it is apparent that future housing development in Pencader and Llandovery is particularly constrained by the need for nutrient neutrality.

There is now, in our view, significant doubts as to the deliverability of the housing site allocated SeC14/h2

Atodiadau:


Ein hymateb:

Disagree, the allocation of the site within the LDP for residential purposes has been subject to full consideration through the site assessment methodology. As part of this assessment process a detailed site pro forma has been prepared.