Gwrthwynebu

Ail Gynllun Datblygu Lleol Adneuo Diwygiedig Sir Gaerfyrddin

ID sylw: 5935

Derbyniwyd: 13/04/2023

Respondent ID: 5702

Ymatebydd: Nisa Local Drefach Limited

Asiant : Evans Banks Planning Limited

Cydymffurfio â’r gyfraith? Heb nodi

Cadarn? Heb nodi

Crynodeb o'r Gynrychiolaeth:

The Land was allocated Carmarthenshire Unitary Development Plan (2006). No progress was made in bringing the site forward, and yet it was allocated within the Local Development Plan in 2014. Consequently, twenty years of Development Plan allocations have elapsed without any signs of delivery of this site. Clearly,
there is no historic demand for a site of this scale in this part of the Drefach area.
More physically challenging sites, such as Cae Coch, Cae Pound at Cross Hands and Heol-y-Parc at Cefneithin have come forward despite topographic issues and previous ground contamination, and yet still the Council is prepared to allocate the site once again in a new Development Plan. The land is relatively level with immediate access onto the local highway network.
The decision to retain Nantydderwen after a period of 20 years within the LDP is shown to be inconsistent, as does not sit with LDP Procedural Guidance which encourages Local Planning Authorities to only re-allocate sites based upon firm evidence of deliverability.

Atodiadau:


Ein hymateb:

Disagree, the allocation of the site within the LDP for residential purposes has been subject to full consideration through the site assessment methodology. As part of this assessment process a detailed site pro forma has been prepared.