Gwrthwynebu

Ail Gynllun Datblygu Lleol Adneuo Diwygiedig Sir Gaerfyrddin

ID sylw: 5728

Derbyniwyd: 25/05/2023

Respondent ID: 3253

Ymatebydd: Natural Resources Wales

Cydymffurfio â’r gyfraith? Heb nodi

Cadarn? Heb nodi

Crynodeb o'r Gynrychiolaeth:

The site appear to provide important ecological connectivity features. Loss of ecosystem connectivity would be at odds with the fundamental aims of maintaining and enhancing biodiversity and your Authority’s duty under Section 6, Part 1 of the Environment (Wales) Act 2016. The Well-Being of Future Generations (Wales) Act and the Environment (Wales) Act provide a duty to maintain and enhance the resilience of ecosystems.

- PrC3/h4 Tirychen Farm
The site has secured outline permission and there are several ecological requirements attached. The final design of the site will have to be guided by the ecological sensitivities of the site.

Atodiadau:


Ein hymateb:

The allocation of the site within the LDP for residential purposes has been subject to full consideration through the site assessment methodology. As part of this assessment process a detailed site pro forma has been prepared.