Gwrthwynebu

Ail Gynllun Datblygu Lleol Adneuo Diwygiedig Sir Gaerfyrddin

ID sylw: 5381

Derbyniwyd: 14/04/2023

Respondent ID: 4879

Ymatebydd: Barratt David Wilson Homes

Asiant : Boyer Planning

Cydymffurfio â’r gyfraith? Heb nodi

Cadarn? Nac Ydi

Crynodeb o'r Gynrychiolaeth:

BDW objects to the allocation of this site. It comprises an existing allocation within the adopted LDP which is proposed to be ‘rolled’ forward by CCC. There is no evidenced justification for the continued allocation of this site, given that no progress has been made since its first allocation in 2014. The delivery of this site has been pushed back a year in every JHLAS since at least 201, which confirms the lack of progress and deliverability of this site. This site should be removed as a draft allocation from the Deposit Revised LDP.

Atodiadau:


Ein hymateb:

Disagree, the allocation of the site within the LDP for residential purposes has been subject to full consideration through the site assessment methodology. As part of this assessment process a detailed site pro forma has been prepared.