Gwrthwynebu

Ail Gynllun Datblygu Lleol Adneuo Diwygiedig Sir Gaerfyrddin

ID sylw: 5345

Derbyniwyd: 14/04/2023

Respondent ID: 4967

Ymatebydd: Evans Banks Planning Limited

Cydymffurfio â’r gyfraith? Heb nodi

Cadarn? Nac Ydi

Crynodeb o'r Gynrychiolaeth:

The Allocated Site at Pibwrlwyd is substantial in overall size, contributibg 14.6% towards that overall cluster total. That equates to one new house in every seven in the Carmarthen Cluster is being promoted at an “out-of-town” location, divorced from community facilities. After over 20 years of UDP and LDP Plan Periods, only Welsh Government have enacted upon the Mixed-Use allocation, as evidenced at Cabna Court. Coleg Sir Gar in contrast over this time have not even undertaken any known marketing campaign to realise the asset bestowed upon by the above two Development Plans. We submit that the Allocated Site be dramatically reduced in scale to only include the area about Cabna Court and Heol Glasdwr for employment purposes (B1, B2 & B8). The area about Coleg Sir Gar at Pibwrlwyd Lane could benefit from perhaps one sole modest field enclosure to allow for educational expansion. The remaining field enclosures, being the bulk of central 20 hectares, should be omitted from the allocation. The proposed housing allowance should be re-allocated elsewhere in Carmarthen to more sustainable Candidate Sites.


Ein hymateb:

Disagree, the allocation of the site within the LDP for residential purposes has been subject to full consideration through the site assessment methodology. As part of this assessment process a detailed site pro forma has been prepared.