Gwrthwynebu

Ail Gynllun Datblygu Lleol Adneuo Diwygiedig Sir Gaerfyrddin

ID sylw: 5316

Derbyniwyd: 14/04/2023

Respondent ID: 5155

Ymatebydd: Tata Steel Europe Limited

Asiant : Gareth Barton

Cydymffurfio â’r gyfraith? Heb nodi

Cadarn? Nac Ydi

Crynodeb o'r Gynrychiolaeth:

Whilst supportive of the proposed allocation at Maesarddafen Road, Llanelli (PrC2/H15) through Policy HOM1 (as set out above), our client strongly objects to the failure to allocate land at Erw Las, Cefncaeau for residential development. AS/086/086.

The proposed site (see attached plan) forms part of a wider allocation within the adopted LDP (alongside land at Maesyrddafen Road) for a development of 300 residential homes (GA2/h35). As outline, the Council has already granted outline planning permission for up 94 units on part of this allocated site (application reference: S/34991 – land at Maesyrddafen Road). Whilst land at Maesyrddafen Road is proposed as an allocation in the RLDP, the remaining land within Tata Steel’s control at Erw Las is not carried forward as a proposed allocation.
Our client strongly supports the continued allocation of land at Erw Las for residential development. This would provide for additional new homes to come forward on a sustainable site, which is currently allocated in the adopted LDP.The land controlled by Tata Steel at Erw Las would provide a viable and deliverable allocation that could be brought forward quickly.

As demonstrated above, a significant amount of technical work has been completed to support the outline planning application, confirming that the site is not impeded by significant technical constraints. The site could therefore be brought forward swiftly, contributing to the continuous supply of deliverable sites and thereby helping to address the identified need for new housing.
The development of the site will also help to sustain and enhance the existing services and facilities available within Llanelli, resulting in a wide range of spin-off benefits for the local community.

Atodiadau:


Ein hymateb:

There is sufficient and more appropriate land available for residential use within the settlement to accommodate its housing need.