The representation seeks the inclusion of a site previously submitted as a Candidate Site (site referenced SR/149/010) for future residential development in Saron, Ammanford. The representation notes that the currently proposed allocations put forward by the 2nd Deposit LDP are undeliverable. The proposed candidate site is well defined with existing residential development to its north, east and to a degree west. The site is also within close proximity to the range of community facilities and local services the settlement has to offer.
Amend the plan to include the site
We are instructed by Ms D England and Mr D Davies to make a formal representation to the
“soundness” of the Deposit Draft of the Carmarthenshire Local Development Plan.
Our clients made a formal Candidate Site Submission in August 2018, which was referenced
SR/149/010, seeking the allocation of their land for future residential development within the
defined settlement limits of Saron as part of the Replacement Local Development Plan. The
Candidate Site comprised of two single existing enclosures, accessed directly off the
adjoining public highway on its northern boundary. The enclosures are then well defined,
with existing residential development to its north, east and to a degree west. The site is also
within close proximity to the range of community facilities and local services the settlement
has to offer.
The Council have published a “Site Assessment Table” (January 2020) which provides
details of the Council’s analysis of each received Candidate Site submission, and in the case
of our Client’s submission, the reason why the site was not selected for allocation for
residential development purposes within the draft settlement limits of Capel Hendre, as
contained within the Deposit Draft.
We note that the submission successfully passed through Stage 1 (site compatible against
the location of future growth presented in the Preferred Strategy), Stage 2A (Initial Detailed
Site Assessment), Stage 2B (further detailed site assessment) and Stage 3 (Sustainability
Appraisal and Habitat Regulation Assessment). However and despite passing each stage of
the Council’s assessment, the Authority determined not to allocate the site for residential
development for the following single reason:
“There is sufficient and more suitable land available in Saron to meet its housing needs.
We however consider its exclusion to be an erroneous decision by the Authority and
consider therefore that the LDP is “unsound” and should be changed, as it fails to meet the
tests for “soundness”, in that the Plan “is not appropriate”, and “will not deliver”, as defined
by the Planning Inspectorate’s LDP Examinations Procedural Guidance.
Specifically, we consider that alternative allocations within the settlement and wider growth
area are neither appropriate nor deliverable. We consider therefore that the land edged red
in Plan A below, should be allocated for residential development under the provision of
Policy HOM1 of the Carmarthenshire Local Development Plan.
Plan A
This formal representation letter supplements the following documents which comprise a
complete submission to the Deposit Draft Consultation stage:
- Completed Deposit LDP Representation Form
- Completed Sustainability Appraisal form
- Copy of Candidate Site Submission Report
- Copy of Transport Statement
Response to Council’s Reasons for Non-Allocationof Site
Sufficient Residential Land Allocated Within Settlement
The Council consider that the allocation of the site for the purposes of residential
development is unnecessary due to their view that alternative allocations within Saron and
the wider growth area (Cluster 3) it forms part of will deliver sufficient housing for the town.
Under the current provision of the Deposit LDP, Cluster 3 has a range of proposed
residential allocations. Having considered each one in terms of its sustainability level,
technical deliverability and recent planning history, we consider that a number will not be
brought forward during the Plan period and so will result in the Plan being unsound if it is
adopted in its current form. These proposed allocations are listed below and now
considered:
Ref. No. Site Name Units
PrC3/h4 Tirychen Farm, Penybanc 150
PrC3/h9 Land adjacent to Maesyrhaf 9
PrC3/h10 Land to the rear of Gwernllwyn, Cross Hands 30
PrC3/h14 Nantydderwen, Drefach 13
PrC3/h20 Land north of Maespiode, Llandybie 42
Table 1
Allocation PrC3/h4 is currently allocated for 150 residential units. Planning permission was
last granted in 2014 for 289 dwellings, under Application E/21633. However, that permission
was only granted in outline form. It subsequently lapsed, and the landowners sought to vary
conditions upon that permission to extend the validity of the outline permission. That
Variation of Condition application was finally approved in October 2019, under Application
E/38686.
A Phasing Plan has been introduced, which proposes that a first phase of 50 dwellings be
brought forward with full details to be submitted within two years of the date of the above
variation approval. The remaining phases are shown as long-term proposals, with details not
required to be submitted for up to a further five years.
The recently approved Variation of Condition permission does little to display any real
progress in the deliverability of the site. It merely amounts to the landowners seeking to
continue to benefit from an outline planning permission at the site. Full planning permission
was granted as far back as 1992 (D6/19332), which subsequently lapsed. The Land
continued to be allocated within the Dinefwr Local Plan (1996), and subsequent
Carmarthenshire Unitary Development Plan (2003). No progress was made in bringing the
site forward, and yet it was allocated within the Local Development Plan in 2014.
Consequently, thirty years of Development Plan allocations have elapsed without any signs
of delivery of this site – not a single new housing unit has been constructed on the site in
that time. More physically challenging sites, such as the re-development of the Betws
Colliery site have come forward long before Tirychen, and yet still the Council is prepared to
allocate the site once again in a new Development Plan despite clear doubts over its
deliverability within the Plan period.
The Council has seen fit to re-examine housing land supply and residential land availability
in preparation of this draft LDP, and ultimately decided to omit various sites that were
allocated in the 2014 Local Development Plan, from the new Deposit Draft. Those sites
include “Heol Ddu” at Tycroes (LDP site GA3/h23) which was allocated for 150 units, and
also had an outline planning permission. However, the Council now consider that a
residential development will not be deliverable on the site.
The decision to retain Tirychen
Farm after a period of 30 years within the LDP is shown to be even more inconsistent, and
does not sit with LDP Procedural Guidance which encourages Local Planning Authorities to
only re-allocate sites based upon firm evidence of deliverability. The allocation of the site for
residential development is therefore clearly unsound.
The above trend of re-allocating undeliverable sites continues then through the other
allocations highlighted in Table 1 above. Each of these has seen consents granted on them
some time ago, but each has seen little or no evidence of any development since these
approvals were issued. Table 2 provides a summary of this information.
Allocation Name Units Planning History
PrC3/h9 Land adjacent to Maesyrhaf 9 S/01815 – Full (10 Units) – 09/09/1999
S/13257 – 10/07/2006 – Extended existing time limit of S/01815
S/22921 – 01/04/2011 – Residential Development
S/35926 – 08/082017 – Construction of 9 dwellings
PrC3/h10 Land to the rear of Gwernllwyn,
Cross Hands
30 W/29164 – Outline 28 Units – 12/11/2013
PrC3/h14 Nantydderwen, Drefach 13 W/20230 – Full (33 Units) – 14/11/2008
PrC3/h20 Land north of Maespiode,
Llandybie
42 E/21328 – Full – 23/06/09
E/22540 – Full (1 Unit) – 25/2/10
E/26446 – Full (4 Units) – 17/04/12
E/39129 – Full (2 Units) – 12/07/19
Table 2
As can be seen, despite each having historic consents, often repeated through extension of
time applications, each of the above application has still failed to deliver a significant level of
housing for the growth area in question. Combined with the failure of the Tirychen Farm
allocation to deliver any units, the historic under provision of these sites has resulted in a
deficit of almost 250 units being delivered for the benefit of the local community they should
serve. Each clearly has significant questions over its deliverability and genuine availability for
development. To continue to allocate such sites for residential development therefore results
in the Plan being unsound. Alternative sites, such as that put forward by our Client, must
therefore be considered and brought forward in order to address this deficiency and ensure
that the Plan is sound in all respects.
In conclusion, this Representation to the Deposit Draft of the Revised LDP has sought to
examine the Council’s reasons for non-allocation of a Candidate Site. It has successfully
addressed the reason put forward by the Authority for its exclusion and has identified that
currently proposed allocations are undeliverable.
We therefore respectfully request that this Representation be given careful examination, and
consequently the land in question be allocated for residential development as part of the
Carmarthenshire Local Development Plan to ensure that the document passes all the
relevant tests of soundness.
The sites have been duly considered in the formulation and preparation of the LDP with the reasons for their non-inclusion set out within the Site Assessment Table. The representations raise no additional points which justify inclusion of the suggested sites. The assessment of sites was undertaken in accordance with national guidance and the site assessment methodology and background/topic papers and the supporting evidence.