Gwrthwynebu
Ail Gynllun Datblygu Lleol Adneuo Diwygiedig Sir Gaerfyrddin
ID sylw: 4993
Derbyniwyd: 06/04/2023
Ymatebydd: Mrs Wendy Evans
Cydymffurfio â’r gyfraith? Heb nodi
Cadarn? Nac Ydi
Objection to Policy NE4: Development within the Caeau Mynydd Mawr SPG Area for the following reasons:
Site reference AS2/159/004. Land covered by candidate site SR/159/014 is included within a Coal Board Conveyance (in 1988) which contains covenants relating to the specific use of the land for the community’s recreation or amenity. It should therefore be placed into the Caeau Mynydd Mawr SPG area which does allow for potential development, albeit with special conditions is in contravention of the appropriate covenant, which is stated in the conveyance as being for eighty years from the date of the original conveyance (20th October 1988), hence active until 2068.
Place candidate site within the Caeau Mynydd Mawr SPG area.
In the 2018 LDP sites map, the whole of the land conveyed by the coal board was confirmed as being protected from development, and a 700+ residents petition delivered to Mr Ian R Llewelyn at the Carmarthenshire council offices confirmed the community support for this protection.
It is still necessary to include as protected from development the area bordered in red on
Attachment 2
There is an error in the current ldp map development outline ,
the two strips of land identified in
Attachment 3
formed part of the original conveyance of 1988 see
Attachment 4
these two parcels of land need to be placed outside the development limits and
included as being protected from development
Attachment 5
is an extract supplied by the coal board estates dept with a red hatched area clearly
showing the areas bordering Heol Brown, including the two strips of land referred to
above, as being included in the conveyance and hence covered by the relevant
covenant
Attachment 6
This land registry document confirms the registration of these two strips as being
part of the main parkland contained in the conveyance, and need to be registered as
protected from development along with the previously explained section within the
main green park area.
This needs to be confirmed as being the intention to comply with the perpetuity
period stipulated by the coal board to 2068 to safeguard from development this much
used and enjoyed open green space.
The delineation of the Caeau Mynydd Mawr SPG area is based upon robust evidence. It is not considered appropriate to revise the area of coverage at this stage. Matter to be considered at Examination.