Gwrthwynebu
Ail Gynllun Datblygu Lleol Adneuo Diwygiedig Sir Gaerfyrddin
ID sylw: 4932
Derbyniwyd: 13/04/2023
Ymatebydd: Mr James Brown
Cydymffurfio â’r gyfraith? Nac Ydi
Cadarn? Nac Ydi
The access road is unsuitable for traffic to be turning out of a junction. The field is extremely soggy and any drainage proposed would mean the water would run down onto me and my neighbours properties thus creating a big issue for us . I don’t believe that the infrastructure of the village would cope with another 20-30 houses as the roads are not brilliant and this would mean an increase in the traffic levels. We currently enjoy the peace and privacy of this village as do many others and this would be compromised.
The plan should not go ahead
The access road is unsuitable for traffic to be turning out of a junction. The field is extremely soggy and any drainage proposed would mean the water would run down onto me and my neighbours properties thus creating a big issue for us . I don’t believe that the infrastructure of the village would cope with another 20-30 houses as the roads are not brilliant and this would mean an increase in the traffic levels. We currently enjoy the peace and privacy of this village as do many others and this would be compromised.
Disagree, the allocation of the site within the LDP for residential purposes has been subject to full consideration through the site assessment methodology. As part of this assessment process a detailed site pro forma has been prepared.