Gwrthwynebu

Ail Gynllun Datblygu Lleol Adneuo Diwygiedig Sir Gaerfyrddin

ID sylw: 4886

Derbyniwyd: 20/03/2023

Respondent ID: 852

Ymatebydd: Kedrick Davies

Cydymffurfio â’r gyfraith? Heb nodi

Cadarn? Nac Ydi

Crynodeb o'r Gynrychiolaeth:

Object to the deletion of the strategic development area as was defined in the current adopted LDP as T2/2h1.
This is the most logical place to accommodate growth for the town and requires a strategic long term vision.

The deletion of this strategic vision is a serious failing in the 2018-2033 LDP Revised Deposit.

The “incremental” and disconnected release of land in this northern area of the town as is apparent by the isolated allocation of SeC16/h1 in the Revised Deposit does not constitute the proper planning of the area and will result in a unsatisfactory form of development out of accord with the Council’s own SPG on Placemaking and Design.

Atodiadau:


Ein hymateb:

Disagree. The allocation of the site within the LDP for residential purposes has been subject to full consideration through the site assessment methodology. As part of this assessment process a detailed site pro forma has been prepared.