Gwrthwynebu
Ail Gynllun Datblygu Lleol Adneuo Diwygiedig Sir Gaerfyrddin
ID sylw: 4886
Derbyniwyd: 20/03/2023
Respondent ID: 852
Ymatebydd: Kedrick Davies
Cydymffurfio â’r gyfraith? Heb nodi
Cadarn? Nac Ydi
Object to the deletion of the strategic development area as was defined in the current adopted LDP as T2/2h1.
This is the most logical place to accommodate growth for the town and requires a strategic long term vision.
The deletion of this strategic vision is a serious failing in the 2018-2033 LDP Revised Deposit.
The “incremental” and disconnected release of land in this northern area of the town as is apparent by the isolated allocation of SeC16/h1 in the Revised Deposit does not constitute the proper planning of the area and will result in a unsatisfactory form of development out of accord with the Council’s own SPG on Placemaking and Design.
Disagree. The allocation of the site within the LDP for residential purposes has been subject to full consideration through the site assessment methodology. As part of this assessment process a detailed site pro forma has been prepared.