Gwrthwynebu
Ail Gynllun Datblygu Lleol Adneuo Diwygiedig Sir Gaerfyrddin
ID sylw: 4886
Derbyniwyd: 20/03/2023
Ymatebydd: Kedrick Davies
Cydymffurfio â’r gyfraith? Heb nodi
Cadarn? Nac Ydi
Object to the deletion of the strategic development area as was defined in the current adopted LDP as T2/2h1.
This is the most logical place to accommodate growth for the town and requires a strategic long term vision.
The deletion of this strategic vision is a serious failing in the 2018-2033 LDP Revised Deposit.
The “incremental” and disconnected release of land in this northern area of the town as is apparent by the isolated allocation of SeC16/h1 in the Revised Deposit does not constitute the proper planning of the area and will result in a unsatisfactory form of development out of accord with the Council’s own SPG on Placemaking and Design.
Amend Plan
I refer to the above and in particular the proposals for Llandeilo with regard the area to the north of the town.
In particular I refer to housing allocation SeC16/H1 which is allocated for 27 units plus some affordable.
I am writing to object to the deletion of the strategic development area as was defined in the current adopted LDP as T2/2h1.
This is the most logical place to accommodate growth for the town and requires a strategic long term vision as was envisaged in the :
https://www.sirgar.llyw.cymru/media/1212896/briff-cynllunio-a-datblygu-llandeilo.pdf
The deletion of this strategic vision is a serious failing in the 2018-2033 LDP Revised Deposit.
The “incremental” and I suspect disconnected release of land in this northern area of the town as is apparent by the isolated allocation of SeC16/h1 in the Revised Deposit does not constitute the proper planning of the area and will result in a unsatisfactory form of development out of accord with the Council’s own SPG on Placemaking and Design.
Please acknowledge my submissions on the above and continue to advise me on the evolution of the 2018-2033 Revised Deposit as I would wish to make further representations depending on your responses.
Disagree. The allocation of the site within the LDP for residential purposes has been subject to full consideration through the site assessment methodology. As part of this assessment process a detailed site pro forma has been prepared.