Gwrthwynebu

Ail Gynllun Datblygu Lleol Adneuo Diwygiedig Sir Gaerfyrddin

ID sylw: 4885

Derbyniwyd: 06/04/2023

Respondent ID: 5580

Ymatebydd: Mr Robert Evans

Cydymffurfio â’r gyfraith? Heb nodi

Cadarn? Heb nodi

Crynodeb o'r Gynrychiolaeth:

Objection to housing allocation SeC16/h1:
Sole access via the restricted space of the existing Parc Pencrug estate and its steep hill is inadequate for the construction of the 27 houses shown in the LDP, also for the amount of traffic that would nowadays be subsequently generated by them. This would be even more the case for the 86 homes currently being proposed for the site by Pobl. For the wellbeing of the residents of the existing Parc Pencrug estate and of the residents of the adjacent site a more suitable main access point is needed.


Ein hymateb:

Disagree. The allocation of the site within the LDP for residential purposes has been subject to full consideration through the site assessment methodology. As part of this assessment process a detailed site pro forma has been prepared.