Gwrthwynebu
Ail Gynllun Datblygu Lleol Adneuo Diwygiedig Sir Gaerfyrddin
ID sylw: 4884
Derbyniwyd: 07/04/2023
Ymatebydd: E M Davies
Cydymffurfio â’r gyfraith? Heb nodi
Cadarn? Heb nodi
Firstly the fact that the Developers have shown us plans for a proposal that includes the CCC land and also privately held land - does this that we are open to "incremental development"? (Either now or in the future).
Secondly, access to the site. As I understand it, the only access is via Parc Pencrug. In my opinion, as a resident of Parc Pencrug, this is inadequate. I remember a previous plan (about 2007), where the main access was into Rhosmaen Street. This made much more sense with regard to access to schools,. shops, surgeries etc.
No change but consideration of access to the site
Dear Sir,
I am writing to express my concern about the proposed development on two grounds:-
Firstly the fact that the Developers have shown us plans for a proposal that includes the CCC land and also privately held land - does this that we are open to "incermental development"? (Either now or in the future).
Secondly, access to the site. As I understand it, the only access is via Parc Pencrug. In my opinion, as a resident of Parc Pencrug, this is inadequate. I remember a previous plan (about 2007), where the main access was into Rhosmaen Street. This made much more sense with regard to access to schools,. shops, surgeries etc.
Hoping that these observations make sense to you,
Disagree. The allocation of the site within the LDP for residential purposes has been subject to full consideration through the site assessment methodology. As part of this assessment process a detailed site pro forma has been prepared.