Gwrthwynebu

Ail Gynllun Datblygu Lleol Adneuo Diwygiedig Sir Gaerfyrddin

ID sylw: 4880

Derbyniwyd: 21/03/2023

Ymatebydd: Mr & Mrs Mark & Paula Lewis

Nifer y bobl: 2

Cydymffurfio â’r gyfraith? Heb nodi

Cadarn? Nac Ydi

Crynodeb o'r Gynrychiolaeth:

HOM1 – object – seeks inclusion of T3/5/h2 in Pontyates.

The Site Assessment Methodology (Sept 2019) section 2a sets out the criteria that has to be met before moving to stage 2b. After reviewing the questions set out in this document, we believe that the proposed land does pass this stage such as:
• Accommodate more than 5 dwellings
• Accessible from 2 public highways
• Physically, functionally and visually linked to the settlement
• Close to Public Transport (Lime Grove Bus Stop)
• Water and sewerage connections are already in place
• Easy access with a road already in place

Newid wedi’i awgrymu gan ymatebydd:

Include the site within the Plan.

Testun llawn:

We believe the proposed plan is incorrect and incomplete. In the 2006 - 2021 LDP a portion of the la...
[dangos mwy]

Atodiadau:


Ein hymateb:

The sites have been duly considered in the formulation and preparation of the LDP with the reasons f...
[dangos mwy]