Gwrthwynebu
Ail Gynllun Datblygu Lleol Adneuo Diwygiedig Sir Gaerfyrddin
ID sylw: 4880
Derbyniwyd: 21/03/2023
Ymatebydd: Mr & Mrs Mark & Paula Lewis
Nifer y bobl: 2
Cydymffurfio â’r gyfraith? Heb nodi
Cadarn? Nac Ydi
HOM1 – object – seeks inclusion of T3/5/h2 in Pontyates.
The Site Assessment Methodology (Sept 2019) section 2a sets out the criteria that has to be met before moving to stage 2b. After reviewing the questions set out in this document, we believe that the proposed land does pass this stage such as:
• Accommodate more than 5 dwellings
• Accessible from 2 public highways
• Physically, functionally and visually linked to the settlement
• Close to Public Transport (Lime Grove Bus Stop)
• Water and sewerage connections are already in place
• Easy access with a road already in place
Include the site within the Plan.