Gwrthwynebu

Ail Gynllun Datblygu Lleol Adneuo Diwygiedig Sir Gaerfyrddin

ID sylw: 4778

Derbyniwyd: 11/04/2023

Respondent ID: 5569

Ymatebydd: Miss Amanda Owen

Cydymffurfio â’r gyfraith? Ydi

Cadarn? Ydi

Crynodeb o'r Gynrychiolaeth:

Objection to housing allocation SeC16/h1:
The Road infrastructure to the new "Residential Allocation" is insufficient to cope with additional demand.
A Children’s playground adjoins the main road, cars at present drive too fast. Increased road use would be dangerous to children and other users.
A new independent access road to any new site is required. Access should not be via the existing Parc Pencrug/Llys Pencrug roads. Access to the new site should not adjoin a children’s play area, children and other users at risk from pollution, and volume of cars.


Ein hymateb:

Disagree. The allocation of the site within the LDP for residential purposes has been subject to full consideration through the site assessment methodology. As part of this assessment process a detailed site pro forma has been prepared.