Gwrthwynebu

Ail Gynllun Datblygu Lleol Adneuo Diwygiedig Sir Gaerfyrddin

ID sylw: 4759

Derbyniwyd: 10/04/2023

Ymatebydd: Mrs Sonia El-Harrak

Cydymffurfio â’r gyfraith? Heb nodi

Cadarn? Heb nodi

Crynodeb o'r Gynrychiolaeth:

Objection to the planning application on part of the existing housing allocation T2/2/h1 in Llandeilo (candidate site ref SR/080/013), of which Revised LDP allocation SeC16/h1 forms a part (see also Rep 4751):
The current road is not suitable for either the construction traffic whilst building or consequential increase in population.
As residents we are responsible for ensuring the estate is maintained which includes a children’s play area. If there is an increase in residential properties, there is no way of ensuring this will be maintained. An increase in road vehicles also presents a serious hazard to residents.

Newid wedi’i awgrymu gan ymatebydd:

Any future development adjacent to Parc Pencrug should have separate access.

Testun llawn:

As a home owner in Parc Pencrug, we object to the development by POBL (Ref SR/080/005 & SR/080/013). The current road is not suitable for either the construction traffic whilst building or consequential increase in population.
As residents we are responsible for ensuring the estate is maintained which includes a children’s play area. If there is an increase in residential property there is no way of ensuring this is maintained. An increase in road vehicles also presents a serious hazard to residents.

POBL have dismissed residents concerns with only one “drop in” consultation.


Ein hymateb:

Responses to planning applications are separate to the LDP process. The respondent had the opportunity of submitting comments/objections as part of the consultation period on the planning application. The respondent's objection to the housing allocation on part of existing housing allocation T2/2/h1 (candidate site SR/080/013) is dealt with separately under representation 4751.