Option 2: Land to South and East of LDP Allocation SC18/H3/ SuV5/h1 (ref: SR/039/003).
• The development opportunities proposed in Cwmffrwd is insufficient to meet an identified need.
• The existing allocation at Maesglasnant is near completion and therefore offers little benefit for the forthcoming development plan period
• The land identified through Options 1- 5 above is deliverable and economically viable.
• The development would provide a range of public benefits through the planning obligations and would assist in sustaining Cwmffrwd as a cluster village.
• The land is relatively sustainable within close access to sustainable modes of transport and a plethora of nearby facilities and services.
• The site has no significant constraints and, notably, is not affected by the phosphate issues that are impacting on other areas covered by the LDP.
Further detail is provided in the submission.

Atodiadau:


Ein hymateb:

The sites have been duly considered in the formulation and preparation of the LDP with the reasons for their non-inclusion set out within the Site Assessment Table. The representations raise no additional points which justify inclusion of the suggested sites. The assessment of sites was undertaken in accordance with national guidance and the site assessment methodology and background/topic papers and the supporting evidence.