Gwrthwynebu

Ail Gynllun Datblygu Lleol Adneuo Diwygiedig Sir Gaerfyrddin

ID sylw: 4671

Derbyniwyd: 17/03/2023

Ymatebydd: Mr Keith Fennell

Cydymffurfio â’r gyfraith? Heb nodi

Cadarn? Heb nodi

Crynodeb o'r Gynrychiolaeth:

The respondent objects to housing allocation SeC7/h3 for the following reasons:
This proposal will result in the loss of a wooded area and a loss of habitat for wild life.
Our village is already overdeveloped with a poor infrastructure and this development will only add to the current problems.
Our road backs on to the site and if used as an access road will create more traffic on a road which already has a large volume of cars, some of which are speeding dangerously. There is also the cemetery at the end of Golwg Yr Afon to be taken into consideration which effects access on the occasions when funerals are taking place, due the number of cars being parking by attendees.

Newid wedi’i awgrymu gan ymatebydd:

Remove housing allocation SeC7/h3 from the Revised LDP.

Testun llawn:

I have some concerns on this proposal being:

1. I understand that Carmarthenshire Council have declared a climate and nature emergency, this proposal will result in the loss of a wooded area and a loss of habitat for wild life which I feel goes against the declared emergency.
2. Our village is already overdeveloped with a poor infrastructure and this development will only add to the current problems.
3. Our road backs on to the site and if used as an access road will create more traffic on a road which already has a large volume of cars, some of which are speeding dangerously. There is also the cemetery at the end of Golwg Yr Afon to be taken into consideration which effects access on the occasions when funerals are taking place, due the number of cars being parking by attendees.

I would be grateful if these concerns can be taken into consideration for this proposal


Ein hymateb:

The allocation of the site within the LDP for residential purposes has been subject to full consideration through the site assessment methodology. As part of this assessment process a detailed site pro forma has been prepared.