Safleoedd Ymgeisio a Gyflwynwyd / Candidate Site Submissions

Search representations

Results for Welsh Government search

New search New search

Comment

Safleoedd Ymgeisio a Gyflwynwyd / Candidate Site Submissions

SR/159/010

Representation ID: 1957

Received: 08/02/2019

Respondent: Welsh Government

Representation Summary:

Site subject to a Transport Statement and formalised access/appropriate Design Manual for Roads and Bridges improvement across the frontage to ensure there is a single point of access/egress point to the A483 for all properties.

The respondent has compiled some general comments from Welsh Government Network Management Division as highway authority for the trunk road and motorways in Wales and also makes a number of site specific comments. The respondent states that the strategic trunk road network is for the safe and expeditious movement of long distance traffic. In order to maintain free-flow and safety, there is a general presumption against new access onto trunk roads. Further detailed advice is given on how developments should seek to access trunk roads, with reference made to guidance and legislation (including the Design Manual for Roads and Bridges (DMRB) and the Active Travel Act).

In order for the trunk road highway authority to be in a position to make a considered view, the onus is on the forward planning authority to provide highway evidence in both capacity and safety terms. This will scope the consideration of existing network capacity constraints, agreed infrastructure upgrades and outline delivery streams (such as planning obligations).

Advice is provided on the potential accompanying evidence required with an application (eg Transport Statement (TS) or Transport Assessment (TA)) - commensurate with the scale of the proposal. Applications are judged on their individual merits and specific supporting traffic impact detail may be requested in order to consider network impacts. Where designs are not DMRB compliant there is a right to issue a direction to refuse an application.

Where developments require improvements to existing or new connections to the trunk road and these are agreed at planning, the developer will be required to enter into an appropriate legal agreement for their delivery, generally via Section 184 and Section 278 of the Highways Act.

Comment

Safleoedd Ymgeisio a Gyflwynwyd / Candidate Site Submissions

SR/159/004

Representation ID: 1958

Received: 08/02/2019

Respondent: Welsh Government

Representation Summary:

Site cannot meet DMRB standards due to horizontal road alignment and visibility cutting through Coopers Junction.

The respondent has compiled some general comments from Welsh Government Network Management Division as highway authority for the trunk road and motorways in Wales and also makes a number of site specific comments. The respondent states that the strategic trunk road network is for the safe and expeditious movement of long distance traffic. In order to maintain free-flow and safety, there is a general presumption against new access onto trunk roads. Further detailed advice is given on how developments should seek to access trunk roads, with reference made to guidance and legislation (including the Design Manual for Roads and Bridges (DMRB) and the Active Travel Act).

In order for the trunk road highway authority to be in a position to make a considered view, the onus is on the forward planning authority to provide highway evidence in both capacity and safety terms. This will scope the consideration of existing network capacity constraints, agreed infrastructure upgrades and outline delivery streams (such as planning obligations).

Advice is provided on the potential accompanying evidence required with an application (eg Transport Statement (TS) or Transport Assessment (TA)) - commensurate with the scale of the proposal. Applications are judged on their individual merits and specific supporting traffic impact detail may be requested in order to consider network impacts. Where designs are not DMRB compliant there is a right to issue a direction to refuse an application.

Where developments require improvements to existing or new connections to the trunk road and these are agreed at planning, the developer will be required to enter into an appropriate legal agreement for their delivery, generally via Section 184 and Section 278 of the Highways Act.

Comment

Safleoedd Ymgeisio a Gyflwynwyd / Candidate Site Submissions

SR/159/011

Representation ID: 1959

Received: 08/02/2019

Respondent: Welsh Government

Representation Summary:

Principle of Industrial use agreed. Subject to Transport Statement.

The respondent has compiled some general comments from Welsh Government Network Management Division as highway authority for the trunk road and motorways in Wales and also makes a number of site specific comments. The respondent states that the strategic trunk road network is for the safe and expeditious movement of long distance traffic. In order to maintain free-flow and safety, there is a general presumption against new access onto trunk roads. Further detailed advice is given on how developments should seek to access trunk roads, with reference made to guidance and legislation (including the Design Manual for Roads and Bridges (DMRB) and the Active Travel Act).

In order for the trunk road highway authority to be in a position to make a considered view, the onus is on the forward planning authority to provide highway evidence in both capacity and safety terms. This will scope the consideration of existing network capacity constraints, agreed infrastructure upgrades and outline delivery streams (such as planning obligations).

Advice is provided on the potential accompanying evidence required with an application (eg Transport Statement (TS) or Transport Assessment (TA)) - commensurate with the scale of the proposal. Applications are judged on their individual merits and specific supporting traffic impact detail may be requested in order to consider network impacts. Where designs are not DMRB compliant there is a right to issue a direction to refuse an application.

Where developments require improvements to existing or new connections to the trunk road and these are agreed at planning, the developer will be required to enter into an appropriate legal agreement for their delivery, generally via Section 184 and Section 278 of the Highways Act.

Comment

Safleoedd Ymgeisio a Gyflwynwyd / Candidate Site Submissions

SR/159/013

Representation ID: 1960

Received: 08/02/2019

Respondent: Welsh Government

Representation Summary:

Site can only come forward as part of adjacent junction improvement and right turn lane to serve this site and all development to the rear. Transport Assessment required.

The respondent has compiled some general comments from Welsh Government Network Management Division as highway authority for the trunk road and motorways in Wales and also makes a number of site specific comments. The respondent states that the strategic trunk road network is for the safe and expeditious movement of long distance traffic. In order to maintain free-flow and safety, there is a general presumption against new access onto trunk roads. Further detailed advice is given on how developments should seek to access trunk roads, with reference made to guidance and legislation (including the Design Manual for Roads and Bridges (DMRB) and the Active Travel Act).

In order for the trunk road highway authority to be in a position to make a considered view, the onus is on the forward planning authority to provide highway evidence in both capacity and safety terms. This will scope the consideration of existing network capacity constraints, agreed infrastructure upgrades and outline delivery streams (such as planning obligations).

Advice is provided on the potential accompanying evidence required with an application (eg Transport Statement (TS) or Transport Assessment (TA)) - commensurate with the scale of the proposal. Applications are judged on their individual merits and specific supporting traffic impact detail may be requested in order to consider network impacts. Where designs are not DMRB compliant there is a right to issue a direction to refuse an application.

Where developments require improvements to existing or new connections to the trunk road and these are agreed at planning, the developer will be required to enter into an appropriate legal agreement for their delivery, generally via Section 184 and Section 278 of the Highways Act.

Comment

Safleoedd Ymgeisio a Gyflwynwyd / Candidate Site Submissions

SR/159/016

Representation ID: 1961

Received: 08/02/2019

Respondent: Welsh Government

Representation Summary:

Transport Assessment (TA) required. Will require RTL at Heol Ddu prior to coming forward as per SR159/013

The respondent has compiled some general comments from Welsh Government Network Management Division as highway authority for the trunk road and motorways in Wales and also makes a number of site specific comments. The respondent states that the strategic trunk road network is for the safe and expeditious movement of long distance traffic. In order to maintain free-flow and safety, there is a general presumption against new access onto trunk roads. Further detailed advice is given on how developments should seek to access trunk roads, with reference made to guidance and legislation (including the Design Manual for Roads and Bridges (DMRB) and the Active Travel Act).

In order for the trunk road highway authority to be in a position to make a considered view, the onus is on the forward planning authority to provide highway evidence in both capacity and safety terms. This will scope the consideration of existing network capacity constraints, agreed infrastructure upgrades and outline delivery streams (such as planning obligations).

Advice is provided on the potential accompanying evidence required with an application (eg Transport Statement (TS) or Transport Assessment (TA)) - commensurate with the scale of the proposal. Applications are judged on their individual merits and specific supporting traffic impact detail may be requested in order to consider network impacts. Where designs are not DMRB compliant there is a right to issue a direction to refuse an application.

Where developments require improvements to existing or new connections to the trunk road and these are agreed at planning, the developer will be required to enter into an appropriate legal agreement for their delivery, generally via Section 184 and Section 278 of the Highways Act.

Comment

Safleoedd Ymgeisio a Gyflwynwyd / Candidate Site Submissions

SR/159/003

Representation ID: 1962

Received: 08/02/2019

Respondent: Welsh Government

Representation Summary:

TA required Will require RTL at Heol Ddu prior to coming forward as per SR159/013.

The respondent has compiled some general comments from Welsh Government Network Management Division as highway authority for the trunk road and motorways in Wales and also makes a number of site specific comments. The respondent states that the strategic trunk road network is for the safe and expeditious movement of long distance traffic. In order to maintain free-flow and safety, there is a general presumption against new access onto trunk roads. Further detailed advice is given on how developments should seek to access trunk roads, with reference made to guidance and legislation (including the Design Manual for Roads and Bridges (DMRB) and the Active Travel Act).

In order for the trunk road highway authority to be in a position to make a considered view, the onus is on the forward planning authority to provide highway evidence in both capacity and safety terms. This will scope the consideration of existing network capacity constraints, agreed infrastructure upgrades and outline delivery streams (such as planning obligations).

Advice is provided on the potential accompanying evidence required with an application (eg Transport Statement (TS) or Transport Assessment (TA)) - commensurate with the scale of the proposal. Applications are judged on their individual merits and specific supporting traffic impact detail may be requested in order to consider network impacts. Where designs are not DMRB compliant there is a right to issue a direction to refuse an application.

Where developments require improvements to existing or new connections to the trunk road and these are agreed at planning, the developer will be required to enter into an appropriate legal agreement for their delivery, generally via Section 184 and Section 278 of the Highways Act.

Comment

Safleoedd Ymgeisio a Gyflwynwyd / Candidate Site Submissions

SR/159/002

Representation ID: 1963

Received: 08/02/2019

Respondent: Welsh Government

Representation Summary:

Transport case evidencing required prior to inclusion in LDP with TA and full modelling.

The respondent has compiled some general comments from Welsh Government Network Management Division as highway authority for the trunk road and motorways in Wales and also makes a number of site specific comments. The respondent states that the strategic trunk road network is for the safe and expeditious movement of long distance traffic. In order to maintain free-flow and safety, there is a general presumption against new access onto trunk roads. Further detailed advice is given on how developments should seek to access trunk roads, with reference made to guidance and legislation (including the Design Manual for Roads and Bridges (DMRB) and the Active Travel Act).

In order for the trunk road highway authority to be in a position to make a considered view, the onus is on the forward planning authority to provide highway evidence in both capacity and safety terms. This will scope the consideration of existing network capacity constraints, agreed infrastructure upgrades and outline delivery streams (such as planning obligations).

Advice is provided on the potential accompanying evidence required with an application (eg Transport Statement (TS) or Transport Assessment (TA)) - commensurate with the scale of the proposal. Applications are judged on their individual merits and specific supporting traffic impact detail may be requested in order to consider network impacts. Where designs are not DMRB compliant there is a right to issue a direction to refuse an application.

Where developments require improvements to existing or new connections to the trunk road and these are agreed at planning, the developer will be required to enter into an appropriate legal agreement for their delivery, generally via Section 184 and Section 278 of the Highways Act.

Comment

Safleoedd Ymgeisio a Gyflwynwyd / Candidate Site Submissions

SR/159/006

Representation ID: 1964

Received: 08/02/2019

Respondent: Welsh Government

Representation Summary:

Transport case evidencing required prior to inclusion in LDP with TA and full modelling.

The respondent has compiled some general comments from Welsh Government Network Management Division as highway authority for the trunk road and motorways in Wales and also makes a number of site specific comments. The respondent states that the strategic trunk road network is for the safe and expeditious movement of long distance traffic. In order to maintain free-flow and safety, there is a general presumption against new access onto trunk roads. Further detailed advice is given on how developments should seek to access trunk roads, with reference made to guidance and legislation (including the Design Manual for Roads and Bridges (DMRB) and the Active Travel Act).

In order for the trunk road highway authority to be in a position to make a considered view, the onus is on the forward planning authority to provide highway evidence in both capacity and safety terms. This will scope the consideration of existing network capacity constraints, agreed infrastructure upgrades and outline delivery streams (such as planning obligations).

Advice is provided on the potential accompanying evidence required with an application (eg Transport Statement (TS) or Transport Assessment (TA)) - commensurate with the scale of the proposal. Applications are judged on their individual merits and specific supporting traffic impact detail may be requested in order to consider network impacts. Where designs are not DMRB compliant there is a right to issue a direction to refuse an application.

Where developments require improvements to existing or new connections to the trunk road and these are agreed at planning, the developer will be required to enter into an appropriate legal agreement for their delivery, generally via Section 184 and Section 278 of the Highways Act.

Comment

Safleoedd Ymgeisio a Gyflwynwyd / Candidate Site Submissions

SR/159/015

Representation ID: 1965

Received: 08/02/2019

Respondent: Welsh Government

Representation Summary:

Site can only come forward with delivery of Ammanford distribution road. Fully evidenced prior to inclusion. This is the same for all adjoining potential site allocations. Significant cumulative impacts that are required to be modelled/mitigated prior to LDP2 inclusion.

The respondent has compiled some general comments from Welsh Government Network Management Division as highway authority for the trunk road and motorways in Wales and also makes a number of site specific comments. The respondent states that the strategic trunk road network is for the safe and expeditious movement of long distance traffic. In order to maintain free-flow and safety, there is a general presumption against new access onto trunk roads. Further detailed advice is given on how developments should seek to access trunk roads, with reference made to guidance and legislation (including the Design Manual for Roads and Bridges (DMRB) and the Active Travel Act).

In order for the trunk road highway authority to be in a position to make a considered view, the onus is on the forward planning authority to provide highway evidence in both capacity and safety terms. This will scope the consideration of existing network capacity constraints, agreed infrastructure upgrades and outline delivery streams (such as planning obligations).

Advice is provided on the potential accompanying evidence required with an application (eg Transport Statement (TS) or Transport Assessment (TA)) - commensurate with the scale of the proposal. Applications are judged on their individual merits and specific supporting traffic impact detail may be requested in order to consider network impacts. Where designs are not DMRB compliant there is a right to issue a direction to refuse an application.

Where developments require improvements to existing or new connections to the trunk road and these are agreed at planning, the developer will be required to enter into an appropriate legal agreement for their delivery, generally via Section 184 and Section 278 of the Highways Act.

Comment

Safleoedd Ymgeisio a Gyflwynwyd / Candidate Site Submissions

SR/159/016

Representation ID: 1966

Received: 08/02/2019

Respondent: Welsh Government

Representation Summary:

Site can only come forward with delivery of Ammanford distribution road. Fully evidenced prior to inclusion. This is the same for all adjoining potential site allocations. Significant cumulative impacts that are required to be modelled/mitigated prior to LDP2 inclusion.

The respondent has compiled some general comments from Welsh Government Network Management Division as highway authority for the trunk road and motorways in Wales and also makes a number of site specific comments. The respondent states that the strategic trunk road network is for the safe and expeditious movement of long distance traffic. In order to maintain free-flow and safety, there is a general presumption against new access onto trunk roads. Further detailed advice is given on how developments should seek to access trunk roads, with reference made to guidance and legislation (including the Design Manual for Roads and Bridges (DMRB) and the Active Travel Act).

In order for the trunk road highway authority to be in a position to make a considered view, the onus is on the forward planning authority to provide highway evidence in both capacity and safety terms. This will scope the consideration of existing network capacity constraints, agreed infrastructure upgrades and outline delivery streams (such as planning obligations).

Advice is provided on the potential accompanying evidence required with an application (eg Transport Statement (TS) or Transport Assessment (TA)) - commensurate with the scale of the proposal. Applications are judged on their individual merits and specific supporting traffic impact detail may be requested in order to consider network impacts. Where designs are not DMRB compliant there is a right to issue a direction to refuse an application.

Where developments require improvements to existing or new connections to the trunk road and these are agreed at planning, the developer will be required to enter into an appropriate legal agreement for their delivery, generally via Section 184 and Section 278 of the Highways Act.

For instructions on how to use the system and make comments, please see our help guide.