Second Deposit LDP

Search representations

Results for Mudiad Amddiffyn Porthyrhyd search

New search New search

Object

Second Deposit LDP

SuV20/h1

Representation ID: 5287

Received: 13/04/2023

Respondent ID: 619

Respondent: Mudiad Amddiffyn Porthyrhyd

Legally compliant? Not specified

Sound? Not specified

Representation Summary:

Mae MAP yn ymwybodol iawn bod angen datblygu er mwyn cadw pentrefi’n fyw yn ogystal a diwallu’r angen yn lleol am gartrefi fforddiadwy a chartrefi o safon i’w rhentu. Ond mae MAP yn pryderu hefyd am yr ardrawiadau a ddaw yn sgil rhai datblygiadau ac yn dadlau y dylai unrhyw ddatblygiad ym Mhorth-y-rhyd fod yn gydnaws a chymeriad y pentref ac wedi’i godi ar safle sy’n addas.

Cyflwynir tri gwrthwynebiad am y newidiadau ym Mhorth-y-rhyd. Mae’r gwrthwynebiad hwn yn ymwneud a safle preswyl SuV20/h1. Mae’r sylwadau’n nodi hanes y safle as yn nodi’r gwrthwynebiadau fel a ganlyn:.
• Tresmasu i dir agored
• Colli tir amaethyddol
• Colli ardal werdd
• Ardrawiad andwyol ar gartrefi sy’n ffinio
• Colli tir draeniad pwysig
• Parthau llifogydd
• Y bibell ddŵr
• Mynedfa
• Problemau llifogydd a dwr glaw
• Y system garthffosiaeth
___
MAP is fully aware of the need for development to keep villages alive and viable and create affordable homes and decent rental accommodation for local people. However, MAP is also committed to consider the impact of any proposed developments in Porth-y-rhyd and to ensure that any kind of development is in character with the village and is built on a site where there are no issues.
Three objections are submitted for the changes in Porthyrhyd. This objection relates to the housing site SuV20/h1. The representations sets out the history of the site and detail the objections as follows:
• Encroaching onto open land
• Loss of agricultural land
• Green areas
• Impact on neighbouring properties
• Loss of drainage field
• Flood zones
• Pipeline
• Proposed entrance
• Surface water problems
• Sewerage system

Attachments:


Our response:

Yn anghytuno, mae dyraniad y safle o fewn y CDLl at ddibenion preswyl wedi cael ei ystyried yn llawn drwy'r fethodoleg asesu safle. Fel rhan o'r broses asesu hon paratowyd pro fforma safle manwl.

Disagree, the allocation of the site within the LDP for residential purposes has been subject to full consideration through the site assessment methodology. As part of this assessment process a detailed site pro forma has been prepared.

Support

Second Deposit LDP

HOM1: Housing Allocations

Representation ID: 5288

Received: 13/04/2023

Respondent ID: 619

Respondent: Mudiad Amddiffyn Porthyrhyd

Representation Summary:

Mae MAP yn ymwybodol iawn bod angen datblygu er mwyn cadw pentrefi’n fyw yn ogystal a diwallu’r angen yn lleol am gartrefi fforddiadwy a chartrefi o safon i’w rhentu. Ond mae MAP yn pryderu hefyd am yr ardrawiadau a ddaw yn sgil rhai datblygiadau ac yn dadlau y dylai unrhyw ddatblygiad ym Mhorth-y-rhyd fod yn gydnaws a chymeriad y pentref ac wedi’i godi ar safle sy’n addas.

Cyflwynir tri gwrthwynebiad am y newidiadau ym Mhorth-y-rhyd. Mae’r gwrthwynebiad hwn yn ymwneud a safle Wernffraith (SC33/h3) lle mae pryderon am gynlluniau datblygwyr i'r safle godi 42 o anheddau.
___
MAP is fully aware of the need for development to keep villages alive and viable and create affordable homes and decent rental accommodation for local people. However, MAP is also committed to consider the impact of any proposed developments in Porth-y-rhyd and to ensure that any kind of development is in character with the village and is built on a site where there are no issues.
Three objections are submitted for the changes in Porthyrhyd. This objection relates to the Wernffraith site (SC33/h3) where there are concerns about developers plans for the site to build 42 dwellings.

Attachments:


Our response:

Support is welcomed.

Object

Second Deposit LDP

SD1: Development Limits

Representation ID: 5289

Received: 13/04/2023

Respondent ID: 619

Respondent: Mudiad Amddiffyn Porthyrhyd

Legally compliant? Not specified

Sound? Not specified

Representation Summary:

Mae MAP yn ymwybodol iawn bod angen datblygu er mwyn cadw pentrefi’n fyw yn ogystal a diwallu’r angen yn lleol am gartrefi fforddiadwy a chartrefi o safon I’w rhentu. Ond mae MAP yn pryderu hefyd am yr ardrawiadau a ddaw yn sgil rhai datblygiadau ac yn dadlau y dylai unrhyw ddatblygiad ym Mhorth-y-rhyd fod yn gydnaws a chymeriad y pentref ac wedi’I godi ar safle sy’n addas.

Cyflwynir tri gwrthwynebiad am y newidiadau ym Mhorth-y-rhyd. Mae'r gwrthwynebiad hwn yn ymwneud â'r newid y ffin o flaen Tŷ Cynheidre. Mae pryder yn ymwneud â'r ffaith nad oes unrhyw wybodaeth ar gael am y math o ddatblygiad a gynigiwyd a phryder bod piblinell ar y safle.

Cyfeirnod safle AS2/139/002
___
MAP is fully aware of the need for development to keep villages alive and viable and create affordable homes and decent rental accommodation for local people. However, MAP is also committed to consider the impact of any proposed developments in Porth-y-rhyd and to ensure that any kind of development is in character with the village and is built on a site where there are no issues.
Three objections are submitted for the changes in Porthyrhyd. This objection relates to the change of boundary to include land near Ty Cynheidre. Concern relates to the fact there is no information available on the type of development proposed and concern that there is a pipeline on the site.

Site ref. AS2/139/002

Attachments:


Our response:

Mae'r safle wedi'i gynnwys o fewn terfynau datblygu er mwyn caniatáu ar gyfer y potensial ar gyfer datblygiadau ar raddfa fach. Byddai unrhyw gynigion gan gynnwys eu maint a'u dyluniad yn fater i'w ystyried yn llawn yn y cam cais cynllunio

The site has been included within development limits to allow for the potential to accommodate small scale development. Any proposals including its scale and design would be a matter to be fully considered at a planning application stage

For instructions on how to use the system and make comments, please see our help guide.