Second Deposit LDP

Search representations

Results for Dwr Cymru/Welsh Water search

New search New search

Support

Second Deposit LDP

INF4: Llanelli Wastewater Treatment Works Catchment Surface Water Removal

Representation ID: 5597

Received: 23/05/2023

Respondent ID: 5826

Respondent: Dwr Cymru/Welsh Water

Representation Summary:

INF4: Llanelli Wastewater Treatment Surface Water Disposal We are supportive of the provisions of this policy and the supporting text; moreover, we are pleased to note that the matter has been given its own specific policy. We have also prepared a consultation response to the Burry Inlet SPG which provides further detail on this matter.

Attachments:


Our response:

Support welcomed

Support

Second Deposit LDP

Strategic Policy – SP 12: Placemaking and Sustainable Places

Representation ID: 5598

Received: 23/05/2023

Respondent ID: 5826

Respondent: Dwr Cymru/Welsh Water

Representation Summary:

SP12: Placemaking and Sustainable Places We specifically welcome the inclusion of criteria k) in Policy SP12. Disposing of surface water in a sustainable manner ensures that it will not communicate with the public sewerage network, which protects the environment and ensures that there is sufficient capacity in the public sewerage network for foul-only flows from development sites.

Attachments:


Our response:

Comments welcomed

Support

Second Deposit LDP

11.273

Representation ID: 5599

Received: 23/05/2023

Respondent ID: 5826

Respondent: Dwr Cymru/Welsh Water

Representation Summary:

On the theme of SuDS, we welcome the inclusion of the supporting text at paragraphs 11.273 to 11.275 regarding the recently established SuDS Approval Boards (SABs).

Attachments:


Our response:

Support welcomed.

Support

Second Deposit LDP

11.273

Representation ID: 5600

Received: 23/05/2023

Respondent ID: 5826

Respondent: Dwr Cymru/Welsh Water

Representation Summary:

On the theme of SuDS, we welcome the inclusion of the supporting text at paragraphs 11.273 to 11.275 regarding the recently established SuDS Approval Boards (SABs).

Attachments:


Our response:

Support welcomed.

Support

Second Deposit LDP

PSD3: Green and Blue Infrastructure Network

Representation ID: 5601

Received: 23/05/2023

Respondent ID: 5826

Respondent: Dwr Cymru/Welsh Water

Representation Summary:

PSD3: Green Infrastructure Network We welcome the provisions of this policy and the supporting text. The integration of SuDS as a Green Infrastructure asset is something that we are particularly supportive of.

Attachments:


Our response:

Support welcomed

Support

Second Deposit LDP

Strategic Policy – SP 16: Climate Change

Representation ID: 5602

Received: 23/05/2023

Respondent ID: 5826

Respondent: Dwr Cymru/Welsh Water

Representation Summary:

SP16: Climate Change We are supportive of the inclusion of SuDS in new development and as such welcome the provisions of criterion b) of this policy.

Attachments:


Our response:

Support welcomed

Support

Second Deposit LDP

11.510

Representation ID: 5603

Received: 23/05/2023

Respondent ID: 5826

Respondent: Dwr Cymru/Welsh Water

Representation Summary:

CCH4: Water Quality and Protection of Water Resources we welcome the requirement in supporting paragraph 11.510 that the necessary infrastructure needs to be in place or will be provided to serve development however we would highlight that in cases where there are no plans in place for infrastructure improvements in our AMP investment programme, developers can pay for the necessary infrastructure themselves through the requisition provisions of the Water Industry Act (WIA) 1991 or via Planning Obligations Agreements under the TCPA 1990. It should be noted that the requisition provision of the WIA 1991 only applies to sewerage network reinforcement works, not to WwTW schemes. Funding to deliver reinforcement works at a WwTW can be delivered via Section 106 of the Town and Country Planning Act 1990.

In relation to improving water quality, we are investing an additional £60m specifically to reduce phosphate in the five failing Special Area of Conservation (SAC) rivers in our operating area. This includes schemes at Lampeter and Llanybydder WwTWs that are due for completion by March 2025. In the next investment period 2025 to 2030 (AMP8) we will target investment with the ambition that none of our WwTWs are the cause of ecological failure. Through our phosphorus investment plan, we will have removed 90% of the phosphorus load from our WwTWs discharging to failing SAC rivers, playing our part in allowing these special rivers to meet their water quality targets and to relieve pressure on development restrictions. We expect to complete this programme of work by 2032. Whilst our investment will remove a significant amount of phosphorus from our sewage, in most cases it will not result in SACs complying with the water quality targets on its own. This is not something that Welsh Water can do on its own and it will take the combined efforts of all the contributing sectors to achieve this.

We will be engaging with our regulators and local planning authorities through the Tywi and Teifi Nutrient Management Boards (NMB) which can provide the governance, strategic direction and local intelligence/decision making needed if we are to be successful in relieving the pressure on planning restrictions and restoring river quality.

Attachments:


Our response:

Comments welcomed

Support

Second Deposit LDP

11.516

Representation ID: 5604

Received: 23/05/2023

Respondent ID: 5826

Respondent: Dwr Cymru/Welsh Water

Representation Summary:

With regard to supporting text in paragraph 11.516, there are several locations within the County where we abstract water that is treated prior to entering the public water supply network. As such, we fully support the provisions in the supporting text of this policy in preventing the degradation of water resources.

Attachments:


Our response:

Support welcomed.

Support

Second Deposit LDP

TRA1: Transport and Highways Infrastructural Improvements

Representation ID: 5605

Received: 23/05/2023

Respondent ID: 5826

Respondent: Dwr Cymru/Welsh Water

Representation Summary:

TRA1: Transport and Highways Infrastructure Improvements There may be locations where proposed developments / routes pass over public sewers and water mains. Under the Water Industry Act 1991 we have rights to always access our apparatus and protection measures in respect of these assets will be required either in the form of an easement width or a possible diversion of the asset. We welcome early engagement once further detail is available.

Attachments:


Our response:

Comments noted.

Support

Second Deposit LDP

MR1: Mineral Proposals

Representation ID: 5606

Received: 23/05/2023

Respondent ID: 5826

Respondent: Dwr Cymru/Welsh Water

Representation Summary:

MR1: Minerals Proposals We welcome the inclusion of criterion e) and k) of this policy.

Attachments:


Our response:

Support welcomed

For instructions on how to use the system and make comments, please see our help guide.