Safleoedd Ymgeisio a Gyflwynwyd / Candidate Site Submissions

Representation ID: 2171

Received: 07/02/2019

Respondent: Jaimie Daniel White

Representation Summary:

1. Loss of hedges, trees, natural habitat for wildlife.
2. Highway safety, inadequate parking & access.
3. Access road unsuitable.
4. Ground stability & drainage.
5. Large, heavy vehicles.
6. Traffic flow.
7. Entrance visibility.
8. Overlooking/loss of privacy.

Object

Safleoedd Ymgeisio a Gyflwynwyd / Candidate Site Submissions

Representation ID: 2396

Received: 11/02/2019

Respondent: Mr & Mrs J & L.A Cairns

Representation Summary:

We and others are very concerned about traffic congestion. The situation is bad enough now, this building would in our opinion put lives at risk.

Object

Safleoedd Ymgeisio a Gyflwynwyd / Candidate Site Submissions

Representation ID: 2617

Received: 07/02/2019

Respondent: D R Busst

Representation Summary:

1. Increasing risk of flooding to existing properties from run off from the proposed site.
2. Access on to main road would be totally foolhardy. There are cars parked all along the main road opposite entrances to site. Also a bend in the road a short distance away which makes the entry a blind spot.
3. There is also a public right way.
4. Loss of habitat for wild life and founa.

Object

Safleoedd Ymgeisio a Gyflwynwyd / Candidate Site Submissions

Representation ID: 2619

Received: 07/02/2019

Respondent: Mrs Hilda Gront

Representation Summary:

I was told when I purchased the property by the owners of the property and field site that the land would never be used for building on as it was unsuitable.

Object

Safleoedd Ymgeisio a Gyflwynwyd / Candidate Site Submissions

Representation ID: 2623

Received: 07/02/2019

Respondent: M E David

Representation Summary:

1. We had/have to put up with flooding from Summer Way which is the B.O.A.T on the proposed site, if building is allowed it will worsen.
2. Traffic on Water Street is fast particularly coming around the bend to the Summer Way exit. People who live there have (4 Cars) find it dangerous. This area is already an accident waiting to happen.

Object

Safleoedd Ymgeisio a Gyflwynwyd / Candidate Site Submissions

Representation ID: 2632

Received: 07/02/2019

Respondent: Jaimie Daniel White

Representation Summary:

Loss of Hedges, Trees natural habitat for wildlife
Highway safety, inadequate parking and access
Access road unsuitable
Ground stability and drainage
Large, heavy vehicles
Traffic Flow
Entrance visibility
Overlooking/loss of privacy

Object

Safleoedd Ymgeisio a Gyflwynwyd / Candidate Site Submissions

Representation ID: 2674

Received: 07/02/2019

Respondent: Brenda Evans

Representation Summary:

I am concerned that the access to the main road is going to be dangerous with traffic from 11 new residences.

There is likely to be adverse impact on the public footpath that runs alongside the proposed site.

Likely to be problems with water/flooding of houses further down.

Object

Safleoedd Ymgeisio a Gyflwynwyd / Candidate Site Submissions

Representation ID: 2677

Received: 07/02/2019

Respondent: Mrs D P McRim

Representation Summary:

Increase of traffic on already busy road which traffic calming has had effect. The restricted access to the site, already makes it difficult to pull out onto the main road, onto the bend.