SR/069/013

Showing comments and forms 1 to 30 of 40

Object

Safleoedd Ymgeisio a Gyflwynwyd / Candidate Site Submissions

Representation ID: 172

Received: 25/01/2019

Respondent: Mr Michael Davies

Representation Summary:

I live at 28 FForest Road have done for some 25years. In that time I have witnessed a large increase in traffic flow down to the Black Horse, as well as the traffic from Hendy and Pontardulais
At 7 30am up until 9am the traffic with its inherenttraffic pollution has prompted me to vary my walking time ,similarly in the evening..I have also concidered wearing a face mask akin to Peking residents.Where are the plans for upgrading the roads, Surgeries, Schools Sewers,Land drainage,access etc.With all the other application at present, I fear for our well being.
Carbon free no chance.

Object

Safleoedd Ymgeisio a Gyflwynwyd / Candidate Site Submissions

Representation ID: 178

Received: 25/01/2019

Respondent: Mr Michael Davies

Representation Summary:

I live at 28 FForest Road have done for some 25years. In that time I have witnessed a large increase in traffic flow down to the Black Horse, as well as the traffic from Hendy and Pontardulais
At 7 30am up until 9am the traffic with its inherenttraffic pollution has prompted me to vary my walking time ,similarly in the evening..I have also concidered wearing a face mask akin to Peking residents.Where are the plans for upgrading the roads, Surgeries, Schools Sewers,Land drainage,access etc.With all the other application at present, I fear for our well being.
Carbon free no chance.

Object

Safleoedd Ymgeisio a Gyflwynwyd / Candidate Site Submissions

Representation ID: 237

Received: 29/01/2019

Respondent: Mrs Alana Evans

Representation Summary:

Schools and doctors surgeries are over croweded. Green space is being destroyed. Traffic issue are increasing through hendy fforest and pontardulais.

Object

Safleoedd Ymgeisio a Gyflwynwyd / Candidate Site Submissions

Representation ID: 432

Received: 03/02/2019

Respondent: Mr Alan Austin

Representation Summary:

I am objecting to the Land Development Plan SR/069/013 for a number of crucial reasons.
There appears to be no resources allocated to ensure that the extra pressure on roads, school capacity, surgery places or building on land that already has been designated as prone to flooding has not been addressed.
The two roads which will have to cope with the massive increase in traffic are totally inadequate, one a single track (3.01m wide) up Bronallt Road and the A48 is also effectively single lane, due to cars parking on both sides of the road.
No consideration for residents.

Object

Safleoedd Ymgeisio a Gyflwynwyd / Candidate Site Submissions

Representation ID: 490

Received: 04/02/2019

Respondent: Mr Mike Pugh

Representation Summary:

Summary
These candidate sites do not comply with the following
Strategic Policy - SP 19: Waste Management
Strategic Policy - SP 8: Infrastructure
Strategic Policy - SP 17: Transport and Accessibility
Strategic Policy - SP 15: Climate Change
increased pressure on the River Loughor as per TAN 15 quoted below.
Strategic Policy - SP 11: Placemaking, Sustainability and High Quality Design.
* Development in these areas would be in an SLA ,special landscape Area,and as such does not sit well in the existing,natural and local Character of the area and does not enhance biodiversity .

Object

Safleoedd Ymgeisio a Gyflwynwyd / Candidate Site Submissions

Representation ID: 508

Received: 04/02/2019

Respondent: Mrs Hilary Pugh

Representation Summary:

based on the following strategic policies
Strategic Policy - SP 6: Employment and the Economy
Strategic Policy - SP 8: Infrastructure
Development will need to be directed to locations where the infrastructure, services and facilities considered necessary to deliver and support the development proposal are available. current Infrastructure at these sites is not available or sustainable
- SP 12: Rural development
As per SP 13 this development would not enhance this SLA , and would certainly have an adverse effect on the biodiversity of the river . This objection would also apply to SP14 especially regarding landscape and conservation areas

Support

Safleoedd Ymgeisio a Gyflwynwyd / Candidate Site Submissions

Representation ID: 515

Received: 04/02/2019

Respondent: Mr Lee John

Representation Summary:

Land Submission - Plas Y FForest SR069011, SR069012, and SR069013.

Please see attached document

Object

Safleoedd Ymgeisio a Gyflwynwyd / Candidate Site Submissions

Representation ID: 516

Received: 04/02/2019

Respondent: Mr Lee John

Representation Summary:

Land Submission - Plas Y FForest SR069011, SR069012, and SR069013.

Please see attached document

Object

Safleoedd Ymgeisio a Gyflwynwyd / Candidate Site Submissions

Representation ID: 526

Received: 04/02/2019

Respondent: Mr Huw Williams

Representation Summary:

Astounded that the county are planning more houses in this area when infrastructure such as road networks (Such as traffic through Bont or to link to M4 at J48) already at over full capacity, Doctors surgery full. Llangennech surgery reducing in size. What about Schools, playing fields etc. Totally opposed and shocked that the infrastructure doesn't get built first. Proposals will reduce quality of life for all current residents in this area. People live in West Wales for quality of life. This is going to Suburbanise the area as part of Swansea.

Object

Safleoedd Ymgeisio a Gyflwynwyd / Candidate Site Submissions

Representation ID: 600

Received: 04/02/2019

Respondent: MR Michael Clement

Representation Summary:

Further development in the Pontardulais/Hendy/Fforest area will have a significant effect on the infrastructure, services (surgey, school, etc.) and road access to J48 of the M4. Hendy primary school has not increased in size since I attended nearly 50 years ago. It is already diffiult to get appointments at Pontardulais surgery and traffic is already conjested at J48 of the M4 with poor layout at this junction causing tailbacks joining the M4 from either Hendy or Llanelli. Tailbacks already stretch back onto the motorway on exiting the M4 from the east during evening rush hour..

Object

Safleoedd Ymgeisio a Gyflwynwyd / Candidate Site Submissions

Representation ID: 786

Received: 06/02/2019

Respondent: Mr Martin James

Representation Summary:

This LDP will affect both the animal and human ecological system by destroying the natural habitat of the birds, bats, bees etc and by increasing the pressure on the health service (surgeries, dentist etc), schools, play-areas, increasing the traffic on an already over capacity road and M4 junction (48). The potential risk of accidents/deaths will increase.
There will be a massive effect on the community of the area and a potentially negative affect on the Welsh language. The natural drainage of water to the river will undoubtedly be affected and the sewerage system which is to capacity will need upgrading.

Object

Safleoedd Ymgeisio a Gyflwynwyd / Candidate Site Submissions

Representation ID: 853

Received: 06/02/2019

Respondent: Mr Alwyn Roberts

Representation Summary:

For details of my objection to the planned development, see full text submitted.

Comment

Safleoedd Ymgeisio a Gyflwynwyd / Candidate Site Submissions

Representation ID: 862

Received: 06/02/2019

Respondent: Mr Paul Coleman

Representation Summary:

I have two main areas of comment:
Infrastructure and Traffic.
Any future development in this area MUST be accompanied by a proportional increase in school places and doctors surgery places. sewerage and water supply.
Bronallt Road is already being used as a short cut between the motorway at J48 and Fforest, Llanedi and Tycroes. This road already carries far too much traffic, often speeding - it was not intended to be used as a major thoroughfare or trunk road. The junction of Bronallt, Carmarthen and Fforest Roads is already dangerous - increased traffic can only make it worse.
Plan responsibly!

Object

Safleoedd Ymgeisio a Gyflwynwyd / Candidate Site Submissions

Representation ID: 991

Received: 07/02/2019

Respondent: Aled Francis

Representation Summary:

Yr wyf yn gwrthwynebu ar sail y rhesymau canlynol:
1. Gor-ddatblygu'r ardal
2. Colli hunaniaeth y pentref oherwydd gor-ddatblygu dros gyfnod byr.
3. Effaith andwyol ar yr iaith Gymraeg - mae angen amddiffyn cymunedau gyda chanran uchel o siaradwyr Cymraeg rhag gor-ddatblygu a Seisnigo.
Tir anaddas - problemau draeniad
6. Isadeiledd annigonol i ymdopi â mwy o ddatblygiad
7. Trafnidiaeth - tagfeydd /peryglon ar groesffordd/ llygredd.
8. Mae angen gwarchod safle tir glas ar gyfer Cenedlaethau'r Dyfodol.

Object

Safleoedd Ymgeisio a Gyflwynwyd / Candidate Site Submissions

Representation ID: 992

Received: 07/02/2019

Respondent: Aled Francis

Representation Summary:

Yr wyf yn gwrthwynebu ar sail y rhesymau canlynol:
1. Gor-ddatblygu'r ardal
2. Colli hunaniaeth y pentref oherwydd gor-ddatblygu dros gyfnod byr.
3. Effaith andwyol ar yr iaith Gymraeg - mae angen amddiffyn cymunedau gyda chanran uchel o siaradwyr Cymraeg rhag gor-ddatblygu a Seisnigo.
Tir anaddas - problemau draeniad
6. Isadeiledd annigonol i ymdopi â mwy o ddatblygiad
7. Trafnidiaeth - tagfeydd /peryglon mynedfa ar groesffordd/ llygredd.
8. Mae angen gwarchod safle tir glas ar gyfer Cenedlaethau'r Dyfodol.

Object

Safleoedd Ymgeisio a Gyflwynwyd / Candidate Site Submissions

Representation ID: 1149

Received: 07/02/2019

Respondent: MR DAVID OWENS

Representation Summary:

Any residential development would:
Adversely affect the residential amenity of neighbouring owners
Cause the loss of a greenfield site
Cause the loss of wildlife habitat
Increase traffic, noise & pollution
Undermine local school and GP surgery resources

Object

Safleoedd Ymgeisio a Gyflwynwyd / Candidate Site Submissions

Representation ID: 1205

Received: 07/02/2019

Respondent: Mrs Selena Brenchley

Representation Summary:

Access to the site is narrow and would not sustain an increase in traffic. Accident records will indicate that there have been several accidents at the entrance of Plas-y-Fforest. Further development will intensify the use of this access and increase risk of accidents.
Proposed site is greenfield site and building here would have huge implications on the impact of biodiversity of the flora and fauna in the area.
Surface water run off would increase risk of flooding to neighbouring properties.
Development will adversely affect privacy to neighbouring properties.
Increased population have huge impact on GP and schools.

Object

Safleoedd Ymgeisio a Gyflwynwyd / Candidate Site Submissions

Representation ID: 1283

Received: 07/02/2019

Respondent: Andrew Chalkley

Representation Summary:

I wish to protect the greenfield site for future generations. The reason
being that it is a Special Landscape Area. In addition any development on
this land would contravene EQ6, TAN15, SP12,SP13, SP15, SP17 and PPW para
9.1.2. Developing the land would also go against the Wellbeing Act.

Object

Safleoedd Ymgeisio a Gyflwynwyd / Candidate Site Submissions

Representation ID: 1377

Received: 08/02/2019

Respondent: mr neil chambers

Representation Summary:

I object strongly to this candidate site on following grounds
There has been overdevelopment in the area in recent years.
Access to the site is poor / steep and will not be feasible for pedestrians.
Ecology there are many mature trees and old buildings which will be a loss of habitat for native species and potentially protected species - bats.
Will result in loss of privacy and loss of amenity to the neighbouring properties.
Not a strategic site and there are far better candidate sites with better access and nearer amenities.
Loss of the farm as an entity / business.

Object

Safleoedd Ymgeisio a Gyflwynwyd / Candidate Site Submissions

Representation ID: 1378

Received: 08/02/2019

Respondent: Llanedi Community Council

Representation Summary:

Following public consultation , a meeting of Llanedi Community Council on the 6th February 2018 agreed that we wish to object to all future large scale (5 plus houses) proposals for residential development in Hendy and Forest. Significant development has already taken place in recent years in the area. We are also concerned about the impact of future developments in Pontarddulais on our community.
Our specific objection to this candidate site includes concerns over:
* increased traffic
* access
* sewerage/drainage/flooding
* pressure on services/utilities (e.g. doctors'/schools)
* tree preservation
* dilution of character/culture of the village/ Welsh language.

Object

Safleoedd Ymgeisio a Gyflwynwyd / Candidate Site Submissions

Representation ID: 1513

Received: 08/02/2019

Respondent: Mr Spencer Green

Representation Summary:

I wish to protect the greenfield site for future generations as it is a Special Landscape Area. Any development on this land would contravene EQ6, TAN15, SP12, SP13, SP15, SP17 and PPW para 9.1.2, and would also go against he Wellbeing Act. Also, Fforest cannot cope with any more development due to lack of infrastructure, increasing road and motorway congestion, increasing pollution, and the detrimental effect on existing property prices that would occur on houses near these green areas. There are also rare birds of prey and wildlife habitats which must not be disturbed. Please respect our beautiful village.

Object

Safleoedd Ymgeisio a Gyflwynwyd / Candidate Site Submissions

Representation ID: 1526

Received: 08/02/2019

Respondent: Mr Garry Mills

Representation Summary:

I wish to protect the greenfield site for future generations as it is a Special Landscape Area. Any development on this land would contravene EQ6, TAN15, SP12, SP13, SP15, SP17 and PPW para 9.1.2, and would also go against he Wellbeing Act. Also, Fforest cannot cope with any more development due to lack of infrastructure, increasing road and motorway congestion, increasing pollution, and the detrimental effect on existing property prices that would occur on houses near these green areas. There are also rare birds of prey and wildlife habitats which must not be disturbed. Please respect our beautiful village.

Object

Safleoedd Ymgeisio a Gyflwynwyd / Candidate Site Submissions

Representation ID: 1728

Received: 04/02/2019

Respondent: Julian & Susan Quirk

Number of people: 2

Representation Summary:

The respondent objects to the above site for the following reasons:

- greenfield site, outside current development limits, unsustainable;
- it is located on a mineral safeguarding area;
- reasons concerning highway safety and access;
- existing sewers are at capacity;
- gradient - the land is too steep;
- adverse amenity on existing dwellings;
- impact on existing facilities.

Object

Safleoedd Ymgeisio a Gyflwynwyd / Candidate Site Submissions

Representation ID: 1738

Received: 03/02/2019

Respondent: Ian & Donna Taylor

Representation Summary:

The respondent objects to the above site for the following reasons:

- greenfield site, outside current development limits, unsustainable;
- it is located on a mineral safeguarding area;
- reasons concerning highway safety and access;
- existing sewers are at capacity;
- gradient - the land is too steep;
- adverse amenity on existing dwellings;
- impact on existing facilities.

Object

Safleoedd Ymgeisio a Gyflwynwyd / Candidate Site Submissions

Representation ID: 1808

Received: 05/02/2019

Respondent: Mr Scott Brown

Representation Summary:

Object to the inclusion of the site. Authorities should consider previously developed land and underutilised sites within exiting settlements in the first instance.

The four sites proposed at Plas-y-Fforest are not previously developed land (brownfield). The farmyard cannot even be considered as brownfield as PPWs definition clearly excludes 'land and buildings currently in use for agricultural or forestry purposes'. The four sites proposed at Plas-y-Fforest are also not within the existing settlement boundary.

Further objections include the site being in an unsustainable location, no employment sites or facilities and shops within reasonable walking distance.

Highway safety and access. Accident records will indicate that there have been several accidents at the entrance of Plas-y-Fforest. Further development will intensify the use of this access and thus increasing the risk of a dangerous accident.

In addition, the proposed sites are not suitable as they are safeguarded for potential mineral extraction in accordance with Policy MPP3 of the current Carmarthenshire LDP. SR/069/013 is on land safeguarded for category 1 high specification aggregate sandstone and igneous rock.


Sewers and pumping station - It is understood these are at capacity. The cost to the developer to increase the capacity of the sewer and pumping system could potentially make the development unviable and undeliverable. It would certainly reduce the contributions the development could make to education and affordable housing.

Gradient - The land is steep. The gradient would increase the build costs of the development and affect viability and deliverability.

Adverse impact on the amenity of existing dwelling and impact on existing local facilities.

Object

Safleoedd Ymgeisio a Gyflwynwyd / Candidate Site Submissions

Representation ID: 1890

Received: 07/02/2019

Respondent: Mr Wynne Williams

Representation Summary:

Object to the inclusion of the site. Authorities should consider previously developed land and underutilised sites within exiting settlements in the first instance.

The four sites proposed at Plas-y-Fforest are not previously developed land (brownfield). The farmyard cannot even be considered as brownfield as PPWs definition clearly excludes 'land and buildings currently in use for agricultural or forestry purposes'. The four sites proposed at Plas-y-Fforest are also not within the existing settlement boundary.

Further objections include the site being in an unsustainable location, no employment sites or facilities and shops within reasonable walking distance.

Highway safety and access. Accident records will indicate that there have been several accidents at the entrance of Plas-y-Fforest. Further development will intensify the use of this access and thus increasing the risk of a dangerous accident.

In addition, the proposed sites are not suitable as they are safeguarded for potential mineral extraction in accordance with Policy MPP3 of the current Carmarthenshire LDP. SR/069/13 is on land safeguarded for Category 1 high specification aggregate sandstone and igneous rock.
Sewers and pumping station - It is understood these are at capacity. The cost to the developer to increase the capacity of the sewer and pumping system could potentially make the development unviable and undeliverable. It would certainly reduce the contributions the development could make to education and affordable housing.

Gradient - The land is steep. The gradient would increase the build costs of the development and affect viability and deliverability.

Adverse impact on the amenity of existing dwelling and impact on existing local facilities.

Object

Safleoedd Ymgeisio a Gyflwynwyd / Candidate Site Submissions

Representation ID: 1933

Received: 04/02/2019

Respondent: NG Fraser-Pearson

Representation Summary:

- over development
- access too narrow for 5.5m road & footpaths/vision splays needed for access to SR/069/011 & SR/069/012;
- extra load on drainage & utility services;
- over development;
- extra load/demand on Doctors etc & School;
- increased traffic through Fforest/Hendy & at J48 M4;
- delete SR/069/013 from LDP.

Object

Safleoedd Ymgeisio a Gyflwynwyd / Candidate Site Submissions

Representation ID: 2032

Received: 07/02/2019

Respondent: Clive, Helen and Matthew Edwards

Representation Summary:

I refer to the above and wish to register an objection for the following reasons:
The site is in contravention of the guidelines contained in the "Planning Policy Wales " document which governs such applications.
With increased traffic associated with new housing there would be a detrimental impact on road safety.
The sewer system at Plas Y Fforest is operating at capacity and the pumping station could not cope.

Object

Safleoedd Ymgeisio a Gyflwynwyd / Candidate Site Submissions

Representation ID: 2036

Received: 07/02/2019

Respondent: Alan Strawbridge

Representation Summary:

I wish to register my objections to the designation of the above plots as being suitable for housing development for the following reasons.

1. All these plots are green field plots - I would expect the LA to exhaust the available brown field sites before turning to farm land

2. All these plots are adjacent to, or feed into difficult and busy junctions, raising safety concerns for road traffic and pedestrians. The turning into Plas y Fforest is already dangerous with fast traffic towards the M4 overtaking vehicles slowing down to turn right.

3. There is already considerable rush hour traffic congestion at the Pont Abram roundabout and at the mini roundabout at the Black Horse. The proposed delopments would add to this congestion since these are the only main routes out of the area. Pont Abram would be a particular concern. At peak times it is already very dangerous. You have to accelerate at maximum speed to pull out into a gap in fast moving traffic and then immediately brake hard at the lights while cars coming around the roundabout towards Swansea are still accelerating and attempting to cut across.

4. You will be aware that there have been significant problems with the sewers serving Plas Y Fforest. Additional housing would be likely to exacerbate these problems.

5. There are no amenities in this area except for the post office and the pavements are limited. All the sites are on, or at the top of a steep hill. Consequently residents in these developments would use cars for most trips. There is no Doctors surgery in the area (there is one on the Swansea side though this is already at capacity)

6. The land is steep with underlying rock. Any development would increase the rate of surface water run off, which already streams down from the farm during heavy rain.

7. One effect of the proposed developments would be to turn the quiet cul de sac of Plas y Fforest into a main thoroughfare. You will be aware that the road is congested and is already showing significant signs of settlement. The development sites are located on popular footpaths through the farm onto the hill and through the woodland next to Llanedi Road and would reduce the opportunity for walking in the area.

8. Pontarddulais and Fforest/Hendy have grown significantly over the last 10 years. Unfortunately, neither Carmarthen nor Swansea LAs have improved the infrastructure or amenities. There is very little on the Carmarthenshire side.

Object

Safleoedd Ymgeisio a Gyflwynwyd / Candidate Site Submissions

Representation ID: 2049

Received: 06/02/2019

Respondent: Phillip Davies

Representation Summary:

It is stated that alongside SR/069/011 this is an extension of SR/069/012 and presumably would be intended to be part of a development that would comprise all three sites. The respondent states that there does not appear to be any suitable access point and that all three sites are significantly higher than the existing adjacent residential developments below them, which gives rise to concerns about changes to ground drainage if they are built upon. Furthermore, the respondent states that as the land has been built up in recent years to enlarge the level area of the existing farm yard, there is concern about its stability, particularly in the case of this site, whence a landslide into neighbouring gardens occurred a few years ago.