Object
Safleoedd Ymgeisio a Gyflwynwyd / Candidate Site Submissions
Representation ID: 962
Received: 06/02/2019
Respondent: Mr Jonathan Rose
Representation Summary:
Bynea needs more investment in infrastructure before any further developments take place.
This area, in particular, being developed, will have massive reprocussions further down the line, including the requirement for new primary & secondary schools or large extensions of the existing.
surface water flooding will insue for existing residents.
Mine shafts are networked through the area & have yet to be accurately mapped.
Water pressure issues.
Road safety due to single file traffic & HGVs.
Loss of an area of outstanding beauty including a 250yr old oak tree.
Broadband/fibre/electricity/water supplies already fed through a bottleneck