Object

Safleoedd Ymgeisio a Gyflwynwyd / Candidate Site Submissions

Representation ID: 878

Received: 06/02/2019

Respondent: Mr David Ball

Representation Summary:

SR/086/014 - Increase in traffic to and from, often, single file traffic through Llangennech. Another T junction in to the main road - there are already several quite close together and at times it is virtually impossible to join the main road and turning across the line of traffic impossible. There will be issues with sewage. Where will the extra children go to school? The increase in traffic will add to pollution on a road that has three schools. Cycle tracks introduced along the road with an abundance of speed bumps means traffic has meant that traffic speeds vary.