Object

Safleoedd Ymgeisio a Gyflwynwyd / Candidate Site Submissions

Representation ID: 524

Received: 04/02/2019

Respondent: Mr Huw Williams

Representation Summary:

Astounded that the county are planning more houses in this area when infrastructure such as road networks (Such as traffic through Bont or to link to M4 at J48) already at over full capacity, Doctors surgery full. Llangennech surgery reducing in size. What about Schools, playing fields etc. Totally opposed and shocked that the infrastructure doesn't get built first. Proposals will reduce quality of life for all current residents in this area. People live in West Wales for quality of life. This is going to Suburbanise the area as part of Swansea.