Ail Gynllun Datblygu Lleol Adneuo Diwygiedig Sir Gaerfyrddin

Chwilio sylwadau

Canlyniadau chwilio Ffos Las Ltd

Chwilio o’r newydd Chwilio o’r newydd

Gwrthwynebu

Ail Gynllun Datblygu Lleol Adneuo Diwygiedig Sir Gaerfyrddin

HOM1: Dyraniadau Tai

ID sylw: 5820

Derbyniwyd: 14/04/2023

Respondent ID: 3885

Ymatebydd: Ffos Las Ltd

Asiant : Carney Sweeney

Cydymffurfio â’r gyfraith? Heb nodi

Cadarn? Nac Ydi

Crynodeb o'r Gynrychiolaeth:

In summary, the candidate site (ref: SR/023/003) comprises c. 5.3ha of land which is bound by existing residential development to the north, comprising the built settlement of Carway, and to the south by the Persimmon housing development at Ffos Las racecourse. The site’s location is considered highly sustainable, given its immediate proximity to Carway, Ffos Las racecourse and Trimsaran, and associated facilities. The allocation and subsequent ongoing delivery for housing of the adjacent
Persimmon sites also establishes the sustainability of this location to accommodate new housing. The site is free from physical constraints, being relatively flat with no existing buildings. The site is not located within any heritage, ecological or nature conservation designations and lies within Flood Zone A. The site can be readily accessed from the existing B4327 Culla Road Roundabout, with a secondary access point available at Heol Dyffryn Aur to the south.
As outlined above the site is immediately deliverable and as previously concluded by officers there are no adverse impacts to the development of this site.

Atodiadau:


Ein hymateb:

The sites have been duly considered in the formulation and preparation of the LDP with the reasons for their non-inclusion set out within the Site Assessment Table. The representations raise no additional points which justify inclusion of the suggested sites. The assessment of sites was undertaken in accordance with national guidance and the site assessment methodology and background/topic papers and the supporting evidence.

Gwrthwynebu

Ail Gynllun Datblygu Lleol Adneuo Diwygiedig Sir Gaerfyrddin

Polisi Strategol – SP4: Dull Cynaliadwy o Ddarparu Cartrefi Newydd

ID sylw: 5821

Derbyniwyd: 14/04/2023

Respondent ID: 3885

Ymatebydd: Ffos Las Ltd

Asiant : Carney Sweeney

Cydymffurfio â’r gyfraith? Heb nodi

Cadarn? Nac Ydi

Crynodeb o'r Gynrychiolaeth:

Objection to SP4 - The proposed provision for 9,704 homes within the RLDP to meet an identified requirement for 8,822 homes at c.500 homes per year is considered insufficient and will compound longstanding undersupply. The County should be targeting an increase in annual build rates, in order to provide for the future population growth and meet local need;

Atodiadau:


Ein hymateb:

Disagree. The Population and Household Projection Topic Paper and the evidence contained within the Housing and Economic Growth sets out the informing considerations and the justification for the population and household projections for the County.

In assessing and identifying the housing requirement for the Plan and in accordance with Planning Policy Wales the WG-based local authority level projections were utilised as a starting point.

The Housing and Economic Growth Report sought to review and assess the appropriateness of the latest WG population
and household projections for Carmarthenshire and sought to also provide an alternative suite of demographic and trend-based evidence to consider.

The Council considers that an appropriate and deliverable housing requirement within the Deposit Revised LDP factors in the ability to meet the strategic objectives and policies of the Council, retains the young within the county, delivers for the needs of all our communities both urban and rural, and provides the opportunity for job creation, amongst others. The relationship between household growth and economic growth is further considered in the Growth and Spatial Distribution Part 2: Job creation and the economy.

Further consideration will be given at the examination of the Plan.

Gwrthwynebu

Ail Gynllun Datblygu Lleol Adneuo Diwygiedig Sir Gaerfyrddin

CCH4: Ansawdd Dŵr a Diogelu Adnoddau Dŵr

ID sylw: 5822

Derbyniwyd: 14/04/2023

Respondent ID: 3885

Ymatebydd: Ffos Las Ltd

Asiant : Carney Sweeney

Cydymffurfio â’r gyfraith? Heb nodi

Cadarn? Nac Ydi

Crynodeb o'r Gynrychiolaeth:

Based on current draft allocations the riverine SAC phosphate constraint will likely significantly constrain the delivery of housing across the County over the emerging plan period, particularly in Pencader and Llandovery. The Council’s previous conclusions on need should be thoroughly reassessed. The proposed site at land adjacent to Culla Road Roundabout (ref: SR/023/003)
is unconstrained and immediately deliverable.

Atodiadau:


Ein hymateb:

Disagree. The strategy of the revised LDP seeks to support the distribution of housing and economic growth which is of a scale and nature appropriate to its cluster and has taken into account SAC riverine phosphate constraints. In this respect the revised LDP seeks to ensure that development is appropriate to the settlement and reflective of its ability to accommodate growth and the services and facilities available.

Gwrthwynebu

Ail Gynllun Datblygu Lleol Adneuo Diwygiedig Sir Gaerfyrddin

SeC14/h2

ID sylw: 5823

Derbyniwyd: 14/04/2023

Respondent ID: 3885

Ymatebydd: Ffos Las Ltd

Asiant : Carney Sweeney

Cydymffurfio â’r gyfraith? Heb nodi

Cadarn? Nac Ydi

Crynodeb o'r Gynrychiolaeth:

The 2nd Deposit Plan’s evidence base includes a Nutrient Mitigation Options Technical Review report prepared by Ricardo (June 2022). The report notes that the Pencader Sewage Treatment Works and Llandovery Waste Water Treatment works have the highest number of planning applications constrained by phosphorus (page iv of the report). Therefore, it is apparent that future housing development in Pencader and Llandovery is particularly constrained by the need for nutrient neutrality.

There is now, in our view, significant doubts as to the deliverability of the housing site allocated SeC14/h2

Atodiadau:


Ein hymateb:

Disagree, the allocation of the site within the LDP for residential purposes has been subject to full consideration through the site assessment methodology. As part of this assessment process a detailed site pro forma has been prepared.

Gwrthwynebu

Ail Gynllun Datblygu Lleol Adneuo Diwygiedig Sir Gaerfyrddin

SeC14/h1

ID sylw: 5824

Derbyniwyd: 14/04/2023

Respondent ID: 3885

Ymatebydd: Ffos Las Ltd

Asiant : Carney Sweeney

Cydymffurfio â’r gyfraith? Heb nodi

Cadarn? Nac Ydi

Crynodeb o'r Gynrychiolaeth:

The 2nd Deposit Plan’s evidence base includes a Nutrient Mitigation Options Technical Review report prepared by Ricardo (June 2022). The report notes that the Pencader Sewage Treatment Works and Llandovery Waste Water Treatment works have the highest number of planning applications constrained by phosphorus (page iv of the report). Therefore, it is apparent that future housing development in Pencader and Llandovery is particularly constrained by the need for nutrient neutrality.

We question the deliverability of site allocation ref: SeC14/h2 Blossom Garage. This site has been subject to a recent planning application refusal (ref: W/39283). One of the principal reasons for refusal was the site being located within the catchment of Afon Tywi SAC and not demonstrating phosphate neutrality or betterment.

Atodiadau:


Ein hymateb:

Disagree, the allocation of the site within the LDP for residential purposes has been subject to full consideration through the site assessment methodology. As part of this assessment process a detailed site pro forma has been prepared.

Gwrthwynebu

Ail Gynllun Datblygu Lleol Adneuo Diwygiedig Sir Gaerfyrddin

SeC15/h1

ID sylw: 5825

Derbyniwyd: 14/04/2023

Respondent ID: 3885

Ymatebydd: Ffos Las Ltd

Asiant : Carney Sweeney

Cydymffurfio â’r gyfraith? Heb nodi

Cadarn? Nac Ydi

Crynodeb o'r Gynrychiolaeth:

We note allocation ref: SeC15/h1 in Llandovery listed above has been allocated for many years and
remains undeveloped. The LPA’s supporting Site Assessment Table (2023) indeed notes concerns over the deliverability of this site, and therefore reduces the size of the allocation within the 2nd Draft Deposit RLDP. The riverine SAC phosphates constraint makes this site even less deliverable.

Atodiadau:


Ein hymateb:

Disagree, the allocation of the site within the LDP for residential purposes has been subject to full consideration through the site assessment methodology. As part of this assessment process a detailed site pro forma has been prepared.

Gwrthwynebu

Ail Gynllun Datblygu Lleol Adneuo Diwygiedig Sir Gaerfyrddin

SeC15/h2

ID sylw: 5826

Derbyniwyd: 14/04/2023

Respondent ID: 3885

Ymatebydd: Ffos Las Ltd

Asiant : Carney Sweeney

Cydymffurfio â’r gyfraith? Heb nodi

Cadarn? Nac Ydi

Crynodeb o'r Gynrychiolaeth:

The 2nd Deposit Plan’s evidence base includes a Nutrient Mitigation Options Technical Review report prepared by Ricardo (June 2022). The report notes that the Pencader Sewage Treatment Works and Llandovery Waste Water Treatment works have the highest number of planning applications constrained by phosphorus (page iv of the report). Therefore, it is apparent that future housing development in Pencader and Llandovery is particularly constrained by the need for nutrient neutrality.

There is now, in our view, significant doubts as to the deliverability of the housing site allocated SeC15/h2

Atodiadau:


Ein hymateb:

Disagree, the allocation of the site within the LDP for residential purposes has been subject to full consideration through the site assessment methodology. As part of this assessment process a detailed site pro forma has been prepared.

Gwrthwynebu

Ail Gynllun Datblygu Lleol Adneuo Diwygiedig Sir Gaerfyrddin

SuV51/h1

ID sylw: 5827

Derbyniwyd: 14/04/2023

Respondent ID: 3885

Ymatebydd: Ffos Las Ltd

Asiant : Carney Sweeney

Cydymffurfio â’r gyfraith? Heb nodi

Cadarn? Nac Ydi

Crynodeb o'r Gynrychiolaeth:

Objection to housing allocation SuV51/h1 in Cwmifor.
Based on current draft allocations, the riverine SAC phosphate constraint will likely significantly
constrain the delivery of housing across the County over the emerging plan period,
The SAC phosphates constraint makes sites such as these less deliverable.
It is highly likely that proposed housing allocations in locations affected by riverine SACs phosphate
constraints will not be deliverable, either in part or in full.

Atodiadau:


Ein hymateb:

Disagree, the allocation of the site within the LDP for residential purposes has been subject to full consideration through the site assessment methodology. As part of this assessment process a detailed site pro forma has been prepared.

Gwrthwynebu

Ail Gynllun Datblygu Lleol Adneuo Diwygiedig Sir Gaerfyrddin

PrC2/h15

ID sylw: 5828

Derbyniwyd: 14/04/2023

Respondent ID: 3885

Ymatebydd: Ffos Las Ltd

Asiant : Carney Sweeney

Cydymffurfio â’r gyfraith? Heb nodi

Cadarn? Nac Ydi

Crynodeb o'r Gynrychiolaeth:

Notwithstanding sites affected by the SAC phosphates constraint, there are other sites throughout the County exhibiting deliverability issues. Similarly, we note the existing allocation PrC2/15 has been reduced in size due to concerns over deliverability:

Atodiadau:


Ein hymateb:

Disagree, the allocation of the site within the LDP for residential purposes has been subject to full consideration through the site assessment methodology. As part of this assessment process a detailed site pro forma has been prepared

Gwrthwynebu

Ail Gynllun Datblygu Lleol Adneuo Diwygiedig Sir Gaerfyrddin

PrC2/h28

ID sylw: 5829

Derbyniwyd: 14/04/2023

Respondent ID: 3885

Ymatebydd: Ffos Las Ltd

Asiant : Carney Sweeney

Cydymffurfio â’r gyfraith? Heb nodi

Cadarn? Nac Ydi

Crynodeb o'r Gynrychiolaeth:

Notwithstanding sites affected by the SAC phosphates constraint, there are other sites throughout the County exhibiting deliverability issues. Similarly, we note the existing allocation PrC2/h28 has been reduced in size due to concerns over deliverability:

Atodiadau:


Ein hymateb:

Disagree, the allocation of the site within the LDP for residential purposes has been subject to full consideration through the site assessment methodology. As part of this assessment process a detailed site pro forma has been prepared

Am gyfarwyddiadau ar sut i ddefnyddio’r system ac i wneud sylwadau, gwelwch ein canllaw cymorth.