Ail Gynllun Datblygu Lleol Adneuo Diwygiedig Sir Gaerfyrddin

Chwilio sylwadau

Canlyniadau chwilio Welsh Government

Chwilio o’r newydd Chwilio o’r newydd

Gwrthwynebu

Ail Gynllun Datblygu Lleol Adneuo Diwygiedig Sir Gaerfyrddin

CCH2: Ynni Adnewyddadwy y tu allan i Ardaloedd a Aseswyd o flaen llaw ac Ardaloedd Chwilio Lleol

ID sylw: 5562

Derbyniwyd: 12/04/2023

Ymatebydd: Welsh Government

Cydymffurfio â’r gyfraith? Heb nodi

Cadarn? Heb nodi

Crynodeb o'r Gynrychiolaeth:

Policy CCH2: - it is unclear how the plans policies for renewable energy projects and search areas (Policies CCH1 and CCH2) consider BMV policy and high carbon soils (e.g. Peatlands). This needs to be considered and evidenced together with all other allocations in terms of impacts on the BMV resource over the plan period and how PPW (paragraphs 3.58 and 3.59) is applied.
(Category C Objection)

Testun llawn:

Thank you for consulting the Welsh Government on the Carmarthenshire County Council Local Development Plan (LDP) 2nd Deposit plan and documents. It is essential the authority is covered by an up-to-date LDP to give certainty to local communities and business.
Without prejudice to the Minster’s powers, the Welsh Government is committed to helping Local Planning Authorities (LPAs) minimise the risk of submitting unsound plans by making comments at the earliest stages of plan preparation. The Welsh Government looks for clear evidence that the plan is in general conformity with Future Wales: The National Development Framework and aligns with Planning Policy Wales (PPW), and that the tests of soundness (as set out in the ‘LDP Manual’) are addressed.
National planning policies are set out in Planning Policy Wales (PPW) Edition 11, which seeks to deliver high quality, sustainable places through a place-making approach. The implementation of the core policy areas in PPW, such as adopting a sustainable spatial strategy, appropriate housing and economic growth levels, infrastructure delivery and place-making, are articulated in more detail in the LDP Manual (Edition 3). We expect the core elements of the Manual, in particular Chapter 5 and the ‘De-risking Checklist(s) to be followed. The development planning system in Wales is evidence led and demonstrating how a plan is shaped by the evidence is a key requirement of the LDP examination.
After considering the key issues and policies in Future Wales, the Welsh Government is of the view that the level and spatial distribution of growth is in general conformity with Future Wales: The National Development Framework. However, the Statement of General Conformity (Annex 1 to this letter) is a ‘caveated response’. Annex 2 of this letter raises fundamental inconsistencies regarding the total housing provision and until these matters have been addressed and their implications understood, it is not possible to give a firm view on matters of general conformity at this time. Annex 2 of this letter also highlights a range of issues that need to be addressed for the plan to align with PPW and DPM. Collectively, our comments highlight a range of issues that need to be addressed for the plan to be considered ‘sound’ as follows:
Annex 1 – General Conformity with Future Wales (Caveated Response)
· Regional Collaboration/Level of growth Further clarity required. Annex 2 – Core matters that need to be addressed (PPW and the DPM)
Our representations are separated into three categories set out by topic area, with further detail in the attached annex.
Category A: Fundamental issues that are considered to present a significant degree of risk for the LPA if not addressed prior to submission stage and may have implications for the plan’s strategy.
None.
Category B: Matters where it appears that the deposit plan has not satisfactorily translated national policy down to the local level and there may be tensions within the plan, namely (not exhaustive):
· Level of Housing Provision
· Delivery and Viability
· Restriction of new homes to Class C3 only
· Gypsy and Traveller Provision
· Best and Most Versatile Land (BMV)
Category C: Whilst not considered to be fundamental to the soundness of the LDP, we consider there to be a lack of certainty or clarity on the following matters:
· Flooding
· Renewable Energy
· Minerals
· Phosphates
I would urge you to seek your own legal advice to ensure you have met all the procedural requirements, including the Sustainability Appraisal (SA), Strategic Environmental Assessment (SEA) and Habitats Regulation Assessment (HRA), as responsibility for these matters rests with your authority. A requirement to undertake a Health Impact Assessment (HIA) arising from the Public Health (Wales) Act 2017, if appropriate, should be carried out to assess the likely effect of the proposed development plan on health, mental well-being and inequality.
It is for your Authority to ensure that the LDP is ‘sound’, and it will be for the Inspector to determine how the examination proceeds if you submit the plan without addressing the concerns we raise. My colleagues and I look forward to meeting you and the team to discuss matters arising from this response.

Atodiadau:


Ein hymateb:

The Council has undertaken further evidence in relation to Best and Most Versatile Agricultural Land. This evidence is provided in the form of a Topic Paper which assesses the Council's housing allocations against the considerations of BMV.

Gwrthwynebu

Ail Gynllun Datblygu Lleol Adneuo Diwygiedig Sir Gaerfyrddin

MR2: Clustogfeydd Mwynau

ID sylw: 5563

Derbyniwyd: 12/04/2023

Ymatebydd: Welsh Government

Cydymffurfio â’r gyfraith? Heb nodi

Cadarn? Heb nodi

Crynodeb o'r Gynrychiolaeth:

Minerals
Carmarthenshire is within the Swansea City Sub-Region of the South Wales RAWP area along with Swansea and Neath Port Talbot. The Regional Technical Statement 2 (RTS2) identifies an apportionment figure of 0.058 million tonnes of sand and gravel and 27.556 million tonnes of crushed rock. When comparing these figures with the existing landbank, there is a surplus of permitted reserves and as such, no requirement to identify allocations in the plan. However, the authority should:
• List in Policy MR2 all sites with extant planning permission for mineral workings and their associated buffer zones. This will add clarity to the plan and align with the requirements in PPW to outline the expectations of the authority in respect of existing and operational mineral sites (5.14.13).
(Category C Objection)

Testun llawn:

Thank you for consulting the Welsh Government on the Carmarthenshire County Council Local Development Plan (LDP) 2nd Deposit plan and documents. It is essential the authority is covered by an up-to-date LDP to give certainty to local communities and business.
Without prejudice to the Minster’s powers, the Welsh Government is committed to helping Local Planning Authorities (LPAs) minimise the risk of submitting unsound plans by making comments at the earliest stages of plan preparation. The Welsh Government looks for clear evidence that the plan is in general conformity with Future Wales: The National Development Framework and aligns with Planning Policy Wales (PPW), and that the tests of soundness (as set out in the ‘LDP Manual’) are addressed.
National planning policies are set out in Planning Policy Wales (PPW) Edition 11, which seeks to deliver high quality, sustainable places through a place-making approach. The implementation of the core policy areas in PPW, such as adopting a sustainable spatial strategy, appropriate housing and economic growth levels, infrastructure delivery and place-making, are articulated in more detail in the LDP Manual (Edition 3). We expect the core elements of the Manual, in particular Chapter 5 and the ‘De-risking Checklist(s) to be followed. The development planning system in Wales is evidence led and demonstrating how a plan is shaped by the evidence is a key requirement of the LDP examination.
After considering the key issues and policies in Future Wales, the Welsh Government is of the view that the level and spatial distribution of growth is in general conformity with Future Wales: The National Development Framework. However, the Statement of General Conformity (Annex 1 to this letter) is a ‘caveated response’. Annex 2 of this letter raises fundamental inconsistencies regarding the total housing provision and until these matters have been addressed and their implications understood, it is not possible to give a firm view on matters of general conformity at this time. Annex 2 of this letter also highlights a range of issues that need to be addressed for the plan to align with PPW and DPM. Collectively, our comments highlight a range of issues that need to be addressed for the plan to be considered ‘sound’ as follows:
Annex 1 – General Conformity with Future Wales (Caveated Response)
· Regional Collaboration/Level of growth Further clarity required. Annex 2 – Core matters that need to be addressed (PPW and the DPM)
Our representations are separated into three categories set out by topic area, with further detail in the attached annex.
Category A: Fundamental issues that are considered to present a significant degree of risk for the LPA if not addressed prior to submission stage and may have implications for the plan’s strategy.
None.
Category B: Matters where it appears that the deposit plan has not satisfactorily translated national policy down to the local level and there may be tensions within the plan, namely (not exhaustive):
· Level of Housing Provision
· Delivery and Viability
· Restriction of new homes to Class C3 only
· Gypsy and Traveller Provision
· Best and Most Versatile Land (BMV)
Category C: Whilst not considered to be fundamental to the soundness of the LDP, we consider there to be a lack of certainty or clarity on the following matters:
· Flooding
· Renewable Energy
· Minerals
· Phosphates
I would urge you to seek your own legal advice to ensure you have met all the procedural requirements, including the Sustainability Appraisal (SA), Strategic Environmental Assessment (SEA) and Habitats Regulation Assessment (HRA), as responsibility for these matters rests with your authority. A requirement to undertake a Health Impact Assessment (HIA) arising from the Public Health (Wales) Act 2017, if appropriate, should be carried out to assess the likely effect of the proposed development plan on health, mental well-being and inequality.
It is for your Authority to ensure that the LDP is ‘sound’, and it will be for the Inspector to determine how the examination proceeds if you submit the plan without addressing the concerns we raise. My colleagues and I look forward to meeting you and the team to discuss matters arising from this response.

Atodiadau:


Ein hymateb:

Disagree. The policies and proposals of the LDP are considered sound and deliverable emerging from a robust evidence base and having been formulated with regard to national planning policy. Furthermore, all sites with extant planning permission for mineral workings and their associated buffer zones are set out in Appendix 4 of the Plan. Matter to be further considered at examination.

Gwrthwynebu

Ail Gynllun Datblygu Lleol Adneuo Diwygiedig Sir Gaerfyrddin

Atodiad 4: Safleoedd Mwynau

ID sylw: 5564

Derbyniwyd: 12/04/2023

Ymatebydd: Welsh Government

Cydymffurfio â’r gyfraith? Heb nodi

Cadarn? Heb nodi

Crynodeb o'r Gynrychiolaeth:

Appendix 4 of the plan identifies several inactive and dormant mineral sites. The authority should explain the likelihood of these sites being reactivated and worked within the plan period.
(Category C Objection)

Testun llawn:

Thank you for consulting the Welsh Government on the Carmarthenshire County Council Local Development Plan (LDP) 2nd Deposit plan and documents. It is essential the authority is covered by an up-to-date LDP to give certainty to local communities and business.
Without prejudice to the Minster’s powers, the Welsh Government is committed to helping Local Planning Authorities (LPAs) minimise the risk of submitting unsound plans by making comments at the earliest stages of plan preparation. The Welsh Government looks for clear evidence that the plan is in general conformity with Future Wales: The National Development Framework and aligns with Planning Policy Wales (PPW), and that the tests of soundness (as set out in the ‘LDP Manual’) are addressed.
National planning policies are set out in Planning Policy Wales (PPW) Edition 11, which seeks to deliver high quality, sustainable places through a place-making approach. The implementation of the core policy areas in PPW, such as adopting a sustainable spatial strategy, appropriate housing and economic growth levels, infrastructure delivery and place-making, are articulated in more detail in the LDP Manual (Edition 3). We expect the core elements of the Manual, in particular Chapter 5 and the ‘De-risking Checklist(s) to be followed. The development planning system in Wales is evidence led and demonstrating how a plan is shaped by the evidence is a key requirement of the LDP examination.
After considering the key issues and policies in Future Wales, the Welsh Government is of the view that the level and spatial distribution of growth is in general conformity with Future Wales: The National Development Framework. However, the Statement of General Conformity (Annex 1 to this letter) is a ‘caveated response’. Annex 2 of this letter raises fundamental inconsistencies regarding the total housing provision and until these matters have been addressed and their implications understood, it is not possible to give a firm view on matters of general conformity at this time. Annex 2 of this letter also highlights a range of issues that need to be addressed for the plan to align with PPW and DPM. Collectively, our comments highlight a range of issues that need to be addressed for the plan to be considered ‘sound’ as follows:
Annex 1 – General Conformity with Future Wales (Caveated Response)
· Regional Collaboration/Level of growth Further clarity required. Annex 2 – Core matters that need to be addressed (PPW and the DPM)
Our representations are separated into three categories set out by topic area, with further detail in the attached annex.
Category A: Fundamental issues that are considered to present a significant degree of risk for the LPA if not addressed prior to submission stage and may have implications for the plan’s strategy.
None.
Category B: Matters where it appears that the deposit plan has not satisfactorily translated national policy down to the local level and there may be tensions within the plan, namely (not exhaustive):
· Level of Housing Provision
· Delivery and Viability
· Restriction of new homes to Class C3 only
· Gypsy and Traveller Provision
· Best and Most Versatile Land (BMV)
Category C: Whilst not considered to be fundamental to the soundness of the LDP, we consider there to be a lack of certainty or clarity on the following matters:
· Flooding
· Renewable Energy
· Minerals
· Phosphates
I would urge you to seek your own legal advice to ensure you have met all the procedural requirements, including the Sustainability Appraisal (SA), Strategic Environmental Assessment (SEA) and Habitats Regulation Assessment (HRA), as responsibility for these matters rests with your authority. A requirement to undertake a Health Impact Assessment (HIA) arising from the Public Health (Wales) Act 2017, if appropriate, should be carried out to assess the likely effect of the proposed development plan on health, mental well-being and inequality.
It is for your Authority to ensure that the LDP is ‘sound’, and it will be for the Inspector to determine how the examination proceeds if you submit the plan without addressing the concerns we raise. My colleagues and I look forward to meeting you and the team to discuss matters arising from this response.

Atodiadau:


Ein hymateb:

Disagree. The policies and proposals of the LDP are considered sound and deliverable emerging from a robust evidence base and having been formulated with regard to national planning policy. The likelihood of inactive and dormant sites being reactivated is an iterative process that is considered by the Development Management Team (Minerals).

Gwrthwynebu

Ail Gynllun Datblygu Lleol Adneuo Diwygiedig Sir Gaerfyrddin

Polisi Strategol SP 18: Adnoddau Mwynol

ID sylw: 5565

Derbyniwyd: 12/04/2023

Ymatebydd: Welsh Government

Cydymffurfio â’r gyfraith? Heb nodi

Cadarn? Heb nodi

Crynodeb o'r Gynrychiolaeth:

A Statement of Sub-regional Collaboration (SSRC) has been produced in the Swansea City Sub-Region and another is being prepared in West Wales with Carmarthenshire working with the adjoining sub-region to help satisfy the requirements of RTS2 in respect of sand and gravel provision. Both SSRC’s should be included as part of the evidence base when the plan is submitted for examination.
(Category C Objection)

Testun llawn:

Thank you for consulting the Welsh Government on the Carmarthenshire County Council Local Development Plan (LDP) 2nd Deposit plan and documents. It is essential the authority is covered by an up-to-date LDP to give certainty to local communities and business.
Without prejudice to the Minster’s powers, the Welsh Government is committed to helping Local Planning Authorities (LPAs) minimise the risk of submitting unsound plans by making comments at the earliest stages of plan preparation. The Welsh Government looks for clear evidence that the plan is in general conformity with Future Wales: The National Development Framework and aligns with Planning Policy Wales (PPW), and that the tests of soundness (as set out in the ‘LDP Manual’) are addressed.
National planning policies are set out in Planning Policy Wales (PPW) Edition 11, which seeks to deliver high quality, sustainable places through a place-making approach. The implementation of the core policy areas in PPW, such as adopting a sustainable spatial strategy, appropriate housing and economic growth levels, infrastructure delivery and place-making, are articulated in more detail in the LDP Manual (Edition 3). We expect the core elements of the Manual, in particular Chapter 5 and the ‘De-risking Checklist(s) to be followed. The development planning system in Wales is evidence led and demonstrating how a plan is shaped by the evidence is a key requirement of the LDP examination.
After considering the key issues and policies in Future Wales, the Welsh Government is of the view that the level and spatial distribution of growth is in general conformity with Future Wales: The National Development Framework. However, the Statement of General Conformity (Annex 1 to this letter) is a ‘caveated response’. Annex 2 of this letter raises fundamental inconsistencies regarding the total housing provision and until these matters have been addressed and their implications understood, it is not possible to give a firm view on matters of general conformity at this time. Annex 2 of this letter also highlights a range of issues that need to be addressed for the plan to align with PPW and DPM. Collectively, our comments highlight a range of issues that need to be addressed for the plan to be considered ‘sound’ as follows:
Annex 1 – General Conformity with Future Wales (Caveated Response)
· Regional Collaboration/Level of growth Further clarity required. Annex 2 – Core matters that need to be addressed (PPW and the DPM)
Our representations are separated into three categories set out by topic area, with further detail in the attached annex.
Category A: Fundamental issues that are considered to present a significant degree of risk for the LPA if not addressed prior to submission stage and may have implications for the plan’s strategy.
None.
Category B: Matters where it appears that the deposit plan has not satisfactorily translated national policy down to the local level and there may be tensions within the plan, namely (not exhaustive):
· Level of Housing Provision
· Delivery and Viability
· Restriction of new homes to Class C3 only
· Gypsy and Traveller Provision
· Best and Most Versatile Land (BMV)
Category C: Whilst not considered to be fundamental to the soundness of the LDP, we consider there to be a lack of certainty or clarity on the following matters:
· Flooding
· Renewable Energy
· Minerals
· Phosphates
I would urge you to seek your own legal advice to ensure you have met all the procedural requirements, including the Sustainability Appraisal (SA), Strategic Environmental Assessment (SEA) and Habitats Regulation Assessment (HRA), as responsibility for these matters rests with your authority. A requirement to undertake a Health Impact Assessment (HIA) arising from the Public Health (Wales) Act 2017, if appropriate, should be carried out to assess the likely effect of the proposed development plan on health, mental well-being and inequality.
It is for your Authority to ensure that the LDP is ‘sound’, and it will be for the Inspector to determine how the examination proceeds if you submit the plan without addressing the concerns we raise. My colleagues and I look forward to meeting you and the team to discuss matters arising from this response.

Atodiadau:


Ein hymateb:

The finalised SSRC for the Swansea City Sub-Region will be submitted as part of the evidence base with the Plan. The SSRC for West Wales is currently being prepared and a Position Statement detailing this has been produced, and will be submitted with the Plan for examination.

Cefnogi

Ail Gynllun Datblygu Lleol Adneuo Diwygiedig Sir Gaerfyrddin

CCH4: Ansawdd Dŵr a Diogelu Adnoddau Dŵr

ID sylw: 5566

Derbyniwyd: 12/04/2023

Ymatebydd: Welsh Government

Crynodeb o'r Gynrychiolaeth:

Phosphates
In January 2021, Natural Resources Wales (NRW) published evidence that showed over 60% of riverine Special Areas of Conservation (SAC) waterbodies failed against phosphorus standards. As a result of these failings, NRW issued planning advice to avoid further deterioration in environmental capacity where new developments have the potential to affect phosphorus sensitive riverine SACs and achieve ‘nutrient neutrality’.
The advice from NRW relates to riverine SACs whose drainage catchments extend into Carmarthenshire, namely the Afon Teifi, Afon Tywi, Afon Cleddau, River Wye and River Usk. Of these five waterbodies, only two are affected by the proposed housing allocations in the plan draining to either the Afon Teifi or Afon Tywi.
The Council has sought to reduce the number of housing allocations in the Afon Tywi to six sites (102 units) and fifteen sites (189 units) in the Afon Teifi. The impact of these reductions has reduced phosphorous levels by 43% and 49% respectively in each of the waterbodies. This reduction, coupled with amendments to Policy CCH4 and the availability of land for potential wetland creation to promote the natural uptake of phosphates in Carmarthenshire, have all been screened as part of the Councils Habitats Regulations Assessment (February 2023) and concluded that the plan will have no adverse effect on the integrity of European sites. The delivery of allocated sites and implementation of long-term mitigation measures is for the statutory bodies of NRW and Welsh Water (WW) to comment in more detail.
(Category C)

Testun llawn:

Thank you for consulting the Welsh Government on the Carmarthenshire County Council Local Development Plan (LDP) 2nd Deposit plan and documents. It is essential the authority is covered by an up-to-date LDP to give certainty to local communities and business.
Without prejudice to the Minster’s powers, the Welsh Government is committed to helping Local Planning Authorities (LPAs) minimise the risk of submitting unsound plans by making comments at the earliest stages of plan preparation. The Welsh Government looks for clear evidence that the plan is in general conformity with Future Wales: The National Development Framework and aligns with Planning Policy Wales (PPW), and that the tests of soundness (as set out in the ‘LDP Manual’) are addressed.
National planning policies are set out in Planning Policy Wales (PPW) Edition 11, which seeks to deliver high quality, sustainable places through a place-making approach. The implementation of the core policy areas in PPW, such as adopting a sustainable spatial strategy, appropriate housing and economic growth levels, infrastructure delivery and place-making, are articulated in more detail in the LDP Manual (Edition 3). We expect the core elements of the Manual, in particular Chapter 5 and the ‘De-risking Checklist(s) to be followed. The development planning system in Wales is evidence led and demonstrating how a plan is shaped by the evidence is a key requirement of the LDP examination.
After considering the key issues and policies in Future Wales, the Welsh Government is of the view that the level and spatial distribution of growth is in general conformity with Future Wales: The National Development Framework. However, the Statement of General Conformity (Annex 1 to this letter) is a ‘caveated response’. Annex 2 of this letter raises fundamental inconsistencies regarding the total housing provision and until these matters have been addressed and their implications understood, it is not possible to give a firm view on matters of general conformity at this time. Annex 2 of this letter also highlights a range of issues that need to be addressed for the plan to align with PPW and DPM. Collectively, our comments highlight a range of issues that need to be addressed for the plan to be considered ‘sound’ as follows:
Annex 1 – General Conformity with Future Wales (Caveated Response)
· Regional Collaboration/Level of growth Further clarity required. Annex 2 – Core matters that need to be addressed (PPW and the DPM)
Our representations are separated into three categories set out by topic area, with further detail in the attached annex.
Category A: Fundamental issues that are considered to present a significant degree of risk for the LPA if not addressed prior to submission stage and may have implications for the plan’s strategy.
None.
Category B: Matters where it appears that the deposit plan has not satisfactorily translated national policy down to the local level and there may be tensions within the plan, namely (not exhaustive):
· Level of Housing Provision
· Delivery and Viability
· Restriction of new homes to Class C3 only
· Gypsy and Traveller Provision
· Best and Most Versatile Land (BMV)
Category C: Whilst not considered to be fundamental to the soundness of the LDP, we consider there to be a lack of certainty or clarity on the following matters:
· Flooding
· Renewable Energy
· Minerals
· Phosphates
I would urge you to seek your own legal advice to ensure you have met all the procedural requirements, including the Sustainability Appraisal (SA), Strategic Environmental Assessment (SEA) and Habitats Regulation Assessment (HRA), as responsibility for these matters rests with your authority. A requirement to undertake a Health Impact Assessment (HIA) arising from the Public Health (Wales) Act 2017, if appropriate, should be carried out to assess the likely effect of the proposed development plan on health, mental well-being and inequality.
It is for your Authority to ensure that the LDP is ‘sound’, and it will be for the Inspector to determine how the examination proceeds if you submit the plan without addressing the concerns we raise. My colleagues and I look forward to meeting you and the team to discuss matters arising from this response.

Atodiadau:


Ein hymateb:

Comments noted

Am gyfarwyddiadau ar sut I ddefnyddio’r system ac I wneud sylwadau, gwelwch ein canllaw cymorth.