Yn dangos sylwadau a ffurflenni 1 i 8 o 8

Gwrthwynebu

Matters Arising Changes 2026

ID sylw: 5962

Derbyniwyd: 24/06/2026

Respondent ID: 2703

Ymatebydd: Lyndon Kervin

Cadarn? Nac Ydi

Crynodeb o'r Gynrychiolaeth:

In previous consultations there has been much discussion and evidence of continuing excessive water problems at the site. It makes no sense whatsoever to exacerbate the situation with more housing - see pictures attached of flooding in recent months.


Ein hymateb:

The new housing allocation SeC6(iii) was included as an additional site during the Examination. It has been subject to full consideration through the site assessment methodology. As part of this assessment process a detailed site pro forma has been prepared, and any potential constraints have been considered.

Gwrthwynebu

Matters Arising Changes 2026

ID sylw: 5963

Derbyniwyd: 25/06/2026

Respondent ID: 5948

Ymatebydd: Mr Aled Francis

Cadarn? Nac Ydi

Crynodeb o'r Gynrychiolaeth:

I object to sites SR/069/001 and SR/069/003 in Fforest for inclusion in the Carmarthenshire LDP. The council previously judged no extra land was needed; priority should be reusing empty homes, and recent Clos Benallt expansion has not supported local people or the Welsh language. The land is unsuitable: wet, spring-fed, with known drainage failures, sinking foundations and flood risk, contrary to TAN 15. Existing attenuation has already failed. Further development would worsen severe traffic congestion (TAN 18), harm residents, and threaten an adjacent SSSI. It would erode countryside character (TAN 5) and overburden already stretched infrastructure in this area.


Ein hymateb:

The new housing allocation SeC6(iii) was included as an additional site during the Examination. It has been subject to full consideration through the site assessment methodology. As part of this assessment process a detailed site pro forma has been prepared, and any potential constraints have been considered.

Gwrthwynebu

Matters Arising Changes 2026

ID sylw: 5966

Derbyniwyd: 25/06/2026

Respondent ID: 5949

Ymatebydd: Miss Andrea Mckay

Cadarn? Nac Ydi

Crynodeb o'r Gynrychiolaeth:

Traffic is the biggest concern with safety congestion and already existing problems with junction 48. Council previously took the view that there was adequate residential land. The wet land contains known drainage constraints.


Ein hymateb:

The new housing allocation SeC6(iii) was included as an additional site during the Examination. It has been subject to full consideration through the site assessment methodology. As part of this assessment process a detailed site pro forma has been prepared, and any potential constraints have been considered.

Gwrthwynebu

Matters Arising Changes 2026

ID sylw: 5970

Derbyniwyd: 25/06/2026

Respondent ID: 5948

Ymatebydd: Mr Aled Francis

Cadarn? Nac Ydi

Crynodeb o'r Gynrychiolaeth:

I object to sites SR/069/001 and SR/069/003 in Fforest for inclusion in the Carmarthenshire LDP. The council previously judged no extra land was needed; priority should be reusing empty homes, and recent Clos Benallt expansion has not supported local people or the Welsh language. The land is unsuitable: wet, spring-fed, with known drainage failures, sinking foundations and flood risk, contrary to TAN 15. Existing attenuation has already failed. Further development would worsen severe traffic congestion (TAN 18), harm residents, and threaten an adjacent SSSI. It would erode countryside character (TAN 5) and overburden already stretched infrastructure in this area.

Atodiadau:


Ein hymateb:

The new housing allocation SeC6(iii) was included as an additional site during the Examination. It has been subject to full consideration through the site assessment methodology. As part of this assessment process a detailed site pro forma has been prepared, and any potential constraints have been considered.

Gwrthwynebu

Matters Arising Changes 2026

ID sylw: 5973

Derbyniwyd: 25/06/2026

Respondent ID: 5950

Ymatebydd: Miss Bronwen Hill

Cadarn? Nac Ydi

Crynodeb o'r Gynrychiolaeth:

I object to the proposed housing development on the field adjacent to Clos Benallt Fawr, Fforest Road. This green space is important for local wildlife and helps maintain the rural character of the area. The development would significantly increase traffic on Fforest Road, which already experiences congestion. When the M4 Hendy junction is closed due to accidents, roadworks or diversions, traffic is redirected through Fforest Road, causing major delays and disruption for residents. Additional housing would worsen these problems. I am also concerned about drainage, flooding risks and increased pressure on local schools, healthcare services and other infrastructure.


Ein hymateb:

The new housing allocation SeC6(iii) was included as an additional site during the Examination. It has been subject to full consideration through the site assessment methodology. As part of this assessment process a detailed site pro forma has been prepared, and any potential constraints have been considered.

Gwrthwynebu

Matters Arising Changes 2026

ID sylw: 5976

Derbyniwyd: 25/06/2026

Respondent ID: 5951

Ymatebydd: Miss Sara Hill

Cadarn? Nac Ydi

Crynodeb o'r Gynrychiolaeth:

I object to the proposed housing development on the field adjacent to Clos Benallt Fawr, Fforest Road.
This green space is important for local wildlife and helps maintain the rural character of the area. The development would significantly increase traffic on forest Road, which already experiences congestion. When the M4 Hendy junction is closed due to accidents, roadworks or diversions, traffic is redirected through forest Road, causing major delays and disruption for residents. Additional housing would worsen these problems. I am also concerned about drainage, flooding risks and increased pressure on local schools, healthcare services and infrastructure


Ein hymateb:

The new housing allocation SeC6(iii) was included as an additional site during the Examination. It has been subject to full consideration through the site assessment methodology. As part of this assessment process a detailed site pro forma has been prepared, and any potential constraints have been considered.

Gwrthwynebu

Matters Arising Changes 2026

ID sylw: 5978

Derbyniwyd: 26/06/2026

Respondent ID: 5952

Ymatebydd: Mr Kallum Hayward

Cadarn? Nac Ydi

Crynodeb o'r Gynrychiolaeth:

Representation summary -

I object to the proposed housing development on the field adjacent to Clos Benallt Fawr, Fforest Road.
This green space is important for local wildlife and helps maintain the rural character of the area. The development would significantly increase traffic on forest Road, which already experiences congestion. When the M4 Hendy junction is closed due to accidents, roadworks or diversions, traffic is redirected through forest Road, causing major delays and disruption for residents. Additional housing would worsen these problems. I am also concerned about drainage, flooding risks and increased pressure on local schools, healthcare services and infrastructure.


Ein hymateb:

The new housing allocation SeC6(iii) was included as an additional site during the Examination. It has been subject to full consideration through the site assessment methodology. As part of this assessment process a detailed site pro forma has been prepared, and any potential constraints have been considered.

Gwrthwynebu

Matters Arising Changes 2026

ID sylw: 6008

Derbyniwyd: 26/06/2026

Respondent ID: 2703

Ymatebydd: Lyndon Kervin

Cadarn? Heb nodi

Crynodeb o'r Gynrychiolaeth:

Whilst the respondent refers to MACM/SeC6/f in his objection, the actual objection is for the site to the rear i.e additional site MACM/SeC6/c citing concerns regarding flooding on the site.

Atodiadau:


Ein hymateb:

The new housing allocation SeC6(iii) was included as an additional site during the Examination. It has been subject to full consideration through the site assessment methodology. As part of this assessment process a detailed site pro forma has been prepared, and any potential constraints have been considered.