SeC14/h1

Yn dangos sylwadau a ffurflenni 1 i 2 o 2

Gwrthwynebu

Ail Gynllun Datblygu Lleol Adneuo Diwygiedig Sir Gaerfyrddin

ID sylw: 5187

Derbyniwyd: 12/04/2023

Respondent ID: 4967

Ymatebydd: Evans Banks Planning Limited

Cydymffurfio â’r gyfraith? Heb nodi

Cadarn? Nac Ydi

Crynodeb o'r Gynrychiolaeth:

Object to the inclusion of the allocation and that its inclusion within the Plan would result in the document being ‘unsound’. A Full Planning Application was made to the Council for the Proposed Residential Development of 16 Dwellings which was subsequently refused in 2019. The application was refused for a number of reasons including the applicant not signing a Section 106 agreement as well as the site being within a Special Area of Conservation. The failure of the applicant to commit to signing the S106 Agreement in itself puts the deliverability of the site in serious doubt.

We therefore respectfully request that this Representation be given careful examination, and that the allocation be removed to ensure that the document passes all the relevant tests of soundness.


Ein hymateb:

Disagree, the allocation of the site within the LDP for residential purposes has been subject to full consideration through the site assessment methodology. As part of this assessment process a detailed site pro forma has been prepared.

Gwrthwynebu

Ail Gynllun Datblygu Lleol Adneuo Diwygiedig Sir Gaerfyrddin

ID sylw: 5824

Derbyniwyd: 14/04/2023

Respondent ID: 3885

Ymatebydd: Ffos Las Ltd

Asiant : Carney Sweeney

Cydymffurfio â’r gyfraith? Heb nodi

Cadarn? Nac Ydi

Crynodeb o'r Gynrychiolaeth:

The 2nd Deposit Plan’s evidence base includes a Nutrient Mitigation Options Technical Review report prepared by Ricardo (June 2022). The report notes that the Pencader Sewage Treatment Works and Llandovery Waste Water Treatment works have the highest number of planning applications constrained by phosphorus (page iv of the report). Therefore, it is apparent that future housing development in Pencader and Llandovery is particularly constrained by the need for nutrient neutrality.

We question the deliverability of site allocation ref: SeC14/h2 Blossom Garage. This site has been subject to a recent planning application refusal (ref: W/39283). One of the principal reasons for refusal was the site being located within the catchment of Afon Tywi SAC and not demonstrating phosphate neutrality or betterment.

Atodiadau:


Ein hymateb:

Disagree, the allocation of the site within the LDP for residential purposes has been subject to full consideration through the site assessment methodology. As part of this assessment process a detailed site pro forma has been prepared.