SuV23/h1
Gwrthwynebu
Ail Gynllun Datblygu Lleol Adneuo Diwygiedig Sir Gaerfyrddin
ID sylw: 5482
Derbyniwyd: 11/04/2023
Respondent ID: 5802
Ymatebydd: Dale Bowler
Asiant : Asbri Planning Ltd
Cydymffurfio â’r gyfraith? Heb nodi
Cadarn? Ydi
Object to Policy HOM1 (Housing Allocation) – the Clos Y Parc site has already been built out. Within the deposit plan, the site is allocated for 16 dwellings, all of which have been delivered. Secondly, the site originally formed part of a larger housing allocation in the current adopted LDP which aspired to achieve 34 dwellings but in reality only delivered 25, resulting in a shortfall of 9 dwellings. One way of making up for this shortfall is to permit residential development in other areas of the settlement, and the proposed site at Horeb will positively contribute in this respect.
Disagree, the allocation of the site within the LDP for residential purposes has been subject to full consideration through the site assessment methodology. As part of this assessment process a detailed site pro forma has been prepared.